ML19339A928
| ML19339A928 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 04/01/1975 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Andognini G YANKEE ATOMIC ELECTRIC CO. |
| Shared Package | |
| ML19339A924 | List: |
| References | |
| NUDOCS 8011050710 | |
| Download: ML19339A928 (3) | |
See also: IR 05000029/1975002
Text
f$$f W A~L
'
-
UNITED STATES
h
NUCLEAR REGULATORY COMMISSION
REGloN I
63. ,AR K AVENUE
'
APR
1 1975
xi e o, . oui..
mva~ . ....
Yankee Atomic Electric Company
License No. DPR-3
Attention:
Mr. G. Carl Andognini
Inspection Nr. 50-29/75-02
Assistant to Vice President
20 Turnpike Road
Westborough, Massachusetts 01581
Gentlemen:
This refers to the inspection conducted by Mr. Reynolds of this
office on February 12-14, 1975 at Yankee Rowe, Rowe, Massachusetts
of activities authorized by AEC License No. DPR-3 and to the
discussions of our findings hald by Mr. Reynolds with Mr. Autio
and other me.'bers of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection & Enforcement Inspection Report which is enclosed with
this letter. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
inturviews with personnel, measure =ents made by the inspector,
and observations by the inspector.
During this inspection, it was found that certain of your activities
appeared to be in violation of AEC requirements. The items and
references to the pertinent requiremenr.s are listed in the enclosure
to this letter. This letter constitu';es a notice sent to you
pursuant to the provisions of Sectic.t 2.201 of the AEC's " Rules
'
of Practice", Part 2, Title 10, Cc 1 c f Federal Regulations.
Section 2.201 requires you to su',ctic w this office within 20 days
of your receipt of this notice, a written statement of explanation
in reply, including: (1) corrective steps which have been or will
be taken by you, and the results achieved;-(2) corrective steps
which will be taken to avoid further violations; and (3) the date
when full compliance will be achieved.
In addition to the need
for corrective action regarding these specific Items of Noncompliance,
we are concerned about the implementation of your management control
systems that permitted these items to occur. Consequently, in your
reply, you should describe in particular, those actions taken or
planned to improve the effectiveness of your management control
systems. Your response will be fully considered in our continuing
evaluation of your health physics program and we plan to inspect your
corrective actions at an early date.
WTIC4
%
.
. ..
-.
(1
2
%e.es
.
80Doso 7/o
.
_
.
. -
. . _ _ _
_ . _ _
_. .
_
_ . .
. ~ . _ _ . . .
_ . .
. . _ _ _
_ . _ _ _ _ _ _ . _
_
__
,
.
.
,
,
Yankee Atomic Electric Company
.
'
'
-2-
!
.
]
As indicated in Enclosure No. I to this letter, we note that you
-
I
have corrected Item No. B.I.(b), and therefore, you need not address
j
yourself to this matter in your response.
!
In accordance with Section . 2.790 of the AEC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this
l
letter and the enclosed inspection report will be placed in the
NRC's Public Document Room. If this report contains any information
J
that you (or your contractor) believe to be proprietary, it is
,
1
'necessary that you make a written application within.20 days to
j
this office to withhold such information from public disclosure.
I
Any such application must include a full statement of the
!
reasons on the basis of which it is claimed that the information
!
is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a
separate part of the document.
If we do not hear from you in
'
this regard within the specified period, the report will be
placed in the Public Document Room.
Should you have any questions concerning this inspection, we will
be rieased to discuss them with you.
"
Sincerely,
.
I
0
y
)
mes P. O'Reilly
Di ector
_
Enclosures:
1.
Description of Violations
i
2.
IE Inspection Report No.- 50-29/75-02
cc:
H. Autio, Plant Superintendent
D. G. Allen, President
,
I
,
,
. ..
7
.
.
.-
-..
_
..
. .
-
. .
.
- -.
_-
...
. . , .-
. .._
__
_
__
'
.
.
.
,
.
.
. - .
-
.
.
.
.
-
_
.
.
Yankee Atomic Electric Company
. ,
_
,
'
3
,
. ... .
..
. .
-
. _ . . - . . . . .
...
.
'sec's : IE Chief, FS&EB
IE:HQ (4 epys.of ler., 5 epys of report)
IE Files
Central Mail & Files
DL (4 cpys of ltr., 13 cpys of report)
RS (1 cpy of ltr., 3 cpys of report)
Local PDR
N S'.i'
REG:I Reading Room
Regional Directors (II, III, IV) (Report Only)
State of Massachusetts
.
4
.
.
.
.
- .
-
-
.
. . . ,
. . _ ,
.
v.
e
. . -
c,
.
.