Forwards IE Insp Rept 50-029/75-02 on 750212-14 & Notice of Violation
ML19339A928
Person / Time
Site: Yankee Rowe
Issue date: 04/01/1975
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML19339A924 List:
References
NUDOCS 8011050710
Download: ML19339A928 (3)


See also: IR 05000029/1975002

Text

f$$f W A~L

'

-

UNITED STATES

h

NUCLEAR REGULATORY COMMISSION

REGloN I

63. ,AR K AVENUE

'

APR

1 1975

xi e o, . oui..

mva~ . ....

Yankee Atomic Electric Company

License No. DPR-3

Attention:

Mr. G. Carl Andognini

Inspection Nr. 50-29/75-02

Assistant to Vice President

20 Turnpike Road

Westborough, Massachusetts 01581

Gentlemen:

This refers to the inspection conducted by Mr. Reynolds of this

office on February 12-14, 1975 at Yankee Rowe, Rowe, Massachusetts

of activities authorized by AEC License No. DPR-3 and to the

discussions of our findings hald by Mr. Reynolds with Mr. Autio

and other me.'bers of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection & Enforcement Inspection Report which is enclosed with

this letter. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

inturviews with personnel, measure =ents made by the inspector,

and observations by the inspector.

During this inspection, it was found that certain of your activities

appeared to be in violation of AEC requirements. The items and

references to the pertinent requiremenr.s are listed in the enclosure

to this letter. This letter constitu';es a notice sent to you

pursuant to the provisions of Sectic.t 2.201 of the AEC's " Rules

'

of Practice", Part 2, Title 10, Cc 1 c f Federal Regulations.

Section 2.201 requires you to su',ctic w this office within 20 days

of your receipt of this notice, a written statement of explanation

in reply, including: (1) corrective steps which have been or will

be taken by you, and the results achieved;-(2) corrective steps

which will be taken to avoid further violations; and (3) the date

when full compliance will be achieved.

In addition to the need

for corrective action regarding these specific Items of Noncompliance,

we are concerned about the implementation of your management control

systems that permitted these items to occur. Consequently, in your

reply, you should describe in particular, those actions taken or

planned to improve the effectiveness of your management control

systems. Your response will be fully considered in our continuing

evaluation of your health physics program and we plan to inspect your

corrective actions at an early date.

WTIC4

%

.

. ..

-.

(1

2

%e.es

.

80Doso 7/o

.

_

.

. -

. . _ _ _

_ . _ _

_. .

_

_ . .

. ~ . _ _ . . .

_ . .

. . _ _ _

_ . _ _ _ _ _ _ . _

_

__

,

.

.

,

,

Yankee Atomic Electric Company

.

'

'

-2-

!

.

]

As indicated in Enclosure No. I to this letter, we note that you

-

I

have corrected Item No. B.I.(b), and therefore, you need not address

j

yourself to this matter in your response.

!

In accordance with Section . 2.790 of the AEC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this

l

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room. If this report contains any information

J

that you (or your contractor) believe to be proprietary, it is

,

1

'necessary that you make a written application within.20 days to

j

this office to withhold such information from public disclosure.

I

Any such application must include a full statement of the

!

reasons on the basis of which it is claimed that the information

!

is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a

separate part of the document.

If we do not hear from you in

'

this regard within the specified period, the report will be

placed in the Public Document Room.

Should you have any questions concerning this inspection, we will

be rieased to discuss them with you.

"

Sincerely,

.

I

0

y

)

mes P. O'Reilly

Di ector

_

Enclosures:

1.

Description of Violations

i

2.

IE Inspection Report No.- 50-29/75-02

cc:

H. Autio, Plant Superintendent

D. G. Allen, President

,

I

,

,

. ..

7

.

.

.-

-..

_

..

. .

-

. .

.

- -.

_-

...

. . , .-

. .._

__

_

__

'

.

.

.

,

.

.

. - .

-

.

.

.

.

-

_

.

.

Yankee Atomic Electric Company

. ,

_

,

'

3

,

. ... .

..

. .

-

. _ . . - . . . . .

...

.

'sec's : IE Chief, FS&EB

IE:HQ (4 epys.of ler., 5 epys of report)

IE Files

Central Mail & Files

DL (4 cpys of ltr., 13 cpys of report)

RS (1 cpy of ltr., 3 cpys of report)

PDR

Local PDR

N S'.i'

TIC

REG:I Reading Room

Regional Directors (II, III, IV) (Report Only)

OGC

State of Massachusetts

.

4

.

.

.

.

- .

-

-

.

. . . ,

. . _ ,

.

v.

e

. . -

c,

.

.