ML19338G238
| ML19338G238 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 10/02/1980 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| References | |
| NUDOCS 8010280667 | |
| Download: ML19338G238 (1) | |
Text
. _ _ _
N M
- c UNITED STATES
~g NUCLEAR REGULATORY COMMISSION g
REGION V
,e"[
1990 N. CALIFORNIA BOULEVARD o,
%,te,,a SulTE 202, WALNUT CREEK PLAZA WALNUT CREE K, CALIFORNIA 94506 October 2, 1930 Docket ilos. 50-206, 50-361,60-362 I
Southern California Edison Company P. O. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention:
Dr. L. T. Papay, Vice President
. Advanced Engineering Gentlemen:
The enclosed Circular do. 80-22 is forwarded to you for information.
No i
written response is required.
Should you have any questions related to your understanding of the reconnendations on this matter, please contact this office.
Sincerely, f
[
R e
/ Director
Enclosures:
1.
IE Circular Ho. 30-22 2.
Recently issued IE Circulars cc w/ enclosures:
J. 21. Curran, SCE R. Dietch, SCE s
se2
- 6.6 7
i SSINS: 6830 Accession f!o.:
i 8006190055 IEC 80-22 UilITED STATES
!!UCLEAR REGULATORY COMMISSION N
fj f SPrP d J@g y 0FFICE OF IllSPECTIO;l AtlD EfiFORCEf tEflT
!!ASHI!!GT0!1, D.C.
20555 October 2, 1980 IE Circular flo. 80-22: C0rlFIRMATI0ft 0F EftPLOYEE OVALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actions a utility and an' architect-enoineering company employed technically unqualified individuals as designers / engineers by failing to confirm _ the validity of-their technical and educational qualifications as presented in their enployment aaplications.
In both of these instances, the employers mistakenly assumed that the eersonnel firms supplying these individuals had investigated and confirmed previous _ career experiences.
In view of the fact that the unqualified persons in both of these cases were discovered as a result of alleaations to this effect, rather than through internal company procedures, we believe that tnis matter warrants your attention.
We are hereby reconnending that your employment procedures be reviewed to determine that your company has in effect employment policies which confirm the professional qualific ^ ions of employees.
In the event you conclude that your present procedures do not fully address this matter, we reccmmend that you take prompt remedial action in this regard.
flo written response to this Circular is required.
If you desire additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.
~
% M-(J
~wx 3 '
N*
L-~
d y
p
& e)-
IEC 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Date of No.
Subject Issue Issued to 80-21 Regulation of refueling 9/10/80 All holders of a 4
crews power reactor OL or CP 80-20 Changes in Safe-Slab Tank 8/21/80 All Part 50 and Part Dimensions 70 fuel facility licensees i
80-19 Noncompliance with 8/26/80 All medical licensees License Reouirements for Medical Licensees i 8 i
80-13 10 CFR 50.59 Safety 8/22/80 All power reactor Evaluations for Changes to facilities with an Radioactive Waste Treatment OL or CP 4
l Systems 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR Jet from Daffle Plate Corner OLs and PW9 cps 80-16 Operational Deficiencies In 6/77/30 All power reactor 4
Rosemount Model 510DU Trip facilities with an Units And Model 1152 Pressure OL or a CP Transmitters 80-15 Loss of Reactor Coolant Pump 6/20/80 All power reactor
- Cooling and Natural Circula-facilities with an tion Cooldown OL or CP 80-14 Radioactive Contamination of 6/24/80 All holders of power Plant Demineralized Water and research reactor System and Resultant Internal licenses (operatin" Contamination of Personnel and construction permits), and fuei cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of reactor j
Westinghouse' Fuel Assemblies OLs and cps i.
80-12
~ Valve-Shaf t-To-Actuator Key 5/14/80 All holders of reactor i
May Fall Out of Place When OLs and cps Mounted Below !!orizontal Axis 80 Emergency Diesel Generator
' 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP O -
6 y
y7
..,i.--
.r-
--r-
..y.m-
-m..e
.. - - ~.
-y.
,7---
-.*.m..-r
.., -,, + -, -,