>* **%q'o
UNITED STATES
es>
g
,'
!
NUCLEAR REEULATORY COMMISSION
o
g
REGION 11
e
o
101 MARIETTA ST., N.W.. SUITE 3100
e
ATLANTA. GEORotA 303o3
JUN 171980
In Reply Refer To:
RII:JJB
50-324/80-20
50-325/80-23
Carolina Power and Light Company
ATTN:
J. A. Jones
Senior Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers to the inspection conducted by J. J. Blake of this office on May 27
through 30, 1980 of activities authorized by NRC Operating License Nos. DPR-62
and DPR-71 for the Brunswick Steam Electric Plant facility, and to the discussion
of our findings held with A. C. Tollison, Jr. , at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Pules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary intor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
i
l
soo9 MOM
1
_ .._ _
-
.
-
. -
Carolina Power and LightlCompany.
-2-
gg y 7 ggg
Should you have any questions concerning this letter, we will be glad to_ discuss
them with you.
Sincerely,
.-.
C. E. Murphy, Chie
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-326/80-20
and 50-325/80-23
cc w/ encl:
A. C. Tollison, Jr.
Plant Manager
Box 458
Southport, NC 28461
.
.