Forwards IE Insp Repts 50-413/80-15 & 50-414/80-15 on 800630-0703 & Notice of Violation
ML19338D997
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/25/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19338D985 List:
References
NUDOCS 8009240307
Download: ML19338D997 (2)


See also: IR 05000413/1980015

Text

,

,Y

  • gg agg

o

UNITE] STATES

8

g

NUCLEAR REGULATORY COMMISSION

.kc

o

t

,a

REGION 11

g*****/[

o,,

101 MARIETTA ST., N.W SUITE 3100

,

ATLARTA, GEORGIA 303o3

JUL 251980

In Reply Refer To:

RII:PKV

50-413/80-15

50-414/80-15

-

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

~ P. O. Box 2178

Charlotte, NC 28242

-

Gentlemen:

This refers to the inspection conducted by P. K. VanDoorn of this office on

June 30 - July 3, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our

findings held with D. G. Beam at the conclusion of the inspection.

,

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed in the

.

enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC reqr.irements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A. This notice is rent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this notice, a vritten statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

,

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when fr ! compliance will be_ achieved.

In accordance with Section 2.790 of the NP.C's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (cr your contractor) believe to be

i

proprietary, it is necessary that you make a written applicatian within 20 days

to this office to withhold such information from public disclosure. An'y such

application must include a full statement of the reasons on the basis of which

it _ is claimed that the information is proprietary, and should be preparei so

80092403O[

. ..

.

JUL '251980

e

' Duke Power Company

-2-

,

that proprietary information. identified in the application is contained in a

separate part of the document. If we do' not hear from you in this regard within

the specified period, the report will be placed in' the Public Document Room.

Should you have any questions concerning this letter, we will be glai t'o discuss

them with you.

-

i

Sincerely,

  1. f

C. E. Murphy,

j

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-413/80-15

and 50-414/80-15

.

cc w/ encl:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager

.

I

)

I

1

.

.

"**kw'

--W r e Ma*-?*--'

hyye-e

gg m, e.,

g.

-..,,w,

,._w....m

r , . , , . . .

, . . . , . , , , _ _ _ . . ,

,,

.M'M-W

FM5_ E

_

,

.