ML19338D997
| ML19338D997 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/25/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19338D985 | List: |
| References | |
| NUDOCS 8009240307 | |
| Download: ML19338D997 (2) | |
See also: IR 05000413/1980015
Text
,
,Y
- gg agg
o
UNITE] STATES
8
g
NUCLEAR REGULATORY COMMISSION
.kc
o
t
,a
REGION 11
g*****/[
o,,
101 MARIETTA ST., N.W SUITE 3100
,
ATLARTA, GEORGIA 303o3
JUL 251980
In Reply Refer To:
RII:PKV
50-413/80-15
50-414/80-15
-
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
~ P. O. Box 2178
Charlotte, NC 28242
-
Gentlemen:
This refers to the inspection conducted by P. K. VanDoorn of this office on
June 30 - July 3, 1980, of activities authorized by NRC Construction Permit Nos.
CPPR-116 and CPPR-117 for the Catawba facility, and to the discussion of our
findings held with D. G. Beam at the conclusion of the inspection.
,
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
Two new unresolved items resulted from this inspection and are discussed in the
.
enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC reqr.irements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A. This notice is rent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a vritten statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
,
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when fr ! compliance will be_ achieved.
In accordance with Section 2.790 of the NP.C's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (cr your contractor) believe to be
i
proprietary, it is necessary that you make a written applicatian within 20 days
to this office to withhold such information from public disclosure. An'y such
application must include a full statement of the reasons on the basis of which
it _ is claimed that the information is proprietary, and should be preparei so
80092403O[
. ..
.
JUL '251980
e
' Duke Power Company
-2-
,
that proprietary information. identified in the application is contained in a
separate part of the document. If we do' not hear from you in this regard within
the specified period, the report will be placed in' the Public Document Room.
Should you have any questions concerning this letter, we will be glai t'o discuss
them with you.
-
i
Sincerely,
- f
C. E. Murphy,
j
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/80-15
and 50-414/80-15
.
cc w/ encl:
J. W. Hampton, Station Manager
D. G. Beam, Project Manager
.