MONTHYEARML19318A4791980-06-0505 June 1980 Forwards Response to IE Bulletin 80-12, Decay Heat Removal Sys Operability. Review Described in Encl 1 Revealed Error. Decay Heat Pump Suction Was Not Isolated by Containment Isolation Actuation as Stated in Page 2 Project stage: Other ML20126D8351980-06-11011 June 1980 Ltr to All Operating PWRs Requesting Amend to Tech Specs Re Decay Heat Removal Capability.Amend Is Necessary to Provide Permanent long-term Assurance That Redundancy Will Be Maintained Project stage: Other ML19318C4301980-06-26026 June 1980 Forwards Addl Info Re Shift Manning,Licensing,Testing of Power Operated Relief Valve Isolation Sys,Automatic Trip of Reactor Coolant Pumps & Small Break LOCA Methods,In Response to NRC Project stage: Other ML19330B7881980-07-25025 July 1980 Notice of Issuance & Availability of Amend 28 to License NPF-3 Project stage: Other ML19330B7851980-07-25025 July 1980 Amend 28 to License NPF-3,revising Tech Spec Setpoint for Automatic Closure of Decay Heat Removal Sys Isolation Valves & Implementing Pressurizer Heat Interlock Project stage: Other ML19337B6211980-09-23023 September 1980 Notifies That Fire Protection Mods Should Be Completed at End of Current Refueling Outage.Requests Revision of Fire Protection Tech Specs within 60 Days.Fire Protection STS Encl Project stage: Other ML20151B3601980-12-26026 December 1980 Application for Amend of License NPF-3 Changing Tech Specs Re Fire Detection Sys,Decay Heat Removal Capabilities,Low Temp RCS Overpressure Event,Axial Power Shaping Rod Insertion Limits & Util Reorganization Project stage: Request ML20009C8881981-07-10010 July 1981 Marked-up Revised Tech Specs 3.4.2,4.4.2,3.4.3,4.4.3, 3.8.1.2,4.8.1.2,4.8.1.1.2,4.8.1.1.2.C.2,3.1.3.6,3/4.2,3.2.1, 4.2.1,3.2.5,6.5.2.2,6.5.2.3,6.5.2.4,6.5.2.5,6.5.2.6, 3/4.7.10,3.7.10,4.7.10,Pages 3/4.7-5,B 3/4.4-19 & 3.8.1.2 Project stage: Other ML20009C8841981-07-10010 July 1981 Forwards Application for Amend of License NPF-3,requesting Revisions to Tech Specs Project stage: Request ML20009C8871981-07-10010 July 1981 Application for Amend of License NPF-3,revising Tech Specs for Auxiliary Feedwater Pump Turbine Speed Switches,Setpoint Index for Pressurizer Electromatic Relief & Code Safety Valves,Emergency Diesel Generator & Administrative Errors Project stage: Request ML20028G3531983-02-0101 February 1983 Forwards Model Tech Specs for Proposed Amend to App a Tech Specs Re DHR Capability Redundancy.Mod Requested to Assure Redundancy in Mode 3.Response Requested within 45 Days. W/O Encl Project stage: Other ML20069E4511983-03-17017 March 1983 Forwards Explanation on How DHR Redundancy Assured in Mode 3 Operation,In Response to NRC .Tech Specs Will Be Revised to Include Applicable Limits by 830513 Project stage: Other ML20023D5501983-05-13013 May 1983 Advises That Due to Difficulties W/Rev,License Amend Request Re DHR Capability Redundancy Will Be Submitted by 830615 Project stage: Other ML20024C2131983-07-0808 July 1983 Proposed Changes to Tech Specs 6.5.1.2,6.5.2.2,Figure 6.2-1 & Figure 6.2-2 Re Util Reorganization Project stage: Request ML20024C2111983-07-0808 July 1983 Application for Amend to License NPF-3,changing Tech Specs 6.5.1.2,6.5.2.2,Figure 6.2-1 & Figure 6.2-2 Re Util Reorganization Project stage: Request ML20024C2081983-07-0808 July 1983 Forwards Application for Amend to License NPF-3,changing Tech Specs 6.5.1.2,6.5.2.2,Figure 6.2-1 & Figure 6.2-2 Re Util Reorganization.Fees Previously Submitted w/801226 Amend Request Project stage: Request ML20082F1661983-11-22022 November 1983 Requests Expeditious Issuance of Amend to License NPF-3,per 801223 Application & 810710 Supplemental Submittal Re Fire Barrier Penetrations,Tech Spec (Item 6) Project stage: Supplement ML20136J2191985-12-10010 December 1985 Discusses Plans Re Exemption Requests Provided in 840906 App R Compliance Assessment Rept & Application to Amend License NPF-3 Re Fire Protection Tech Specs.No Further Action on Exemption Request Required.Application Withdrawn Project stage: Request 1981-07-10
[Table View] |
Text
,
ae.
/
UNITED STATES NUCLEAR REGULATORY COMMISSION 2'
a r.
j wAsumeTom, n. c. acess September 23, 1980 Docket No. 50-346 i
1 Mr. Richard P. Crouse Vice President - Nuclear Toledo Edison Company 4
Edison Plaza 300 Madison Avenue Toledo, Ohio 43652
Dear Mr. Crouse:
As of the end of your current refueling outage at Davis-Besse, Unit No.1, all fire protection modifications should be completed in accordance with our Fire Protection Safety Evaluation Report dated July 26, 1979. Therefore, it is appropriate that your Technical Specifications be revised as necessary to reflect the modifications. For your information, the enclosure contains l
a set of our current fire protection Standard Technical Specifications.
It is requested that you revise your fire protection Technical Specifications using the enclosure as a guide and propose an amendment to your license within 60 days of receipt of this letter.
Sincerely, 1
pf. / * {. l(' &
obe W. Reid, Chief Operating Reactors Branch #4 Division of Licensing
Enclosure:
Current Fire Protection Standard Technical Specifications cc w/ enclosure:
See next page 8 02coso ; 79
n Toledo Edison Company cc w/ enclosure (s):
~
Mr. Donald H. Hauser Esq.
'U.S. Nuclear Regulatory Consission The Cleveland Electric Resident Inspector's Office Illuminating Company 5503 N. State Route 2 P. O. Box 5000 Oak harbor Chio 43449 Cleveland, Ohio 44101 Director, Technical Assessment Gerald Charnoff, Esq.
Division Shaw, Pittman, Potts Office of Radiation Programs and Trowbridge (AW-459) 1800 M Street, N.W.
U. S. Environmental Protection Agency i
Washington, D. C.
20036 Crystal Mall #2 Arlington, Virginia 20460 Leslie Henery, Esq.
Fuller, Seney, Henry and Hodge U. S. Environmental Protection Agency
~
300 Madison Avenue Federal Activities Branch Toledo, Ci:fo 43604 Region V Office ATTN: EIS COORDINATOR Mr. Robert B. Borsum 230 South Dearborn Street Babcock & Wilcox Chicago, Illinois 60604 Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Ida Rupp Public Library Ohio Department of Health 310 Madison Street ATTN: Director of Health Port Clinton, Ohio 43452 450 East Town Street Columbus, Ohio 43216 President, Board of County Commissioners of Ottawa County Port Clinton, Ohio 43452 Attorney General Department of Attorney General 30 East Broad Street Columbus, Ohio 43215 Harold Kahn, Staff Scientist Power Siting Comission 361 East Broad Street Columbus, Ohio 43216 Mr. Rick Jagger Industrial Commission State of Ohio 2323 West 5th Avenue Columbus, Ohio 43216 Mr. Ted Myers i
Licensing Engineer i
Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, Ohio 43652
..