MONTHYEARML19318A4791980-06-0505 June 1980 Forwards Response to IE Bulletin 80-12, Decay Heat Removal Sys Operability. Review Described in Encl 1 Revealed Error. Decay Heat Pump Suction Was Not Isolated by Containment Isolation Actuation as Stated in Page 2 Project stage: Other ML20126D8351980-06-11011 June 1980 Ltr to All Operating PWRs Requesting Amend to Tech Specs Re Decay Heat Removal Capability.Amend Is Necessary to Provide Permanent long-term Assurance That Redundancy Will Be Maintained Project stage: Other ML19318C4301980-06-26026 June 1980 Forwards Addl Info Re Shift Manning,Licensing,Testing of Power Operated Relief Valve Isolation Sys,Automatic Trip of Reactor Coolant Pumps & Small Break LOCA Methods,In Response to NRC Project stage: Other ML19330B7881980-07-25025 July 1980 Notice of Issuance & Availability of Amend 28 to License NPF-3 Project stage: Other ML19330B7851980-07-25025 July 1980 Amend 28 to License NPF-3,revising Tech Spec Setpoint for Automatic Closure of Decay Heat Removal Sys Isolation Valves & Implementing Pressurizer Heat Interlock Project stage: Other ML19337B6211980-09-23023 September 1980 Notifies That Fire Protection Mods Should Be Completed at End of Current Refueling Outage.Requests Revision of Fire Protection Tech Specs within 60 Days.Fire Protection STS Encl Project stage: Other ML20151B3601980-12-26026 December 1980 Application for Amend of License NPF-3 Changing Tech Specs Re Fire Detection Sys,Decay Heat Removal Capabilities,Low Temp RCS Overpressure Event,Axial Power Shaping Rod Insertion Limits & Util Reorganization Project stage: Request ML20009C8881981-07-10010 July 1981 Marked-up Revised Tech Specs 3.4.2,4.4.2,3.4.3,4.4.3, 3.8.1.2,4.8.1.2,4.8.1.1.2,4.8.1.1.2.C.2,3.1.3.6,3/4.2,3.2.1, 4.2.1,3.2.5,6.5.2.2,6.5.2.3,6.5.2.4,6.5.2.5,6.5.2.6, 3/4.7.10,3.7.10,4.7.10,Pages 3/4.7-5,B 3/4.4-19 & 3.8.1.2 Project stage: Other ML20009C8841981-07-10010 July 1981 Forwards Application for Amend of License NPF-3,requesting Revisions to Tech Specs Project stage: Request ML20009C8871981-07-10010 July 1981 Application for Amend of License NPF-3,revising Tech Specs for Auxiliary Feedwater Pump Turbine Speed Switches,Setpoint Index for Pressurizer Electromatic Relief & Code Safety Valves,Emergency Diesel Generator & Administrative Errors Project stage: Request ML20028G3531983-02-0101 February 1983 Forwards Model Tech Specs for Proposed Amend to App a Tech Specs Re DHR Capability Redundancy.Mod Requested to Assure Redundancy in Mode 3.Response Requested within 45 Days. W/O Encl Project stage: Other ML20069E4511983-03-17017 March 1983 Forwards Explanation on How DHR Redundancy Assured in Mode 3 Operation,In Response to NRC .Tech Specs Will Be Revised to Include Applicable Limits by 830513 Project stage: Other ML20023D5501983-05-13013 May 1983 Advises That Due to Difficulties W/Rev,License Amend Request Re DHR Capability Redundancy Will Be Submitted by 830615 Project stage: Other ML20024C2131983-07-0808 July 1983 Proposed Changes to Tech Specs 6.5.1.2,6.5.2.2,Figure 6.2-1 & Figure 6.2-2 Re Util Reorganization Project stage: Request ML20024C2111983-07-0808 July 1983 Application for Amend to License NPF-3,changing Tech Specs 6.5.1.2,6.5.2.2,Figure 6.2-1 & Figure 6.2-2 Re Util Reorganization Project stage: Request ML20024C2081983-07-0808 July 1983 Forwards Application for Amend to License NPF-3,changing Tech Specs 6.5.1.2,6.5.2.2,Figure 6.2-1 & Figure 6.2-2 Re Util Reorganization.Fees Previously Submitted w/801226 Amend Request Project stage: Request ML20082F1661983-11-22022 November 1983 Requests Expeditious Issuance of Amend to License NPF-3,per 801223 Application & 810710 Supplemental Submittal Re Fire Barrier Penetrations,Tech Spec (Item 6) Project stage: Supplement ML20136J2191985-12-10010 December 1985 Discusses Plans Re Exemption Requests Provided in 840906 App R Compliance Assessment Rept & Application to Amend License NPF-3 Re Fire Protection Tech Specs.No Further Action on Exemption Request Required.Application Withdrawn Project stage: Request 1981-07-10
[Table View] |
Text
_
i TOLEDO Docket No. 50-346 License No. NPF-3 b$Ncm e+a.c
"'8'258-5 8' Serial No. 1006 November 22, 1983 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
This letter is to request issuance of a license amenduent contained in our July 10, 1981 (Serial No. 731) submittal. Item 6 of that request concerns Fire Barrier Fenetrations as the Technical Specifications relate to the Davis-Besse Nuclear Power Station Unit No. 1 (DB-1).
Toledo Edison was requested by Mr. R. W. Reid on September 23, 1980 (Log No. 609) to revise its Technical Specifications for Fire Protection to conform with the Standard Technical Specification. On December 23, 1980 (Serial No. 669), Toledo Edison submitted an amendment request for Fire Protection in accordance with Mr. Reid's letter. Additionally, on July 10,1981 (Serial No. 731) we submitted a supplement to our December 26, 1980 amendment request containing Limiting Conditions for Operation for Fire Barrier Penetrations.
During the week of July 25-29, 1983 an Audit of Fire Protection (10 CFR 50 Appendix R) was conducted at DB-1.
As a result of this audit, several areas of concern has been identified which require establishment of continuous fire watches. Currently 30 persons per day are required to maintain the continuous fire watch at a cost of greater than $50,000 per month. This requires considerably more manpower and resource allocation than would be necessary to maintain a reving fire watch which would verify the operability of the fire detection system on a regular basis.
The current specification addressing Fire Barriers requires establishment of a continuous fire watch when any barrier is declared non-functional.
Other courses of action exist that can be taken to mitigate the consequences of a fire and that will require less expenditure of manpower costs. The requirement to establish a roving fire watch and verify the operability of fire detection system or establish a continuous fire watch assures that a fire in the affected area is detected early j
enough to initiate protection actions.
hy THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 F311280452 831122 PDR ADOCK 05000346 P
PDR
l Dock 2t N3. 50-346 s-Licr.n32 Ns. NPF-3 Serial'No. 1006 November 22, 1983
~Page 2
. Toledo Edison believes that the. resources that are necessary to provide compensatory actions under the proposed amendment request, provide an adequate margin of safety to ensure the public health and safety.
Therefore, we request that our July 10, 1981 (Serial No. 731) amendment request item 6, Fire Barrier Penetration,-be issued expeditiously.
Very truly yours, RPC: GAB:lah cc: DB-1 NRC Resident Inspector State of Ohio
)