ML19337A922
| ML19337A922 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 08/25/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19337A921 | List: |
| References | |
| NUDOCS 8010010016 | |
| Download: ML19337A922 (2) | |
See also: IR 05000369/1980022
Text
{{#Wiki_filter:- . g( o,, UNITED STATES g ) ,,, g NUCLEAR REGUL.~4 TORY COMMISSION , t ,e REGION ll [[ Q 101 MARIETTA ST.. N.W.. SUITE 310o ATLANTA, GEORGIA 3o3o3 In Reply Refer To: RII:TJD 50-369/80-22 Duke Power Company ATTN: W. O. Parker, Jr. Vice President, Steam Production P. O. Box 2178 Charlotte, NC 28242 Gentlemen: This refers to the inspection conducted by T. J. Donat of this office on July 21 through 25, 1980 of activities authorized by NRC Construction Permit No. CPPR-83 for the McGuire Nuclear Stom Plant facility, and to the discussion of our find- ings held with W. M. Sample at the conclusion of the inspection. Areas examined during the inspection and our findirigs are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors. Within the scope of this inspection, no items of noncompliance were disclosed. In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Titic 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the rerart will be placed in the Public Document Room. Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, . R. C. Lewis, Acting Chief Reactor Operations and Nuclear Support Branch Enclosure: See Page 2 80100300lb . -
. . , ,. ' AUG 2 51980 Duke Power Company 2- , Enclosure: Inspection Report No. 50-369/80-22 cc w/ enc 1: M. D. McIntosh, Plant Manager J. C. Rogers, Project Manager . }}