Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION January 14, 2020 Ms. Camille Zozula, Manager Infrastructure & Facilities Licensing Westinghouse Electric Company 1000 Westinghouse Drive, Building 1, Suite 165 Cranberry Township, PA 16066

SUBJECT:

FINAL SAFETY EVALUATION FOR WESTINGHOUSE ELECTRIC COMPANY TOPICAL REPORT WCAP-18240-P/WCAP-18240-NP, REVISION 0, WESTINGHOUSE THERMAL DESIGN PROCEDURE (WTDP)

(EPID: L-2018-TOP-0033)

Dear Ms. Zozula:

By letter dated August 27, 2018 (Agencywide Documents Access Management System Accession No. ML18242A238), Westinghouse Electric Company (Westinghouse) submitted to the U.S. Nuclear Regulatory Commission (NRC) a request for review and approval of Topical Report (TR) WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (WTDP). By letter dated May 14, 2019 (ADAMS Accession No. ML19108A135), the NRC issued its request for additional information (RAI) questions for the review of WCAP-18240-P/WCAP-18240-NP, Revision 0.

The enclosed final SE addresses the applicability of WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (WTDP).

The NRC staff has found that WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (WTDP), is acceptable for referencing in licensing applications to the extent specified and under the limitations delineated in the TR and the enclosed SE.

Our acceptance applies only to material provided in the subject TRs. In accordance with the guidance provided on the NRC website, we request that Westinghouse publish accepted proprietary and non-proprietary versions of these TRs within three months of receipt of this letter.

The accepted versions shall incorporate this letter and the enclosed final SE after the title page.

Also, they must contain historical review information, including NRC RAI questions and your responses. The accepted versions shall include an "-A" (designating accepted) following the TRs identification symbol.

As an alternative to including the RAI questions and RAI responses behind the title page, if changes to the TRs were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAI questions:

1. The RAI questions and RAI responses can be included as an Appendix to the accepted version.

NOTICE: Enclosure 2 transmitted herewith contains SUNSI. When separated from Enclosure 2 this transmittal document is decontrolled.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION

OFFICIAL USE ONLY - PROPRIETARY INFORMATION C. Zozula 2. The RAI questions and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TRs.

The table should reference the specific RAI questions and RAI responses which resulted in any changes, as shown in the accepted version of the TRs.

If future changes to the NRCs regulatory requirements affect the acceptability of this TR, Westinghouse will be expected to revise the TR appropriately or justify its continued applicability for subsequent referencing. Licensees referencing this TR would be expected to justify its continued applicability or evaluate their plant using the revised TR.

Sincerely,

/RA/

Dennis C. Morey, Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 99902038

Enclosures:

As stated OFFICIAL USE ONLY - PROPRIETARY INFORMATION

ML19337A184 (Pkg.)

ML19337A509 (Letter)

ML19337A544 (Non-Prop SE Enclosure 1)

ML19337A617 (Non-Prop Comment Resolution Attachment)

ML19337A594 (Prop SE Enclosure 2)

  • via e-mail NRR-106 OFFICE NRR/DORL/LLPB NRR/DORL/LLPB/LA* NRR/DSS/SFNB* NRR/DORL/LLPB/BC NAME ELenning DHarrison RLukes DMorey DATE 12/03/19 1/06/20 1/06/20 1/14/20