ML19337A160
| ML19337A160 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/13/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 8009090105 | |
| Download: ML19337A160 (1) | |
Text
.
UNITED STATES -
aesg'o NUCLEAR REGULATORY COMMISSION
+
,g g
REolONl t
j.
s31 PARK AVENUE KING OF PRUSSIA. PENNSYt.VANI A 19406 May 13,,1980 Docket'Nos. 50-277 50-278 Philadelphia Electric Company ATTN:
Mr.
S.-L. Daltroff Vice President Electric Production
-2301 Market Street 4
Philadelphia, Pennsylvania 19101 Gentlemen:
The enclosed IE Bulletin No. 80-07, Supplement No. 1, "BWR Jet Pump Assembly Failure," is forwarded to you for action.
A written response is required.
This Supplement specifies the NRC offices that should receive written reports submitted in response to this Bulletin.
If you desire additional information regarding this matter, please contact this office.
Sincerely, m
FK mk Boyce H. Grier Director
Enclosures:
1.
IE Bulletin No. 80-07, Supplement No. 1 2.
List of Recently Issued IE Bulletins CONTACT:..D. L. Caphton (215-337-5254) cc w/er.cls:
W. T. Ullrich, Station Superintendent Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire Raymond L. Hovis, Esquire 4
Michael J. Scibinico, II, Assistant Attorney General l
l-8009 gg 0
. k
+
ENCLOSURE 1 h
SSINS No.:
6820 Accession No.:
UNITED STATES 8005050055 NUCLEAR REGULATORY COMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Bulletin No. 80-07 Supplement No. 1 Date:
May 13, 1980 Page 1 of 1 BWR JET PUMP ASSEMBLY FAILURE C.
Reporting Requirements The information in Items A.3, and 8.1, is requested under the provisions of 10 CFR 50.54(f).
Accordingly, you are requested to provide within the time periods specified in these items, written statements of this informa-tion, signed under oath or affirmation.
These reports should be submitted to the Director of the appropriate NRC Regional Office:and a copy should be forwarded to the_NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C.
20555.
Approved by GAO,.8180225 (R0072); clearance expires 7-31-80.
Approval was given under a blanket clearance specifically for identified generic problems.
t I 3 I
ENCLOSURE 2 IE Bulletin No. 80-07 Supplement No. 1 Date: May 13, 1980 Page 1 of 1
-RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.
80-06 Engineered Safety
-3/13/80 All Power Reactor Feature (ESF) Reset Facilities with an Controls Operating License (OL) (For Action)
All Power Reactor Facilities with a Construction Permit (CP) (For Information)-
79-03A Longitudinal Weld 4/4/80 All Power Reactor-Defects in ASME Facilities with an SA-312, Type 304 OL or CP Stainless Steel Pipe 80-07 BWR' Jet Pump Assembly 4/4/80 BWR 3 & 4's with OL Failure (For Action)
BWR's with CP (For Information) 80-08 Examination of Con-4/7/80 All Power Reactor tainment Liner Facilities with Penetration Welds an OL or CP 80-09 Hydromotor Actuator 4/17/80 All Power Reactor Deficiencies Facilities with an OL or CP 80-10 Contamination of 5/6/80 All Power Reac-Nonradioactive tors with OL System and Resulting (for action)
Potential for Unmoni-with CP (for tored, Uncontrolled information)
Release to Environment 80-11 Masonry Wall Design 5/8/80 All Power Reactor Facilities with an OL, Except Salem 2 80-12 Decay Heat Removal 5/9/80 All PWRs with an OL System Opcrability 80-13 Cracking in Core Spray 5/12/80 All BWRs with an Spargers OL
. _. _, _ _ _