Forwards IE Bulletin 80-07,Suppl 1, BWR Jet Pump Assembly Failure. Response Required
ML19337A159
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/13/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 8009090101
Download: ML19337A159 (1)


Text

'

+p' us ~

' UNITED STATES -

NUCLEAR REGULATORY COMMISSION f

g REGloN I O

f

$35 PARK AVENUE 96 KING OF PRUS$lA.PENNSYt.VANIA 19404

-May 13, 1980 Decket No. 50-271

' Vermont Yankee Nuclear Power Corporation ATTN: Mr. Robert L. Smith Licensing Engineer 25 Research Drive Westborough, Massachusetts 01581 l

l Gentlemen:

The enclosed IE Bulletin No. 80-07, Supplement No. 1, "BWR Jet Pump Assembly Failure," is forwarded to you for action.

A written response is required.

j This Supplement specifies the NRC offices that should receive written reports submitted in response to this Bulletin.

If you desire additional information regarding this matter, please contact this office.

Sincerely, m

~

b Af! Art,_

Boyce H. Grier

~~~~ Director

Enclosures:

1.

IE Bulletin No. 80-07, Supplement No. 1 l

2.

List of Recently Issued IE Bulletins CONTACT:

D. L. Caphton

.(215-337-5254) cc w/encls:

Mr. Warren P. Murphy, Plant Superintendent Ms. J. Abbey, Technical Secretary Mr. J. E. Griffin, President Mr. L. H. Heider, Vice President I

l 1

0009 gg) 0

c.

ENCLOSURE 1 SSINS No.:

6820 Accession No.:j

>d >

UNITED STATES 8005050055 g>I -

NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 80-07 Supplement No. 1 Date:

May 13, 1980 Page 1-of 1 BWR JET PUMP ASSEMBLY FAILURE C.

Reporting Requirements The information in Items A.3, and B.1, is requested under the provisions of 10 CFR 50.54(f).

Accordingly, you are requested to provide within the time periods specified in these items, written statements of this informa-tion, signed under oath or affirmation.

These reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C.

20555.

Approved by GAO, B180225 (R0072); clearance expires 7-31-80.

Approval was given under a blanket clearance specifically for identified generic problems.

m,,

ENCLOSURE 2 IE Bulletin No. 80-07 Supplement No. 1 Date: May 13, 1980 Page 1 of 1 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

80-06 Engineered Safety 3/13/80 All Power Reactor Faature (ESF) Reset Facilities with an Controls Operating License (OL) (For Action)

All Power Reactor Facilities with a Construction Permit (CP) (For Information)79-03A Longitudinal Weld 4/4/80 All Power Reactor Defects in ASME Facilities with an SA-312, Type 304 OL or CP Stainless Steel Pipe 80-07 BWR Jet Pump Assembly 4/4/80 BWR 3 & 4's with OL Failure-(For Action)

BWR's with CP (For Information) 80-08 Examination of Con-4/7/80 All Power Reactor tainment Liner Facilities with Penetration Welds an OL or CP 80-09 Hydromotor Actuator 4/17/80 All Power Reactnr Deficiencies Facilities with an OL or CP 80-10 Contamination of 5/6/80 All Power Reac-Nonradioactive tors with OL System and Resulting (for action)

Potential for Unmoni-with CP (for tored, Uncontrolled information)

Release to Environment 80-11 Masonry Wall Design 5/8/80 All Power Reactor Facilities with an OL, Except Salem 2 80-12 Decay Heat Removal 5/9/80 All PWRs with an OL System Operability 80-13 Cracking in Core Spray 5/12/80 All BWRs with an Spargers OL