Forwards IE Bulletin 80-07,Suppl 1, BWR Jet Pump Assembly Failure. No Response Required
ML19337A158
Person / Time
Site: Hope Creek  PSEG icon.png
Issue date: 05/13/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Martin T
Public Service Enterprise Group
References
NUDOCS 8009090096
Download: ML19337A158 (1)


Text

--_.

[fC. :

pmatro UNITED STATES

  • 1

./

o NUCLEAR REGULATORY COMMISSION

[

Q REIlt N I

.O j

431 ' PAR K AVENUE e

KING OF PRUS$1A, PENNSYLVANIA 19404 g

May 13, 1980 D:cket Nos. 50-354 50-355 Public Service Electric and Gas Company ATTN.

Mr. T. J. Martin -

Vice President Engineering and Construction 80 Park Place Newark, New Jersey 07101 Gentlemen:

The enclosed IE Bulletin No. 80-07, Supplement No. 1, "BWR Jet Pump Assembly Failure," is forwarded to you for information.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, L

Boyce H. Grier

" Director

Enclosures:

1.

IE Bulletin No. 80-07, Supplement,No. 1 2.

List of Recently Issued IE Bulletins CONTACT:

D. L. Caphton (215-337-5254) cc w/encls:

E. N. Schwalje, Manager - Quality Assuc:Ince, Engineering and Construction Department l

)

8009090 %

ENCLOSURE 1 SSINS No.:

6820 Accession No.:/

fe UNITED STATES 8005050055 g>'"I NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 80-07 Supplement No. 1 Date:

May 13, 1980 Page 1 of 1 BWR JET PUMP ASSEMBLY FAILURE C.

Rer, rting Requirements The information in Items A.3, and B.1, is requested under the provisions of 10 CFR 50.54(f).

Accordingly, you are requested to provide within the time periods specified in these items, written statements of this informa-tion, signed under oath or affirmation.

These reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C.

20555.

Approved by GAO, B180225 (R0072); clearance expires 7-31-80.

Approval was given under a blanket clearance specifically for identified generic problems.

i

ENCLOSURE 2 IE Bulletin No. 80-07 Supplement No. 1 Date: May 13, 1980 Page 1 of 1 RECENTLY ISSUED IE 8ULLETINS Bulletin Subject Date Issued Issued To No.

80-06 Engineered Safety 3/13/80 All Power Reactor Feature (ESF) Reset Facilities with an Controls Operating License (OL) (For Action)

All Power Reactor Facilities with a Construction Permit 1

(CP) (For Information)!79-03A Longitudinal Weld 4/4/80 All Power Reactor Defects'in ASME Facilities with an SA-312, Type 304 OL or CP Stainless Steel Pipe 80-07 BWR Jet Pump Assembly 4/4/80 BWR 3 & 4's with OL Failure (For Action)

BWR's with CP (For Information) 80-08 Examination of Con-4/7/80 All Power Reactor tainment Liner Facilities with Penetration Welds an OL or CP 80-09 Hydromotor Actuator 4/17/80 All Power Reactor Deficiencias Facilities with an OL or CP 80-10 Contamination of 5/6/80 All Power Reac-Nonradioactive tors with OL System and Resulting (for action)

Potential for Unmoni-with CP (for tored, Uncontrolled information)

Release to Environment 80-11 Masonry Wall Design 5/8/80 All Power Reactor Facilities with an OL, Except Salem 2 80-12 Decay Heat Removal 5/9/80 All PWRs with an OL System Operability 80-13

_ Cracking in Core Spray 5/12/80 All NWRs with an l

Spargers OL l

I

__ ~,-._.