05000263/LER-1999-007, :on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With1999-07-0909 July 1999
- on 990610,HPCI Test Return Valve Was Unable to Close Against Max Expected Differential Pressure.Caused by Failure to Accurately Predict Valve Performance.Procedure Revised.With
05000263/LER-1999-006-01, :on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With1999-07-0202 July 1999
- on 990602,during Quarterly Surveillance Hcpi Was Declared Inoperable.Caused by Drain Pot Alarm.Revised HPCI Surveillance Test Procedure.With
05000263/LER-1999-005, :on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With1999-06-0707 June 1999
- on 990508,personnel Inserted Manual Scram When Pressure Transient Closed Air Ejector Suction Isolation Valves & Tripped off-gas Sys.Caused by Recombiner Catalyst Migration.Catalyst Was Removed.With
05000263/LER-1999-004-01, :on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With1999-05-24024 May 1999
- on 990422,low Reactor Water Level Scram,Group 2 & 3 Isolations & Subsequent HPCI Became Inoperable.Caused by Feedwater Controller Power Supply Failure.Three Power Supplies Replaced & Connections Cleaned.With
05000263/LER-1999-003-01, :on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With1999-05-12012 May 1999
- on 990412,HPCI & Division 1 ECCS Equipment Were Declared Inoperable Due to Svc Water Pump Failure.Pump Shaft Was Mechanically Freed,Check Valve Was Repaired & Pump Was Successfully Tested.With
05000263/LER-1999-002-01, :on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With1999-05-11011 May 1999
- on 990329,event Sequence That Results in Available ECCS Being Reduced to Less than That Assumed in Current Safety Analysis.Caused by Failure of Edg.Plant Operating Procedures Revised.With
05000263/LER-1999-001-02, :on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With1999-03-17017 March 1999
- on 990215,HPCI High Steam Flow Isolation During Quarterly Surveillance Test Was Noted.Caused by Inadequate Surveillance Procedure.Revised Surveillance Procedure.With
05000263/LER-1998-005-01, :on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve1998-10-21021 October 1998
- on 980921,HPCI Was Removed from Service to Repair Steam Leak in Drain Trap by Pass.Caused by Localized Erosion of Valve Body.Valve Was Declared Inoperable & Was Replaced with Manual Valve
05000263/LER-1998-004-02, :on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked1998-10-0909 October 1998
- on 980909,manual Scram Was Inserted Following Pressure Transient Closed Air Ejector Suction Isolation Valves & Trips Offgas Recombiners,Occurred.Caused by Seat Leakage.Leaking Valve Seat Was Reworked
05000263/LER-1998-003-01, :on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced1998-05-14014 May 1998
- on 980417,transgranular Stress Corrosion Cracking Was Identified in Control Rod Drive Lines.Caused by chloride-induced Transgranular stress-corrosion Cracking. Affected Sections of Two Lines Replaced
05000263/LER-1998-002-02, :on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed1998-05-14014 May 1998
- on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed
05000263/LER-1998-001-02, :on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment1998-04-22022 April 1998
- on 980323,discovered Containment Isolation Valve Leakage Exceeded TS Limit.Caused by Foreign Matl Found on Valve Seat.Repaired Subject Valves & Developed Process to Ensure Cleanliness of Testing Equipment
05000263/LER-1997-014-01, :on 971219,determined That Division II ADS Inhibit Switch Was Not Tested as Required by Ts.Caused by Cognitive Error by Revision Preparer & Reviewer of Surveillance Test.Temporary Change in Surveillance Test1998-01-12012 January 1998
- on 971219,determined That Division II ADS Inhibit Switch Was Not Tested as Required by Ts.Caused by Cognitive Error by Revision Preparer & Reviewer of Surveillance Test.Temporary Change in Surveillance Test
05000263/LER-1997-013-01, :on 971125,manual Scram Was Inserted Due to Loss of Condenser Vacuum.Caused by Electrical Fault Tripping.Temporary Cables Were Installed Primarily Above Ground1997-12-22022 December 1997
- on 971125,manual Scram Was Inserted Due to Loss of Condenser Vacuum.Caused by Electrical Fault Tripping.Temporary Cables Were Installed Primarily Above Ground
05000263/LER-1997-011, :on 970908,failure to Transfer HPCI & RCIC Suctions to Suppression Pool After Making Condensate Storage Tank Level Instrument Inoperable Occurred.Caused by Cognitive Personnel Errors.Procedures Reviewed1997-10-16016 October 1997
- on 970908,failure to Transfer HPCI & RCIC Suctions to Suppression Pool After Making Condensate Storage Tank Level Instrument Inoperable Occurred.Caused by Cognitive Personnel Errors.Procedures Reviewed
05000263/LER-1997-010-01, :on 970916,failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10 Year Interval Occurred.Caused by Original Plant Drawings Incomplete.Controlled Drawings Will Be Revised1997-10-16016 October 1997
- on 970916,failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10 Year Interval Occurred.Caused by Original Plant Drawings Incomplete.Controlled Drawings Will Be Revised
05000263/LER-1997-009-01, :on 970701,partial Primary Containment Isolation Occurred.Caused by Voltage Transient During Severe Weather.Restored Sys to Conditions That Existed Prior to Event & Repaired Damaged 345 Kv Line1997-07-23023 July 1997
- on 970701,partial Primary Containment Isolation Occurred.Caused by Voltage Transient During Severe Weather.Restored Sys to Conditions That Existed Prior to Event & Repaired Damaged 345 Kv Line
05000263/LER-1997-008, :on 970418,inappropriate Use of 25% Tolerance for Periodic Actions in Section 3 of TS Was Noted.Caused by Error of Personnel Preparing & Revising TS Interpretation. TS Interpretation Deleted on 9704041997-05-19019 May 1997
- on 970418,inappropriate Use of 25% Tolerance for Periodic Actions in Section 3 of TS Was Noted.Caused by Error of Personnel Preparing & Revising TS Interpretation. TS Interpretation Deleted on 970404
05000263/LER-1997-007, :on 970415,discovered Net Positive Suction Head Available for Core Spray Pumps Less than Required.Caused by Identification of Increased ECCS Strainer Head Loss.Plant Brought to Cold Shutdown1997-05-15015 May 1997
- on 970415,discovered Net Positive Suction Head Available for Core Spray Pumps Less than Required.Caused by Identification of Increased ECCS Strainer Head Loss.Plant Brought to Cold Shutdown
05000263/LER-1997-006, :on 970408,emergency DG Started While Electrical Maintenance Personnel Were Performing Monthly Degraded Safeguards Bus Voltage Surveillance.Caused by Personnel Error.Lessons Learned Meeting,Held1997-05-0808 May 1997
- on 970408,emergency DG Started While Electrical Maintenance Personnel Were Performing Monthly Degraded Safeguards Bus Voltage Surveillance.Caused by Personnel Error.Lessons Learned Meeting,Held
05000263/LER-1997-003, :on 970128,piping Between Double Containment Isolation Valves Could Be Stressed Greater than Code Allowables During Certain Accident Conditions.Caused by Design Deficiency1997-02-25025 February 1997
- on 970128,piping Between Double Containment Isolation Valves Could Be Stressed Greater than Code Allowables During Certain Accident Conditions.Caused by Design Deficiency
05000263/LER-1997-002, :on 970116,no Licensed Senior Operator Was in Control Room/Shift Supervisors Ofc.Caused Because Shift Manager Failed to Follow Plant Procedure.Electronic Message Was Sent to All Shift Managers1997-02-13013 February 1997
- on 970116,no Licensed Senior Operator Was in Control Room/Shift Supervisors Ofc.Caused Because Shift Manager Failed to Follow Plant Procedure.Electronic Message Was Sent to All Shift Managers
05000263/LER-1996-014-01, :on 961216,unqualified Electrical Splice Found in Train B Standby Gas Treatment Sys.Cause Appears to Be Associated with Original Plant Construction.Unqualified Splice Was Removed1997-01-15015 January 1997
- on 961216,unqualified Electrical Splice Found in Train B Standby Gas Treatment Sys.Cause Appears to Be Associated with Original Plant Construction.Unqualified Splice Was Removed
05000263/LER-1996-013-01, :on 961212,surveillance Procedure for CR Emergency Filtration Sys Found Not to Comply W/Ts Surveillance Requirement.Caused by Original Surveillance Failed to Require Testing of Adjacent Areas.Cr Reviewed1997-01-13013 January 1997
- on 961212,surveillance Procedure for CR Emergency Filtration Sys Found Not to Comply W/Ts Surveillance Requirement.Caused by Original Surveillance Failed to Require Testing of Adjacent Areas.Cr Reviewed
05000263/LER-1996-011-01, :on 961112,jumper Placement Error Occurred During Surveillance Procedure,Causing Dual Recirculation Pump Trip Requiring Manual Scram.Caused by Inadequate Labeling.Surveillance Procedure Revised1996-12-12012 December 1996
- on 961112,jumper Placement Error Occurred During Surveillance Procedure,Causing Dual Recirculation Pump Trip Requiring Manual Scram.Caused by Inadequate Labeling.Surveillance Procedure Revised
05000263/LER-1996-010-01, :on 961016,panel Fire Barriers Were Not in Correct Position.Cause Unknown.Barrier Restored to Proper Position & Other Barriers in C04 & C08 in CR Checked.W/1996-11-13013 November 1996
- on 961016,panel Fire Barriers Were Not in Correct Position.Cause Unknown.Barrier Restored to Proper Position & Other Barriers in C04 & C08 in CR Checked.W/
05000263/LER-1996-009-01, :on 960924,failure to Perform Required Actions within One Hour Following Discovery of Water in Fire Hydrant Barrel Noted.Water Was Pumped Out & Drain Port Was Repaired Under Work Orders 9602567 & 96026271996-10-11011 October 1996
- on 960924,failure to Perform Required Actions within One Hour Following Discovery of Water in Fire Hydrant Barrel Noted.Water Was Pumped Out & Drain Port Was Repaired Under Work Orders 9602567 & 9602627
05000263/LER-1996-008, :on 960816,reactor Water Clean Line Break Reanalysis Noted Due to Error Discovered During Reevaluation.Rwcu Sys Was Taken OOS & Isolated as Conservative Action for Short Period of Time1996-09-16016 September 1996
- on 960816,reactor Water Clean Line Break Reanalysis Noted Due to Error Discovered During Reevaluation.Rwcu Sys Was Taken OOS & Isolated as Conservative Action for Short Period of Time
05000263/LER-1996-007-01, :on 960615,reactor Scram Resulted from Electrical Short in Generator Condition Monitor.Corrected Wiring Error1996-07-12012 July 1996
- on 960615,reactor Scram Resulted from Electrical Short in Generator Condition Monitor.Corrected Wiring Error
05000263/LER-1996-006-01, :on 960609,reactor Scram Occurred.Caused by Loss of Stator Water Cooling Flow.Rebuilt Pumps,Replaced Oilers W/Different Type of Device & Installed Grounding Strap/Brush on Both Stator Water Cooling Pumps1996-07-0909 July 1996
- on 960609,reactor Scram Occurred.Caused by Loss of Stator Water Cooling Flow.Rebuilt Pumps,Replaced Oilers W/Different Type of Device & Installed Grounding Strap/Brush on Both Stator Water Cooling Pumps
05000263/LER-1996-005-01, :on 960530,unplanned Partial Containment Isolation Occurred.Caused by False High Radiation Signal. Reset Containment Isolation & Repaired Reactor Bldg Exhaust Plenum Radiation Monitor1996-06-27027 June 1996
- on 960530,unplanned Partial Containment Isolation Occurred.Caused by False High Radiation Signal. Reset Containment Isolation & Repaired Reactor Bldg Exhaust Plenum Radiation Monitor
05000263/LER-1996-004-01, :on 960414,inboard Main Steam Isolation Valve Leakage Greater than Allowed by Tech Specs.Caused by Tipping of Poppet.Valve Poppets & Stems Replaced W/New Design to Reduce Poppet Tipping1996-05-14014 May 1996
- on 960414,inboard Main Steam Isolation Valve Leakage Greater than Allowed by Tech Specs.Caused by Tipping of Poppet.Valve Poppets & Stems Replaced W/New Design to Reduce Poppet Tipping
05000263/LER-1996-003-01, :on 960404,personnel Identified Error in Current Licensing Basis Analysis.Caused by Improper Analyzed Ambient Temps in Vicinity.Mods Will Be Installed During Current Outage1996-05-0808 May 1996
- on 960404,personnel Identified Error in Current Licensing Basis Analysis.Caused by Improper Analyzed Ambient Temps in Vicinity.Mods Will Be Installed During Current Outage
05000263/LER-1996-002-01, On:960308,found Wire in 12 EDG Voltage Regulator Not Properly Secured Due to Missing Fastener. Cause for Missing Fastener Not Known.Wire Lug Secured & Both EDGs Tested1996-04-0404 April 1996
On:960308,found Wire in 12 EDG Voltage Regulator Not Properly Secured Due to Missing Fastener. Cause for Missing Fastener Not Known.Wire Lug Secured & Both EDGs Tested
05000263/LER-1995-007-01, :on 951012,valve RHR 74-2 Found Closed & Unlocked.Caused by Personnel Errors.Event Discussed W/Shift Personnel & Formal Training Will Be Provided to Personnel Involved in Valve line-ups1995-11-13013 November 1995
- on 951012,valve RHR 74-2 Found Closed & Unlocked.Caused by Personnel Errors.Event Discussed W/Shift Personnel & Formal Training Will Be Provided to Personnel Involved in Valve line-ups
05000263/LER-1995-006-01, :on 950610,drain Valve Not Fully re-closed During Surveillance of SJAE OG RM Chamber Rendering Both SJAE RMs Inoperable.Caused by Personnel/Cognitive Error. Training Provided & Procedure Changed1995-07-0707 July 1995
- on 950610,drain Valve Not Fully re-closed During Surveillance of SJAE OG RM Chamber Rendering Both SJAE RMs Inoperable.Caused by Personnel/Cognitive Error. Training Provided & Procedure Changed
05000263/LER-1995-005-01, :on 950518,two Main RB Supply Fans Tripped. Caused by Electrical Disturbance on 345 Kv Power Lines Connected to Plant Substation.Ventilation Configuration Changed1995-06-15015 June 1995
- on 950518,two Main RB Supply Fans Tripped. Caused by Electrical Disturbance on 345 Kv Power Lines Connected to Plant Substation.Ventilation Configuration Changed
05000263/LER-1995-004-01, :on 950518,an Electrical Assembly tripped,de- Energizing B RPS Bus.Caused by Aging of Electrolytic Capacitor.Capacitor Replaced1995-06-15015 June 1995
- on 950518,an Electrical Assembly tripped,de- Energizing B RPS Bus.Caused by Aging of Electrolytic Capacitor.Capacitor Replaced
05000263/LER-1995-003-01, :on 950328,pipe & Cable Tray Supports Found Anchored to Shoring Plates Rather than Embedded Plates. Caused by Error in Original Const.Supports Modified or Analyzed & Meet Code Requirements1995-04-27027 April 1995
- on 950328,pipe & Cable Tray Supports Found Anchored to Shoring Plates Rather than Embedded Plates. Caused by Error in Original Const.Supports Modified or Analyzed & Meet Code Requirements
05000263/LER-1995-002-01, :on 950118,identified That Div I Backup Scram Valve Operator & Div I Low Low Set Logic in Same Fused Circuit.Caused by Personnel Error,Not Classifying as safety- Related.Coil Dedicated to Safety Related1995-04-24024 April 1995
- on 950118,identified That Div I Backup Scram Valve Operator & Div I Low Low Set Logic in Same Fused Circuit.Caused by Personnel Error,Not Classifying as safety- Related.Coil Dedicated to Safety Related
05000263/LER-1995-001, :on 950206,missed Grab Sample on SW Radiation While Maint Was Being Performed on Sample Pump.Caused by No Administrative Aids to Ensure That Shift Took Required Samples.Took Sample Immediately1995-02-22022 February 1995
- on 950206,missed Grab Sample on SW Radiation While Maint Was Being Performed on Sample Pump.Caused by No Administrative Aids to Ensure That Shift Took Required Samples.Took Sample Immediately
05000263/LER-1994-017, :on 941023,HPCI Isolated on High Steam Flow During Test at Lower than Normal Pressure.Preventative Maint Procedure for HPCI Sys Revised1994-11-22022 November 1994
- on 941023,HPCI Isolated on High Steam Flow During Test at Lower than Normal Pressure.Preventative Maint Procedure for HPCI Sys Revised
05000263/LER-1994-018, :on 941026,automatic Transfer of HPCI Suction from Condensate Storage Tanks to Torus on High Torus Level During Surveillance Testing.Caused by Lack of Appropriate Procedure Action.Guideline Will Be Established1994-11-22022 November 1994
- on 941026,automatic Transfer of HPCI Suction from Condensate Storage Tanks to Torus on High Torus Level During Surveillance Testing.Caused by Lack of Appropriate Procedure Action.Guideline Will Be Established
05000263/LER-1994-016, :on 941017,partial Containment Isolation Occurred.Caused by Lack of Proper Procedural Prerequisite in Excess Flow Check Valve Test Procedure.Excess Flow Check Test Revised1994-11-15015 November 1994
- on 941017,partial Containment Isolation Occurred.Caused by Lack of Proper Procedural Prerequisite in Excess Flow Check Valve Test Procedure.Excess Flow Check Test Revised
05000263/LER-1994-014, :on 941013,missed Procedural Step While Switching Power Supply to Reactor Protection Sys to Alternate Source Causes Partial Ci.Ci Signal Reset & Isolation Sys Returned to Svc as Necessary1994-11-14014 November 1994
- on 941013,missed Procedural Step While Switching Power Supply to Reactor Protection Sys to Alternate Source Causes Partial Ci.Ci Signal Reset & Isolation Sys Returned to Svc as Necessary
05000263/LER-1994-013, :on 941013,spurious 480 Vac Breaker Trip de-energizes 120 Vac Instrument Bus Resulting in Partial Ci. Training Will Be Provided to Operations Personnel on Appropriate Actions1994-11-10010 November 1994
- on 941013,spurious 480 Vac Breaker Trip de-energizes 120 Vac Instrument Bus Resulting in Partial Ci. Training Will Be Provided to Operations Personnel on Appropriate Actions
05000263/LER-1994-015, :on 941015,failed Component in Uniterruptible Power Supply Inverter Causes Partial Containment.Caused by Failure of Static Switch Logic Card.Ci Signals Reset & Isolated Sys Returned to Svc as Necessary1994-11-0909 November 1994
- on 941015,failed Component in Uniterruptible Power Supply Inverter Causes Partial Containment.Caused by Failure of Static Switch Logic Card.Ci Signals Reset & Isolated Sys Returned to Svc as Necessary
05000263/LER-1994-012, :on 940930,fire Door 61 Did Not Have Required Door Latch Throw,Error Was Made During Original Plant Const. Latch on Fire Door 61 Was Replaced W/Latch w/3/4 Throw1994-10-31031 October 1994
- on 940930,fire Door 61 Did Not Have Required Door Latch Throw,Error Was Made During Original Plant Const. Latch on Fire Door 61 Was Replaced W/Latch w/3/4 Throw
05000263/LER-1994-008, :on 940727,structural Beam Connections on Cable Spreading Room Floor Found Different from Design Due to Workers Not Installing Clips in Accordance W/Specified Design.Room Door Unlatched Until Analyzed1994-10-31031 October 1994
- on 940727,structural Beam Connections on Cable Spreading Room Floor Found Different from Design Due to Workers Not Installing Clips in Accordance W/Specified Design.Room Door Unlatched Until Analyzed
05000263/LER-1994-011, :on 940929,discovered That Two SRV Inoperable at Time During Previous Cycle.Caused by Leaking Silver Plated Metal O-ring That Seals Bellows.Topworks Replaced for SRV D & H1994-10-31031 October 1994
- on 940929,discovered That Two SRV Inoperable at Time During Previous Cycle.Caused by Leaking Silver Plated Metal O-ring That Seals Bellows.Topworks Replaced for SRV D & H