Submittal of Prepared Testimony for First Hearing Session. No Attempts Made to Provide Complete Answers to ASLB 800908 Memorandum & Order Re Physical Separation of TMI Units. Certificate of Svc Encl.Related Correspondence
ML19332B230
Person / Time
Site: Oconee, Crystal River, Rancho Seco, Crane  Duke Energy icon.png
Issue date: 09/15/1980
From: Trowbridge G
METROPOLITAN EDISON CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
Shared Package
ML19332B231 List:
References
ISSUANCES-SP, NUDOCS 8009260313
Download: ML19332B230 (7)


Text

___

LIC 9/15/80 TE4 Coju g.,VNhtNCE 9

v I N

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION P

g

~

a 6-e BEFORE THE ATOMIC SAFETY AND LICENSING BOAEII"

..,, /

g q

S In the Matter of

)

M

)

METROPOLITAN EDISON COMPANY

)

Docket No. 50-289

)

(Restart)

(Three Mile Island Nuclear

)

Station, Unit No. 1)

)

LICENSEE'S PREPARED TESTIMONY FOR FIRST SESSION OF RESTART HEARING In accordance with the Board's Memorandum and Order dated September 8, 1980, Licensee files herewith testimony on all contentions attached to that Memorandum and Order and on the physical separation of the TMI units, together with related exhibits which Licensee proposes to offer at the hear-ing.

The testimony and exhibits are listed in the attached certificate of service.

Licensee has not attempted in this set of prepared testimony to provide ccmplete answers to all Board questions, including questions on UCS Contention Nos.

6, 8 and 12 which have been adopted by the Board.

Some effort has been made, however, to factor the Board's questions into the testimony on contentions where information requested by the Board was readily available.

Thus, for example, in connection with our

)

gooseo i

2

testimony on UCS Contention 8, we are providing as exhibits the fundamental documents involved in the small break LOCA analysis.

Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE I

, h,

,M,/

By y

George F. Trowbridgd Dated: September 15, 1980 r \\

LIC 9/15/80 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter

)

)

METROPOLITAN EDISON COMPANY

)

Docket No. 50-289

)

(Restart)

(Three Mile Island Nuclear

)

t Station, Unit No. 1)

)

CERTIFICATE OF SERVICE I hereby certify that the following documents were served upon the parties identified on the attached Service List by deposit in the United States mail, first class, postage prepaid, this 15th day of September, 1980:

1.

Licensee's Testimony of Robert W.

Keaten and Robert C. Jones in Response to UCS Contention Nos. 1 and 2 (Natural and Forced Circulation) ;

2.

Licensee's Testimony of Robert C. Jones, Jr.,

and T. Gary Broughton in Response to UCS Contention No. 8 and ECNP Contention No. 1(e)

(Additional LOCA Analysis) ;

3.

Exhibit:

Topical Report, BAW-10103A, Rev.

3, "ECCS Analysis of B&W's 177-FA Lowered Loop NSSS," July 1977; 4.

Exhibit:

Letter dated July 18, 1978 from J.H. Taylor, Babcock & Wilcox, to S.A. Varga, NRC, attaching additional ECCS small break analyses; 5.

Exhibit:

" Evaluation of Transient Behavior and Small Reactor Coolant System Breaks in the 177 Fuel Assembly Plant," Volume I, Section 6, "Small Break Analyses," May 7, 1979; b

. 6.

Exhibit:

"Small Break in the Pressurizer (PORV) with No Auxiliary Feedwater and Single Failure of the ECCS," Supplement 1 to the May 7, 1979 Small Break Analyses (May 12, 1979);

7.

Exhibit:

"Small Break in the Pressurizer (PORV) with No Auxiliary Feedwater and Single Failure of the ECCS with Realistic Decay Heat," Supple-ment 2 to the May 7, 1979 Small Break Analyses (May 12, 1979);

8.

Exhibit:

" Auxiliary Feedwater Flow Required for LOCA," Supplement 3 to the May 7, 1979 Small Break Analyses (May 24, 1979);

9.

Exhibit:

B&W Document 86-1103585-00, " System Response to Total Loss of SG Heat Sink,"

(August 7,,

1979);

10.

Exhibit:

Report, " Analysis Summary in Support of an Early RC Pump Trip," (August 21, 1979);

11.

Exhibit:

" Supplemental Small Break Analysis,"

Supplement to the August 21, 1979 Analysis in Support of an Early RC Pump Trip (September 12, 1979);

12.

Exhibit:

B&W Document 69-1106001-00, "Small Break Operating Guidelines," November, 1979; 13.

Exhibit:

B&W Document 86-1117679-000, "Small Break With Failed PORV," (February 11, 1980);

14.

Licensee's Testimony of Robert W.

Keaten, Michael J.

Ross and Robert C. Jones, Jr.

in Response to UCS Contention No.

7, ANGRY Contention No. V(B) and Sholly Contention No. 6(b) (Detection of Inadequate Core Cooling) ;

15.

Licensee's Testimony of Philip R. Clark, Michael J.

Ross and E. S. Patterson in Response to UCS Con-tention No. 10 and Sholly Contention No. 3 (Safety System Bypass and Override) ;

16.

Licensee's Testimony of Robert W.

Keaten, George R.

Braulke and George J.

Brazill in Response to UCS Contention No. 12, UCS Contention No. 14 and UCS Contention No. 3 (Safety Classification) ;

. 17.

Licensee's Testimony of James H. Correa, Gary T.

Urquhart and Robert C. Jones, Jr. in Response to UCS Contentions 5 and 6 (Valves and Valve-Testing) ;

18.

Exhibit:

Topical Report, BAW-10043, " Overpressure Protection for Babcock & Wilcox Pressurized Water Reactors," May 1972; 1

19.

Licensee's Testimony of Joseph A.

Torcivia and i

Paul J. Shipper, Jr. in Response to UCS Contention No. 4 (Connection of Pressurizer Heater to Diesel);

)

20.

Licensee's Testimony of T. Gary Broughton, Gerald J.

Sadauskas and Luther L. Joyner in Response to Sholly Contention No. 6(a) (Integrated Control System);

21.

Licensee's Testimony of Louis C. Lanese in Response to Sholly Contention No. 1 (Containment Isolation) ;

22.

Licensee's Testimony of William F.

Itschner, Richard Barley, James Moore and Charles Pelletier in Response to the Lewis Contention and ANGRY Contention No.

V(D) (Filters);

23.

Licensee's Testimony of Patrick S. Walsh, William E.

Meek, Herbert Estrada, Jr., Julien M. Christensen j

and Thomas B. Sheridan in Response to Sholly Con-1 tention No. 15 and ANGRY Contention No. V(C)

(Control Room Design-Human Factors Engineering) ;

24.

Licensee's Testimony of William P. Hamilton and Robert W. Keaten in Response to Sholly Contention No. 13 and ECNP Contention No. 1(a) (Computer) ;

25.

Licensee's Testimony of Patrick S. Walsh and Ronald J. Toole in Response to UCS Contention No. 9 and ECNP Contention No.1(c) (Safety System Status Panel);

26.

Licensee's Testimony of T. Gary Broughton, Richard W. Dubiel and Victor H. Willems in Response to Sholly Contention No. 5 and ECNP Contention No. 1(d) (Instrument Ranges (In Plant)); and 27.

Licensee's Testimony of Edwin C. Fuhrer and Richard J. McGoey on the Physical Separation of Three Mile Island Units 1 and 2.

_iJ Q A

/L / + r > v A e-c Thomas A.

Baxter

UNITED STATES OF AMERICA NUCLEAR FIGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD i

In the Matter of

)

METROPOLITAN EDISON COMPANY

)

Docket No. 50-289

)

(Restart) i (Three Mile Island Nuclear

)

Station, Unit No. 1)

)

SERVICE LIST Ivan W. Smith, Esquire John A. I.evin, EL~uire Chai=an Assistant Ccunsel Atcmic Safety and Licensing Pennsylvania Public Utility C:2rm'n Board Panel Post Office Bcx 3265 U.S. Nuclear Regulatory W csion F2rrisburg, Pennsylvania 17120 Washington, D.C.

20555 Farin W. Carter, Escuire Dr. Walter H. Jordan Assistant Attocey Gene d Atcmic Safety and Licensing 505 Executive Ecuse Board Panel Post Office Box 2357 881 West Outer Drive Ha=isburg, Perr.syh'ania 17120 Oak Ridge, Tennessee 37830 John E. Minnich nr. Linda W. Little Chai: man, Dauphin County Board Atomic Safety and Licensing of Carissioners Board Panel Dauphin County Court.%:.se 5000 Hemitage Drive Front and Market Streets Raleigh, Nort.h Carolina 27612 Ha W, Pennsylvania 17101 James R. 'Itur*allotte, M"7 Walter W. C&en, Esquim Office of the Executive Iagal Directer Consurer Mvocate U. S. Nuclear Regulatory N esion Office of Censurer Mvoc: ate Washington, D.C.

20555 1425 St h g Square Har:2.sburg, Pennsyhania 17127 tocketing and Service Section Office of the Sec e m U. S. Nuclear Regulatcry C:rmissica Washingtcn, D.C.

20555

. Jordan D. Cunnig ham, Esquire Willie S. Jordan, III, Esqui:1!!

Attcrney for Newberry 'Icwnship Attorney for Pecple Against 3.1 clear T.M.I. Steering Osunittee Energy 2320 North Second Street Ha m & Weiss Harrisburg, Pennsylvania 17110 1725 Eye Street, N.W., suite 506 Washington, D.C.

20006 Th.d.:s= A. Adler, Esquire Widoff Reager Selkowitz & Aller It:Lrt Q. Pollard Post Office Box 1547 609 M mtpelier Street h mg, Pennsylvania 17105 Baltincre, Mt".yland 21218 Ellyn R. Weiss, Esquire W m Repford Attorney for the thion of Cormissi Judith' H. Jd:nsrud Scientists Envi. e.tal Coalition en Nuclear FL w & Weiss PcNer 1725 Eye Street, N.W., Suite 506 433 Orlando Avenue Washington, D.C.

20006 State Cbilege, Pennsylvania 16801 Steven C. Shelly Marvin I. Iewis 304 South Market Street 6504 Bradford Te m Mechanicsburg, Pennsylvania 17055 Philadelphia, Pennsylvania 19149 Daniel M. Pell, Esquire Marjorie M. Aa cdt AM R. D. 5 32 South Beaver Street Cbatesville, Pennsylvania 19320 York, Pennsylvania 17401 4

... _ _.