LER-1980-030, /03L-0:on 800813,during Normal Operation, Performing Surveillance Instruction 4.1.A.14,pressure Switches PS-1-81-A & PS-1-91-A Found Set Above Limits. Caused by Setpoint Drift.Switches Recalibr & Tested |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2961980030R03 - NRC Website |
|
text
.
c.
..,nu 2
- - eAa nEcutarony Comuissior.
(7 775 's LICENSEE EVENT REPORT
(]
ccNinot stock. l l
l l
l l
l (PLE AsE Pn:NT on tvPE ALL mEcuinto sNPomuATioNi x,
@] l A l L l B l R l F l 3 l@SS0 l0 l-l0 l0 l0 l0 l0 l-l0 l0 ii@Jo4 l 1 l 1 l 1 l 1 l@l l
l@
I 4 1 L4;1N5(E COOT le LICINSE NutsetM l
L8C&%St TYPE JG 93 4Al 58 CON'f PTil "g*,",' l L ]@l 0 l 5 l010 l( l 2 l 9 16 l@l 0l 81 1l 3l 8 l 0 l@l 019 l 0 l 5 l 8 l 0 l@
s en e'
ooCx at Nuveta se es evemt oAre re n
aaroar oats ao r. VENT DESCR6PTION AND PR08ABLE CONSEQUENCES h
% (_During nomal ooeration while performine ST 4.1. A.14. Pressure Switches PS-1-81A
@ Qnd PS-1-91A, Turbine First Stage Pressure, setpoints were found set above the T.S.
13_L:0 llable 3.1.A limits. Redundant switches PS-1-81B and PS-1-91B were operable. There_.
i 101.] (was no ef fect on the public health or safety. Previous events: 259/8058, 259/798, 259/
I o kJ {],816, 260/8022, 260/7916, 296/8022, 296/7912 and 296/797.
Ls_L.J L G, E] L..
s* 17 t "
cAUsE
C AUSE CWp VAtst CoOE c uJE sudCoot t'CYCNENT Coot
%dCoct sveCoGE g
l1 l A l@ {@ Q@ lIl Nl S l T l R l U l@ y@ Q @
A 9
10 tt
- 2 13 is t)
JQ
'EQUE%f t AL OCCua A, *if t 6tEPoa7
" E " C 'd
, r,a q:j fVENTW,AM a(70af No.
Coot fYPE
@,7g,',
t 8101 L-1 Iof31ol L,d to 13 I U
I, I LoJ 2,
n 2
- s 2
a s
aa MM '.'f##
of.'A'Nr
'""J??o?
movas O22 ^WS."r"u' s"i'.
'it.,'.<er
.JF'?AY.
LE.J@lF_Jg l Zl@
Q@
l 0 l 0 l 0 l7 l [YJ@
lNlg lLl@
lB l0 l6 l9,
JJ Je 3 *>
a6 40 el _
og 43 a4 CAUSE oESCRIPTiON ANo CCARECTIVE ACTIONe h 1iI.1l Pressure switches, Model B2T-A12SS, setpoints had drifted. The switches were inspected, 8 Irecalibrated and functionally tested for repeatabiliev. Other units will be checked QythenormalSIschedule. These switches will be replaced by an analog system.
i s I il l C1
[M5' or easrAtus @
5'sNYte v oisCcstav casca,etiom @
oowta l5 l'] (_@j@ [ 0l 9l 8l@l NA l
lBl@l Surveillance Testing 1,J,,,,,,
,%cs, li li] Laj @ Lz_J@l woomi o, ACi>virv @ J cocArioNo,asu m @
mign,e...u.a NA l
NA l
..,,,4.,,,os ". s u sc,,,,r.o
,v,,
l i l ] 1010 l 01@Lz_J@l NA
~
' ' nn.os,',',N,#,s o m,,,,,, o, @
!!1J10l0101@l NA 9
- e 11 11 1 O',.) Of OH f)AVAf,E f a, Aciu t t tv 6 Uts( RIP TION E,] Bj@l NA
,e sw t (H6PTION i > i 1 LNj,E @l NA I
ii i i ri i!i:
8 069'O 9 6'3'[E OF PREPAHEH
/
NAN PHON E -
1
Tennessee Valley Authority Forin BF-17 Browns Ferry Nuclear Plant BF 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION BFRO-50 296 /_ 8030 Technical Specification involved Table 3.1.A Reported Under Technical Specifier. tion 6.7.2.b(2)
Date of Occurrence 8/13/80 Time of Occurrence 0930
_ Unit 3
Identification and Description 'of' Occurrence:
PS-1-81A and PS-1-91A, Turbine First Stage Fressure, setpoints had drif ted above T.S. limits. Setpoints were found to be 174 psig and 169 psig, respectively, during SI testing.
T.S. limit is 167 psig.
Conditions Prior to Occurrence:
7Lnit 1 at 957. TME-Unit 2 at 94% We Unit 3 at 98% We Action specified in the Technical 8pecification Surveillance Requirements met jue to inoperable equipment. Describe N/A A_pparent Cause of Occurrene_e:
Instrument drift.
~
Analysis of Occurrence:
There was no damage to the plant equipment. Ther i was no activity re Nase, no personnel exposure or injury and no danger to the health or safety of the
~
public.
Corrective Action
Inspected, recalibrated and functionally tested for repeatability. These swite,hes will be replaced by an-analog system.
1 Fjagure Data:
259/8058, 259/798, 259/7816, 260/8022, 260/7916, 296/8022, 296/7912 and 296/797.
~
eriod - Lifetime; Responsibility - Administrative Supervisor
Oo
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000259/LER-1980-001, Supplemental LER 80-001/01T-1:on 800107,during Performance of Ster 7902 Per IE Bulletin 79-23,diesel Generator 3A Lost Speed Control.Caused by Deteriorated Elastomer Spider Coupling.Spider Coupling Replaced | Supplemental LER 80-001/01T-1:on 800107,during Performance of Ster 7902 Per IE Bulletin 79-23,diesel Generator 3A Lost Speed Control.Caused by Deteriorated Elastomer Spider Coupling.Spider Coupling Replaced | | | 05000259/LER-1980-001-01, /01T-0:on 800107,in Cold Shutdown While Performing Tests Per IE Bulletin 79-28,speed Control on Diesel Generator 3A Was Lost.Caused by Broken Coupling Which Connects Speed Pickup to Generator Shaft.Coupling Replaced | /01T-0:on 800107,in Cold Shutdown While Performing Tests Per IE Bulletin 79-28,speed Control on Diesel Generator 3A Was Lost.Caused by Broken Coupling Which Connects Speed Pickup to Generator Shaft.Coupling Replaced | | | 05000296/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000260/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000296/LER-1980-001-03, /03L-0:on 791230,w/Unit 3 in Shutdown,Bus Tie Board Was de-energized for Startup.Caused by Feeder Cable Failure.Work in Progress to Bypass Bad Cable Sections | /03L-0:on 791230,w/Unit 3 in Shutdown,Bus Tie Board Was de-energized for Startup.Caused by Feeder Cable Failure.Work in Progress to Bypass Bad Cable Sections | | | 05000260/LER-1980-001-03, /03L-0:on 791229,during Normal Operation,While Performing SI 4.2.B-1,switch 1 on Reactor Water Level LITS-3-58D Failed to Operate.Caused by Rendom Failure of Switch in Yarway Model 4418CE.Switch Replaced | /03L-0:on 791229,during Normal Operation,While Performing SI 4.2.B-1,switch 1 on Reactor Water Level LITS-3-58D Failed to Operate.Caused by Rendom Failure of Switch in Yarway Model 4418CE.Switch Replaced | | | 05000259/LER-1980-002-03, /03L-0:on 800112,during Shutdown for Refueling, Wind Direction Channel at 33-ft Elevation Failed Upscale. Caused by Lightning Damage at Meteorological Tower.Series 312D Millivolt to Current Converter Repaired | /03L-0:on 800112,during Shutdown for Refueling, Wind Direction Channel at 33-ft Elevation Failed Upscale. Caused by Lightning Damage at Meteorological Tower.Series 312D Millivolt to Current Converter Repaired | | | 05000259/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000260/LER-1980-002-03, /03L-0:on 791222,w/unit in Cold Shutdown,Found That Flow Control Valve 2-FCV-68-79 on Recirculation Sys Would Not Operate.Caused by Motor Pinion Gear Being Installed Backwards.Installment Procedures Will Be Revised | /03L-0:on 791222,w/unit in Cold Shutdown,Found That Flow Control Valve 2-FCV-68-79 on Recirculation Sys Would Not Operate.Caused by Motor Pinion Gear Being Installed Backwards.Installment Procedures Will Be Revised | | | 05000296/LER-1980-002-03, /03L-0:on 800117,while Performing Surveillance Instruction 4.5.B.1.d,residual Heat Removal Sys Flow Control Valve FCV.74-73 Tripped in mid-position.Caused by Valve Stem Lubricant Losing Lubricity,Causing Force on Motor | /03L-0:on 800117,while Performing Surveillance Instruction 4.5.B.1.d,residual Heat Removal Sys Flow Control Valve FCV.74-73 Tripped in mid-position.Caused by Valve Stem Lubricant Losing Lubricity,Causing Force on Motor | | | 05000260/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000296/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000260/LER-1980-003, Updated LER 80-03L/01X-1:on 800914,during EOC-3 Fuel Shuffling Operations,Fuel Assemblies Tz 758 & Tz 399 Discovered Misoriented 90 Degrees.Caused by Misorientation of 16 Fuel Assemblies During Previous Refueling Outage | Updated LER 80-03L/01X-1:on 800914,during EOC-3 Fuel Shuffling Operations,Fuel Assemblies Tz 758 & Tz 399 Discovered Misoriented 90 Degrees.Caused by Misorientation of 16 Fuel Assemblies During Previous Refueling Outage | | | 05000259/LER-1980-003-03, /03L-0:on 800112,while Performing Local Leak Rate Testing During Refueling Shutdown,Path Leakage Through MSIVs for 3 of 4 Main Steam Lines Exceeded Leak Rate Per Tech Specs.Caused by Normal Wear & Erosion | /03L-0:on 800112,while Performing Local Leak Rate Testing During Refueling Shutdown,Path Leakage Through MSIVs for 3 of 4 Main Steam Lines Exceeded Leak Rate Per Tech Specs.Caused by Normal Wear & Erosion | | | 05000296/LER-1980-003-03, /03L-0:on 800126,while Performing Control Rod Exercise,Control Rod 18-55 Would Not Insert W/Normal Drive Pressure.Caused by Failed Seal in Hydraulic Control Unit Directional Control Valve.Valve Repaired | /03L-0:on 800126,while Performing Control Rod Exercise,Control Rod 18-55 Would Not Insert W/Normal Drive Pressure.Caused by Failed Seal in Hydraulic Control Unit Directional Control Valve.Valve Repaired | | | 05000260/LER-1980-003-03, /03L-0:on 800122,during Normal Operation,Momentary Breach of Secondary Containment Occurred When Air Lock Doors Between Turbine & Reactor Bldg Were Simultaneously Opened.Caused by Misaligned Latch Lock & Latch Bolt | /03L-0:on 800122,during Normal Operation,Momentary Breach of Secondary Containment Occurred When Air Lock Doors Between Turbine & Reactor Bldg Were Simultaneously Opened.Caused by Misaligned Latch Lock & Latch Bolt | | | 05000296/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000259/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000260/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000296/LER-1980-004-03, /03L-0:on 800129,4160 Volt Bus Tie Board de-energized & Restored to Normal Cooling Tower Transformer Feeder.Caused by Need to Return Electrical Sys to Normal Configuration.No Recurrence Control Required | /03L-0:on 800129,4160 Volt Bus Tie Board de-energized & Restored to Normal Cooling Tower Transformer Feeder.Caused by Need to Return Electrical Sys to Normal Configuration.No Recurrence Control Required | | | 05000296/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000259/LER-1980-004-01, /01T-0:on 800118,during Refueling Outage,Ndt Insp Revealed Linear Indication 7/8 Inch Long in Reactor or Water clean-up Sys Weld DRWC-1-2.Cause Unknown.Defect Will Be Removed & Weld Repaired Prior to Startup | /01T-0:on 800118,during Refueling Outage,Ndt Insp Revealed Linear Indication 7/8 Inch Long in Reactor or Water clean-up Sys Weld DRWC-1-2.Cause Unknown.Defect Will Be Removed & Weld Repaired Prior to Startup | | | 05000260/LER-1980-004-03, /03L-0:on 800122,reactor Water Level Switch LIS-3- 203D Switch 2 Exceeded Tech Spec Limit During Normal Operation.Caused by Model 288A Switch Drifting Above Setpoint.Switch Tested,Inspected & Recalibr | /03L-0:on 800122,reactor Water Level Switch LIS-3- 203D Switch 2 Exceeded Tech Spec Limit During Normal Operation.Caused by Model 288A Switch Drifting Above Setpoint.Switch Tested,Inspected & Recalibr | | | 05000259/LER-1980-004, Forwards LER 80-004/01T-0 | Forwards LER 80-004/01T-0 | | | 05000296/LER-1980-005-03, /03L-0:on 800205,during Normal Operation,Fcv 74-73 Found Inoperable While Performing Surveillance Instruction. Caused by Random Failure of Gear Tooth in Limit Switch,Size SMB-2,Model 3-G.Limit Switch Replaced | /03L-0:on 800205,during Normal Operation,Fcv 74-73 Found Inoperable While Performing Surveillance Instruction. Caused by Random Failure of Gear Tooth in Limit Switch,Size SMB-2,Model 3-G.Limit Switch Replaced | | | 05000260/LER-1980-005-03, /03L-0:on 800125,while Performing Special Instruction 4.2.B-1 During Normal Operation,Switches 1,2 & 4 on LIS-3-58A Did Not Operate at Proper Setpoint.Caused by Switch 4 Hanging on Magnet.Switches Adjusted | /03L-0:on 800125,while Performing Special Instruction 4.2.B-1 During Normal Operation,Switches 1,2 & 4 on LIS-3-58A Did Not Operate at Proper Setpoint.Caused by Switch 4 Hanging on Magnet.Switches Adjusted | | | 05000260/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000259/LER-1980-005, Forwards LER 80-005/01T-0 | Forwards LER 80-005/01T-0 | | | 05000296/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000259/LER-1980-005-01, /01T-0:on 800118,during Refueling Outage,While Performing Insp Per IE Bulletin 79-14,found No Seismic Restraints in Drywell of Reactor Bldg Closed Cooling Water Piping.Restraints Will Be Installed Prior to Startup | /01T-0:on 800118,during Refueling Outage,While Performing Insp Per IE Bulletin 79-14,found No Seismic Restraints in Drywell of Reactor Bldg Closed Cooling Water Piping.Restraints Will Be Installed Prior to Startup | | | 05000296/LER-1980-006-03, /03L-0:on 800217,w/unit at Steady State Operation, Emergency Equipment Cooling Water Flow Did Not Meet Min Flow of 4 Gpm.Caused by Shells & Mud Preventing Adequate Flow Through Residual Heat Removal Pump 3B Seal Cooler Valve | /03L-0:on 800217,w/unit at Steady State Operation, Emergency Equipment Cooling Water Flow Did Not Meet Min Flow of 4 Gpm.Caused by Shells & Mud Preventing Adequate Flow Through Residual Heat Removal Pump 3B Seal Cooler Valve | | | 05000260/LER-1980-006-03, /03L-0:on 800203,while Running Electrical Checks on Recirculation Pump,Reactor Recirculation Pump 2A Was Accidentally Tripped.Caused by Misinterpretation of Labels on Recirculation Pump Trip Breakers | /03L-0:on 800203,while Running Electrical Checks on Recirculation Pump,Reactor Recirculation Pump 2A Was Accidentally Tripped.Caused by Misinterpretation of Labels on Recirculation Pump Trip Breakers | | | 05000296/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000260/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000259/LER-1980-006-03, /03L-0:on 800122,during Refueling Operations, Control Rod Driveline Accumulator Level Switch LS-1-305-129 on Unit 38-11 Was Found Inoperable.Caused by Broken Reed Switch.Switch Replaced | /03L-0:on 800122,during Refueling Operations, Control Rod Driveline Accumulator Level Switch LS-1-305-129 on Unit 38-11 Was Found Inoperable.Caused by Broken Reed Switch.Switch Replaced | | | 05000259/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000260/LER-1980-007-03, /03L-0:on 800203,during Normal Operation,Reactor Recirculation Pump 2B Tripped.Caused by Pickup of Recirculation Motor Generator Set Generator Stator Temp Relay.Tests Run,No Problems Found | /03L-0:on 800203,during Normal Operation,Reactor Recirculation Pump 2B Tripped.Caused by Pickup of Recirculation Motor Generator Set Generator Stator Temp Relay.Tests Run,No Problems Found | | | 05000296/LER-1980-007-03, /03L-0:on 800301,after Offsite Power Was Restored to 4-kV Bus Tie Board,Short Period of Time Elapsed Before Reclosure of Bus Tie Boarder Feeder Breaker.Apparent Disagreement in Time Is Still Being Investigated | /03L-0:on 800301,after Offsite Power Was Restored to 4-kV Bus Tie Board,Short Period of Time Elapsed Before Reclosure of Bus Tie Boarder Feeder Breaker.Apparent Disagreement in Time Is Still Being Investigated | | | 05000260/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000259/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000259/LER-1980-007-03, /03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed | /03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed | | | 05000296/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000296/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000260/LER-1980-008-31, /03L-0:on 800206,while Conducting Automatic Depressurization Sys Logic Functional Test,Relay 10A-K26 Manually Operated in Place of Relay 2E-K26 Causing Recirculation Pump 2B Trip.Caused by Operator Error | /03L-0:on 800206,while Conducting Automatic Depressurization Sys Logic Functional Test,Relay 10A-K26 Manually Operated in Place of Relay 2E-K26 Causing Recirculation Pump 2B Trip.Caused by Operator Error | | | 05000296/LER-1980-008-03, /03L-0:on 800402,3B Diesel Generator Governor Actuator Would Not Respond Properly During Operability Surveillance Instruction.Cause Unknown.Oil Contamination Suspected.Sump Flushed & Refilled | /03L-0:on 800402,3B Diesel Generator Governor Actuator Would Not Respond Properly During Operability Surveillance Instruction.Cause Unknown.Oil Contamination Suspected.Sump Flushed & Refilled | | | 05000259/LER-1980-008, Forwards Updated LER 80-008/03L-1 | Forwards Updated LER 80-008/03L-1 | | | 05000260/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000259/LER-1980-008-03, During Scheduled Refueling Outage,Hpci Turbine Had Crack in Coupling Bearing Support Pedestal.Possibly Caused by Water Hammer in Main Steam Supply Line | During Scheduled Refueling Outage,Hpci Turbine Had Crack in Coupling Bearing Support Pedestal.Possibly Caused by Water Hammer in Main Steam Supply Line | | | 05000296/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | | | 05000296/LER-1980-009-03, /03L-0:on 800404,during Normal Operation,Relay 16A-K63B Overheated & Failed,Blowing Fuse Causing Containment Isolation Sys Group 6 Valves to Fail Closed. Caused by Natural Aging of Relay.Relay & Fuse Replaced | /03L-0:on 800404,during Normal Operation,Relay 16A-K63B Overheated & Failed,Blowing Fuse Causing Containment Isolation Sys Group 6 Valves to Fail Closed. Caused by Natural Aging of Relay.Relay & Fuse Replaced | |
|