05000296/LER-1980-030-03, /03L-0:on 800813,during Normal Operation, Performing Surveillance Instruction 4.1.A.14,pressure Switches PS-1-81-A & PS-1-91-A Found Set Above Limits. Caused by Setpoint Drift.Switches Recalibr & Tested

From kanterella
(Redirected from ML19331E215)
Jump to navigation Jump to search
/03L-0:on 800813,during Normal Operation, Performing Surveillance Instruction 4.1.A.14,pressure Switches PS-1-81-A & PS-1-91-A Found Set Above Limits. Caused by Setpoint Drift.Switches Recalibr & Tested
ML19331E215
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/05/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19331E214 List:
References
LER-80-030-03L-03, LER-80-30-3L-3, NUDOCS 8009090341
Download: ML19331E215 (2)


LER-1980-030, /03L-0:on 800813,during Normal Operation, Performing Surveillance Instruction 4.1.A.14,pressure Switches PS-1-81-A & PS-1-91-A Found Set Above Limits. Caused by Setpoint Drift.Switches Recalibr & Tested
Event date:
Report date:
2961980030R03 - NRC Website

text

.

c.

..,nu 2

- eAa nEcutarony Comuissior.

(7 775 's LICENSEE EVENT REPORT

(]

ccNinot stock. l l

l l

l l

l (PLE AsE Pn:NT on tvPE ALL mEcuinto sNPomuATioNi x,

@] l A l L l B l R l F l 3 l@SS0 l0 l-l0 l0 l0 l0 l0 l-l0 l0 ii@Jo4 l 1 l 1 l 1 l 1 l@l l

l@

I 4 1 L4;1N5(E COOT le LICINSE NutsetM l

L8C&%St TYPE JG 93 4Al 58 CON'f PTil "g*,",' l L ]@l 0 l 5 l010 l( l 2 l 9 16 l@l 0l 81 1l 3l 8 l 0 l@l 019 l 0 l 5 l 8 l 0 l@

s en e'

ooCx at Nuveta se es evemt oAre re n

aaroar oats ao r. VENT DESCR6PTION AND PR08ABLE CONSEQUENCES h

% (_During nomal ooeration while performine ST 4.1. A.14. Pressure Switches PS-1-81A

@ Qnd PS-1-91A, Turbine First Stage Pressure, setpoints were found set above the T.S.

13_L:0 llable 3.1.A limits. Redundant switches PS-1-81B and PS-1-91B were operable. There_.

i 101.] (was no ef fect on the public health or safety. Previous events: 259/8058, 259/798, 259/

I o kJ {],816, 260/8022, 260/7916, 296/8022, 296/7912 and 296/797.

Ls_L.J L G, E] L..

s* 17 t "

cAUsE

C AUSE CWp VAtst CoOE c uJE sudCoot t'CYCNENT Coot

%dCoct sveCoGE g

l1 l A l@ {@ Q@ lIl Nl S l T l R l U l@ y@ Q @

A 9

10 tt

  1. 2 13 is t)

JQ

'EQUE%f t AL OCCua A, *if t 6tEPoa7

" E " C 'd

, r,a q:j fVENTW,AM a(70af No.

Coot fYPE

@,7g,',

t 8101 L-1 Iof31ol L,d to 13 I U

I, I LoJ 2,

n 2

s 2

a s

aa MM '.'f##

of.'A'Nr

'""J??o?

movas O22 ^WS."r"u' s"i'.

'it.,'.<er

.JF'?AY.

LE.J@lF_Jg l Zl@

Q@

l 0 l 0 l 0 l7 l [YJ@

lNlg lLl@

lB l0 l6 l9,

JJ Je 3 *>

a6 40 el _

og 43 a4 CAUSE oESCRIPTiON ANo CCARECTIVE ACTIONe h 1iI.1l Pressure switches, Model B2T-A12SS, setpoints had drifted. The switches were inspected, 8 Irecalibrated and functionally tested for repeatabiliev. Other units will be checked QythenormalSIschedule. These switches will be replaced by an analog system.

i s I il l C1

[M5' or easrAtus @

5'sNYte v oisCcstav casca,etiom @

oowta l5 l'] (_@j@ [ 0l 9l 8l@l NA l

lBl@l Surveillance Testing 1,J,,,,,,

,%cs, li li] Laj @ Lz_J@l woomi o, ACi>virv @ J cocArioNo,asu m @

mign,e...u.a NA l

NA l

..,,,4.,,,os ". s u sc,,,,r.o

,v,,

l i l ] 1010 l 01@Lz_J@l NA

~

' ' nn.os,',',N,#,s o m,,,,,, o, @

!!1J10l0101@l NA 9

  • e 11 11 1 O',.) Of OH f)AVAf,E f a, Aciu t t tv 6 Uts( RIP TION E,] Bj@l NA

,e sw t (H6PTION i > i 1 LNj,E @l NA I

ii i i ri i!i:

8 069'O 9 6'3'[E OF PREPAHEH

/

NAN PHON E -

1

Tennessee Valley Authority Forin BF-17 Browns Ferry Nuclear Plant BF 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION BFRO-50 296 /_ 8030 Technical Specification involved Table 3.1.A Reported Under Technical Specifier. tion 6.7.2.b(2)

Date of Occurrence 8/13/80 Time of Occurrence 0930

_ Unit 3

Identification and Description 'of' Occurrence:

PS-1-81A and PS-1-91A, Turbine First Stage Fressure, setpoints had drif ted above T.S. limits. Setpoints were found to be 174 psig and 169 psig, respectively, during SI testing.

T.S. limit is 167 psig.

Conditions Prior to Occurrence:

7Lnit 1 at 957. TME-Unit 2 at 94% We Unit 3 at 98% We Action specified in the Technical 8pecification Surveillance Requirements met jue to inoperable equipment. Describe N/A A_pparent Cause of Occurrene_e:

Instrument drift.

~

Analysis of Occurrence:

There was no damage to the plant equipment. Ther i was no activity re Nase, no personnel exposure or injury and no danger to the health or safety of the

~

public.

Corrective Action

Inspected, recalibrated and functionally tested for repeatability. These swite,hes will be replaced by an-analog system.

1 Fjagure Data:

259/8058, 259/798, 259/7816, 260/8022, 260/7916, 296/8022, 296/7912 and 296/797.

~

  • Retention : -

eriod - Lifetime; Responsibility - Administrative Supervisor