Forwards IE Bulletin 80-07,Suppl 1, BWR Jet Pump Assembly Failure. No Response Required
ML19331E188
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/13/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 8009090057
Download: ML19331E188 (1)


Text

'o, UNITED STATES

/

- NUCLEAR REGULATORY COMMISSION o

a REGION 11 o,

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 o

)

MAY 13 1980 In Reply Refer To:

RII:JPO 50-321 x 50-366 j

\\

' Georgia Power Company

~

Attn:

J. H. M ller, Jr.

Executive Vice President 270 Peachtree Street i

Atlanta, GA 30303 Gentlemen:

)

Enclosed is IE Bulletin No. 80-07, Supplement No. 1, which specifies the NRC offices that should receive written reports submitted in response to this Bulletin.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, James P. O'Reilly Director

Enclosures:

1.

IE Bulletin No. 80-07, Supplement No. 1 2.

List of IE Bulletins Recently Issued

~

800g999yyy

t NAY 131980

" Georgia Power Company '

cc'w/ encl:

M. Manry,-Plant Manager

. Post Office-Box 442 Baxley, Georgia 31513 C.'E. Belflower LSite QA Supervisor Post Office Box 442 Baxley, Georgia 31513 W. A. Sidner, Ceneral Manager Nuclear Generation Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30303

~.

1 l

a

+

--e, m

e

. o

~

SSINS No.: 6820.

Accession No.:

UNITED STATES

'8005050055 NUCLEAR REGULATORY COMMISSION OFFICE OF. INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 D

{'

May 13, 1980 0 E

- 3JJ ib s

IE Bulletin No. 80-07 Supplement No. 1 BWR JET PUMP ASSEMBLY FAILURE s

C.

Reporting Requirements The information in Items A.3, and B.1, is requested under the provisions of 10 CFR 50.54(f). Accordingly, you are requested to provide within the time periods.specified in these items, written statements of this informa-tion, signed under oath or affirmation.

These reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C.

20555.

Approved by GAO, B180225 (R0072); clearance expires 7-31-80.

Approval was given under a blanket clearance specifically for identified generic problems.

t 4

l-E A

4 IE Bulletin No. 80-07 Enclosure Supplement No. 1 May 13, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

80-07 BWR Jet Pump Assembly 5/13/80 All GE BWR-3 & BWR-4 Suppl. I' Failure reactor facilities

?with an OL 80-13 Cracking In Core Spray 5/12/80 All BWR's with an Spargers OL 80-12 Decay Heat Removal System 5/9/80 Each PWR with an OL Operability 80-11 Masonry Wall Design 5/8/80 All power reactor facilities with an OL, except Trojan 80-10 Contamination of 5/6/80 All power reactor Ncaradioactive System and facilities with an Resulting Potential for OL or CP Unmonitored, Uncontrolled Release to Environment 80-09 Hydramotor Actuator 4/17/u0 All power reactor Deficiencies operating facilities and holders of power reactor construction permits 80-08 Examination of Containment 4/7/80 All power rcactors with Liner Penetration Welds a CP and/or OL no later than April 7,1980 80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and Failure BWR-4 facilities with an OL 80-06 Engineered Safety Feature 3/13/80 All power reactor (ESF) Reset Controls facilities with an OL 80-05 Vacuum condition Resulting 3/10/80 All PWR power reactor In Damage To Chemical Volume facilities holding Control System (CVCS) Holdup OLs and to those with Tanks a CP 01B Environmental Qualification-2/19/80 All power reactor of Class IE Equipment facilities with an OL 80-04 Analysis of a PWR Main 2/8/80 All PWR reactor facilities Steam Line Break With holding OLs and to those Continued Feedwater nearing licensing Addition