ML19331E182
| ML19331E182 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/13/1980 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 8009090046 | |
| Download: ML19331E182 (1) | |
Text
f bec to DAC:ADM:
l CENTRAL FILES
'O PDR:HQ
/pu.roo,%,t UNITED STATES NUCLEAR REGULATORY COMMISSION LPOR 3v REGloN IV l
E ' ' ' '
3 611 RYAN PLAZA oRIVE $UITE 10oo NSIC 3,, '-
[
ARLINGTON, TEXAS 76012
- %, [.I /
STATE May 13, 1980 Docket No. 50-298 1
Nebraska Public Power District ATTN:
J. M. P11 ant, Director Licensing & Quality Assurance Post Office Box 499 Columbus, Nebraska 68601 Gentlemen:
Enclosed is IE Bulletin No. 80-07, Supplement No.1, which specifies the NRC offices that should receive written reports submitted in response to this Bulletin.
Should you have any questions regarding this Bulletin or the actions re-quired by you, please contact this office.
Sincerely,
.m fr 1-b
'K. V. Seyfrit
/
Director i
Ec losures:
1.
IE Bulletin No. 80-07, Supplement No. 1 2.
List of IE Bulletins Recently Issued cc:
L. C. Lessor, Superintendent Cooper Nuclear Station Post Office Box 98 Brownville, Nebraska 68321 8009090 N S
SSINS No.:
6820
~ Accession No.:
UNITED STATES 8005050055.
NUCLEAR REGULATORY COMMISSION D D l' OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 olj J M
,o IE Bulletin No. 80-07, Supplement No. 1 Date: May 13, 1980 Page 1 of 1 BWR JET PUMP ASSEMBLY FAILURE C.
Reporting Requirements The information in Items A.3, and B.1, is requested under the provisions of 10 CFR 50.54(f). Accordingly, you are requested to provide within the time periods specified in these items, written statements of this informa-tion, signed under oath or affirmation.
These reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C.
20555.
Approved by GAO, B180225 (R0072); clearance expires 7-31-80.
Approval was given under a blanket clearance specifically for identified generic problems.
Y
IE Bulletin No. 60-07, Supplement No. 1 May 13, 1980 RECENTLY ISSUED IE BULLETINS
' Bulletin Subject Date Issued Issued To No.
80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and BWR-4 Failure facilities with an Operating License (OL) 80-08 Examination of Containment 4/7/80 All power reactors with a Liner Penetration Welds Construction Peruit and/or Operating License (OL) 80-09 Hydramotor Actuator 4/17/80 All power reactor Deficiencies operating facilities and holders of power reactor construction permits (cps) 80-10 Contamination of 5/6/80 All power reactor Nonradioactive System and facilities with an Resulting Potential for Operating License (OL)
Unmonitored, Uncontrolled or Construction Permit Release to Environment (CP) 80-11 Masonry Wall Design 5/8/80 All power reactor facilities with an Operating License (OL),
except Trojan, 80-12 Decay Heat Removal System 5/9/80 Each PWR with an Operability Operating License (OL) 80-13 Cracking In Core Spray 5/12/80 All BWR's with an Operating License (OL)
,