ML19331E177

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-07,Suppl 1, BWR Jet Pump Assembly Failure. No Response Required
ML19331E177
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 05/13/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Weigand J
GULF STATES UTILITIES CO.
References
NUDOCS 8009090039
Download: ML19331E177 (1)


Text

PDR LPDR-TIC /

/*44 UNITED STATES NSIC 9'o, NUCLEAR REGULATORY COMMISSION y*

CENTRAL FILES REGloN IV

/

=.

.*I E !

o

. 611 RYAN PLAZA DRIVE,SUITF 1000

% [rj -

Dj ARLINGTON, TEXAS 76012 s r.

a

'% " "..* /

May 13, 1980 In Reply Refer To:

RIV Docket Nos. 50-458/IE Bulletin No. 80-07, Supplement No.

50-459/IE Bulletin No. 80-07, Supplement No. 1 Gulf States Utilities Attn:

Dr. J. G. Weigand, Vice President Operations and Technical Systems Post Office Box 2951 Beaumont, Texas 77704 Gentlemen:

The enclosed 1E Bulletin No. 80-07, Supplement No. 1 is forwarded to you for information. No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, 0

l:

t N kl,1

' ~ ';' t Karl V. Seyfrit / /,

Director

./ '

Enclosures:

1.

IE Bulletin No. 80-07, Supplement No. 1 2.

List of IE Bulletins Recently Issued

-8009090089-

SSINS No.:

6820 Accession No.:

UNITED STATES 8005050055 NUCLEAR REGULATORY COMMISSION

% 9 I' D r' rg/d OFFICE OF INSPECTION AND ENFORCEMENT jp p WASHINGTON, D.C.

20555 g

g IE Bulletin No. 80-07, Supplement No. 1 Date: May 13, 1980 Page 1 of 1 BWR JET PUMP ASSEMBLY FAILURE C.

Reporting Requirements The information in Items A.3, and B.1, is requested under the provisions of 10 CFR 50.54(f). Accordingly, you are requested to previde within the time periods specified in these items, written statements of this informa-tion, signed under oath or affirmation.

These reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C.

20555.

Approved by GAO, B180225 (R0072); clearance expires 7-31-80.

Approval was given under a blanket clearance specifically for identified generic problems.

l t

i i

l L

3

--r-.

IE Bulletin No. 80-07, Supplement No. 1 May 12, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and BWR-4 Failure facilities with an Operating License (OL) 80-08 Examiaation of Containment 4/7/80 All power reactors with a Liner Penetration Welds Construction Permit and/or Operating License (OL) 80-09 Hydramotor Actuator 4/17/80 All power reactor Deficiencies operating facilities and holders of power reactor constructinn permits (cps)

~

80-10 Contamination of 5/6/80 All power reactor Nonradioactive System and facilities with an Resulting Potential for Operating License (OL)

Unmonitored, Uncontrolled or Construction Permit Release to Environment (CP) 80-11 Masonay Wall Design 5/8/80 All power reactor facilities with an Operating License (OL),

except Trojan 80-12 Decay Heat Removal System 5/9/80 Each PWR with an Operability Operating License (OL) 80-13 Cracking Yn Core Spray 5/12/80 All BWR's with an Operating License (OL)

Enclosure

._s

-eq "v

+

M~