ML19331E176
| ML19331E176 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/14/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 8009090029 | |
| Download: ML19331E176 (1) | |
Text
-
e
'o, UNITED STATES 8"-
,n NUCLEAR REGULATORY COMMISSION S
r[E REGION lil g
799 ROOSEVELT ROAD
% *.. + o.
GLEN E LLYN,ILLINOls 60137 Docket No. 50-341 The Detroit Edison Company ATTN: Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 482?.6 Gentlemen:
Enclosed is IE Bulletin'No. 80-07, Supplement No. 1, which specifies the NRC offices that should receive written reports submitted in response to this Bulletin.
Should you have any questions regarding this Bulletin or the actions re-quired by you, please contact this office.
Sincerely, G.-_ud h e'h u i
yy ames G. Keppler Director
Enclosure:
IE Bulletin No. 80-07, Supplement No. 1 cc w/ encl:
Central Files Director, NRR/DPM Director, NRR/ DOR PDR i
TIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney 8000090029 km..
4 SSINS No.:
6820 Accession No.:
UNITED STATES 8005050055 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT m
-q a
WASHINGTON, D.C.
20555 s k
. \\,- 3
\\,,
May 13, 1980 IE Bulletin No. 80-07 Supplement No. 1 BWR JET PUMP ASSEMBLY FAILURE C.
Reporting Requirements The information in Items A.3, and B.1, is requested under the provisions of 10 CFR 50.54(f).
Accordingly, you are requested to provide within t.se time periods specified in these items, written statements of this informa-tion, signed under oath or affirmation.
These reports should be submitted to the Director of the appropriate NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Operations Inspection, Washington, D.C.
20555.
Approved by GAO, B180225 (R0072); clearance expires 7-31-80.
Approval was given under a blanket clearance specifically for identified generic problems.
IE Bulletin No. 80-07 Enclosure
_ Supplement No. 1 May 13, 1980 RECENTLY ISSUED IE BULLETINS Bulletin' Subject Date Issued Issued To No.
80-13 Cracking In Core Spray 5/12/80 All BWR's with an Spargers OL 80-12 Decay Heat Removal System 5/9/80 Each PWR with an OL Operability 80-11 Masonry Wall Design 5/8/80 All power reactor facilities with an OL, except Trojan 80-10 Contamination of 5/6/80 All power reactor Nonradioactive System and facilities with an Resulting Potential for OL or CP Unmonitored, Uncontrolled Release to Environment 80-09 Hydramotor Actuator 4/17/80 All power reactor Deficiencies operating facilities and holders of power reactor constructior, permits 80-08 Examination of Containment 4/7/80 All power reactors with Liner Penetration Welds a CP and/or OL no later than April 7, 1980 80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and Failure BWR-4 facilities with an OL 80-06 Engineered Safety Feature 3/13/80 All power reactor (ESF) Reset Controls facilities with an OL 80-05 Vacuum Condition Resulting 3/10/80 All PWR power reactor In Damage To Chemical Volume facilities holding Control System (CVCS) Holdup Ols and to those with Tanks a CP 79-01B Environmental Qualification 2/29/80 All power reactor of Class IE Equipment facilities with an OL 80-04 Analysis of a PWR Main 2/8/80 All PWR reactor facilities Steam Line Break With holding OLs and to those Continued Feedwater nearing licensing Addition
.