Monthly Operating Rept for Jul 1980
ML19331C444
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/10/1980
From: Blackwell R
GEORGIA POWER CO.
To:
Shared Package
ML19331C443 List:
References
NUDOCS 8008180400
Download: ML19331C444 (6)


Text

___

o

.e git

~

OPERATING DATA REPORT DOCKET NO. 50-366 DATE 8-10-60

/-

COMPLETED BY R - f 81 acbell TELEPHONE W - * - / ',01-e..

OPERATING STATt'S Notes Hatch 2

1. Unit Name:

7-10

2. Reporting Period:
3. Licensed Thermal Power (MW:):

2436 817.0

4. Nameplate Rating (Gross MWel:

784.0

5. Design Electrical Rating (Net MWe):

805.7

6. Maximum Dependable Capacity (Gross SIWE):

777 7

7. Maximum Dependsb!c Capacity (Net MWe):
8. If Changes Occur in Capscity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Ressoas For Restrie: ions,If Any:

j s

This Month Yr.-to-Date Cumnistive 744 5111 7944

11. Hours in Reporting Period 585.3 3458.3 6121.8
12. Number Of Hours Reactor W:s Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 566.8 3215.9 5629.5
14. Hours Generator On.Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1297140

_ 7013680 12507742

17. Gross Electrical Energy Generated (MWH) 429I30 2332830 4168790
18. Net Electrical Energy Genersted OtWH).

408692 2219933 3977070 76.2 62.9 10.9

19. Unit Service Factor 76.2 62.9 70.9
20. Unit Arsilability Factor
21. Unit Cap 2 city Fsetor iUsing 3tDC Net) ' -

71.1 56.2 64.8 70.1 55.4 63.9

22. Unit Capscity Factor tUdng DER-Net) 23.8 15.5 13.5
23. Unit Forced Outsge Rate
24. Shutdowns Scheduled Over Next 6 MonthsIType.Dste.and Duration of Eschi:

P

25. If Shut Down At End Of Report Period. Estimated Date of Stsrtup:
26. Units in Test Ststus IPrior to Commercis! Operation):

Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION

.... _. gop 7 3 sons.180 W i

j

= *

\\

r o

d.)

d AVERAGE DAILY UNIT POWER LEVEL 1

5d-366 DOCKET NO.

UNIT' Hatch 2

[-

DATE' 8-10-80 COMPLETED BY-R. M. Blaciwell 912-367-7781 j

TEl.EPHONE n

\\

7-80

^

4 MONTH

~

DAY AVERAGE DAILY POWER LEVEL DAY ^

AVERAGE DAILY POWER LEVEL

=

(MWe-Net)

(MWe-Net) 3 772 37 726 2

774

?

18 720 772 591 3

3, 4

769 20 737 765 759 5

21 6

765 759 22 765 760 7

23 7ist 763 g

24

{.

9 762 723 25 758 26

-2 10 11 13I 27

-9' M

12 42

-6 28 530

-6 13 29 718

-7 14 30 IS 721

-11 3g 16 724

~

INSTRUCTIONS On this format. list the average dady unit power levelin MWe Net for cach day in the rebirting month. Compute to the nearest whole megswatt.

gy - i a

.g e

.4 a m.

.6

++wew ** *, *.

      • =***+-+N'

-m--w-, - - -

9.,-,9-,-

e w -7.y g=,_%.

.wey.

-,-w-w-wy--.-ow-m-yvv-,+--vw-e---ien v ww- = w w - y ww,,ge w -e ww,w w y-yv.,-- we w egyw-py-a==r+f-vvve'w'rm e v ve "e " '- WTNFmW"-NW

'-vW7-t"

p h

i.

f j

DOCKET NO.

    • O 'l%

UNIT SilUTDOWNS AND F0WER REDUCTIONS 3

UNIT NAME Itatch 7 l

\\

l DATE ti-10-80 1

(.

CO!!PLETEI) By R. M. filactwell l

REPORT MONill 7-80 TELLFilONE 912-M /- / /81 g

j I

3 l

l l

a l..

Cause & Cursective

.$'E

].[}

Lkensee Eg

hvl, I

Action to H[

{

ce Event u3 M=

Nii.

.Date j di Report #

Nu jU Prevent Recurrence an.

i

[,,,

80,800711.-

F 35:30 A

3 2-80-102.

IA INSTRU "A" channel RPS was deenergized and i

had a group 1 on that channel while F

deenergizing "A".

"B" was deenergiz-ed before "A" channel could be reset received group 1 signal through b6th j

channe,ls-resulting.in scram.

CONR00 Reduce.d load in order to perfosm rod t

l 80-24 800718 F

39:00 D

5 NA' RB pattern adjustment.

j.

l j

80-26 800726 F

117:42 B

2 NA,

IC ACCUMli Rx* manual scram pejr IED 80-17 SDV j.

analysis proved satisfactory

.' -l'.

l i

I 3

4 I

2 F: Forced Reason:

Method:

Exhibit G. Instsuctions S: Scheduled A l:quipment Failure (Esplain) 1 Manual

,for Preparation of Data D. Maintenance of Teil 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File INUREG.

I l

D Regulatory Resielction 00thst@Empildnj 0161)

E-Operator Training & Lkense Emandnation 4-Continuat1on j

5-Load Reduction 3

F Administrative Exlilble I Same Source G Operational Earut (Explain) 7 Other.

(9/77) llother(Explain) i

'.6

cl

~

rNARRATIVE REPORT UNIT 2 July lith RX scram at 04:38, received 1/2 group 1

isolation on "B"

channel RPS.

"A" channel was

- - j deenergizedi and upon being energized"B" c hanne l.-

was deenergized.

Received'1/2 group "I"

on "3"

channel before "A" channel could be reset c...

July 12th At 10:30 Rx critical 16:08 generator on line July 18th 23:30 reduced load in order to perform rod pattern adjustment.

Unit resumed rated flow and rated thermal at 14:30 on 7-10-80.

July 26th 02:18 generator off line 01:10 Rx manually scrammed per IEB 80-17 scram discharge volume analysis proved satisfactory v

July 31th Rx critical at 11:10.

Rx auto sertam at 19:37 per IEB 80-17.

APRM A

and APRM E

upscale tripped turbine.

Scram discharge volume analysis proved satisfactory.

There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during June of 1980.

e l

l l

P l

1 s

0-n-

e

.m.

st,

,,.___p,

~~

a HATCH 2 SAFETY.U RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR JULY 1980 l

1...

NUMBER DATE COMPLETED DESCRIPTION 80-2411 6-30-80 Main steam line drain valve cover

- full of water.

Cleaned it

-out.-

.,c' and checked torque amp 79-3299 6-25-80 Replaced Unit 2 RCIC barometric

/

condenser pump and motor 80-2662 6-30-80 Replaced 0-ring on bonnett to strainer

  • drain for radwaste

+

80-2653 6-30-80 Adjusted bolts on CS test line throttle valve 80-2520 6-30-80 Repaired bearing in RHR SW pump 21 80-2617 6-27-80 calibra'ted 2T48-N211 switch on Rx to torus vacuum breaker isolation valve 80-2404 6-25-80 Replaced computer input logic module on radwaste floor drain collector pump 80-1755 6-18-80 Tightened backing on 16" 300 lb globe valve 63-2692 7-9-80 Replaced 2 PRM cord on APRME 36 36-37 80-2758 7-10-80 Replaced Unit I gate on flow unit "B"

80-2695 7-11-80 Calibrated guage on HPCI pump suction and discharge 80-2218 7-10-80 Cleaned seat and ball of valve on CBWRT pump flush valves 80-2698-7-3-80 Repaired lever aun on micro-switch on annunciator on "HPCI turbine inlet drain pot high level" g

~

80-1580 7-15-80 calibrated mise. temp recorder,,

80-2819 7-14-80 Adjusted water regulator on' sample chiller water analysis roos 0

O

._,-m.__...

m

^

i

-r

. e *.

7-14-80,.'

Adjustod limit switch on wask 80-2843

filter, holding pump discharge valve indicat.or

~

80-1578 7-26-80 Replaced bad limit solenoid on mise temp recorder 80-2785 7-10-80 Checked limit switch on scram-discharge volume vent valve 80-5239 7-17-80 Replaced R3 resistor on ICPS LPRMS 80-1819 7-16-80 Replaced capacitors in inverter on steam supply valve to RCIC 80-1899 7-21-80 Regrouted around sleeve on H-16110 H-26304 80-2429 7-6-80 Performed surveillance of mechanical snubbers in Unit 2

drywell y

  • 80-2922 7-23-80 Checked ace pressure and cleaned packing and seals and valves on standby liquid control system "A"

80-2454 7-15-80 Tied in piping on cooling water to RER and SW pumps per DCR 8-129 80-2076 7-15-80 Rerouted cooling water pipe per DCR 80-129 on PSW and RHR SW pump motor cooling water supply piping.