PM-80-785, Forwards Monthly Operating Rept for Jul 1980

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jul 1980
ML19331C442
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/10/1980
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19331C443 List:
References
PM-80-785, NUDOCS 8008180397
Download: ML19331C442 (1)


Text

-

a Gecega Power Corepany Post Otce Box 442 Barey Georoa 31513 Te'essene 912 367-7781 912 537-9444 h

}\\\\b g @

g Georgia Power Edwin I. Hatch Nuclear Plant g

tre roav, ecc tmm August 10, 1980 PM-80-785 PLANT E.

I.

HATCH NRC Monthly Operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.

n

.M.

Manry Plant Manager CLC/pebe A 006

.s

/

800818033f R