ML19331C343

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Requests Info Re Estimate of Manpower Associated W/Corrective Actions Needed After Identifying Problem
ML19331C343
Person / Time
Site: Hatch, Vogtle  Southern Nuclear icon.png
Issue date: 07/31/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 8008140582
Download: ML19331C343 (1)


Text

'

s@

p reo

/E

[

UNITED STATES s-8

'e},

NUCLEAR REGULATORY COMMISSION P

{

nE REGION 11 e

101 MARIETTA sT., N.W., sulTE 3100 ATLANTA, GEORGIA 30303 o

Jul. 311980 In Reply Refer To:

RII:JP0_.___

407321, 50-366 g' g 504 247 50 425 Georgia Power Company ATTN:

J. H. Miller, Jr.

Executive Vice President 270 Peachtree Street Atlanta, GA 30303 Gentlemen:

Enclosed is IE Bulletin No. 80-20 which requires action by you with regard to your nuclear power facility (ies).

In order to assist the NRC in evaluating the value/ impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report (s) required by the Bulletin. Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the Bulletin.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely,

% a k

h -

James P. O'Reilly Directer

Enclosures:

1.

IE Bulletin No. 80-20 2.

List of Recently Issued IE Bulletins cc w/ encl:

M. Hanry, Plant Manager C. E. Belflower, Site QA Supervisor W. A. Widner, Vice President and General Manager-;;uclear Generation K. M. Gillespie, Construction Project Manager E. D. Groover, QA Site Supervisor D. E. Dutton, Project General Manager 8 0 0 8140 STS--

G

e SSINS No.: 6820 UNITED STATES Accession No.:

NUCLEAR REGULATORY COMMISSION P,006190023 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 July 31, 1980 IE Bulletin No. 80-20 FAILURES OF WESTINGHOUSE TYPE W-2 SPRINC RETURN TO NEUTRAL CONTROL SWITCHES By letter dated June 18, 1980, Commonwealth Edison Company submitted Licensee Event Report No. LER 50-295/80-24 to the NRC describing a malfunction of a Westinghouse Type W-2 control switch at the Zion Generating Station, Unit 1.

The malfunctioning switch is a three position spring return to neutral switch.

Although the switch was in its proper neutral position when it malfunctioned, its neutral contacts failed to close properly thereby preventing the automatic start of IA Service Water Pump.

Subsequent tests conducted on the malfunctioning switch revealed that contact closure was intermittent with the switch in the neutral (or " Auto Start")

position. Other tests conducted on identical switches from spares and from Unit 2 equipment disclosed two additional switches with a tendency for inter-mittent contact closure.

A review of this matter by Westinghouse led to the issuance of NSD Technical Bulletin No. NSD-TB-80-9 to the utility owners of all Westinghouse operating plants. The recommendations contained in the Westinghouse technical bulletin include: (i) testing the neutral position contacts of the subject W-2 switches for continuity, and (ii) rewiring of the indicating light circuit to permit the early detection of a neutral contact failure as shown in Figure 1.

Depending on how the indicating light circuit is wired, loss of continuity thru the neutral position contact of a W-2 switch could remain undetected until the equipment asso:iated with the switch were called upon to operate.

Since such a failure would be equivalent to by-passing the system associated with the switch, consideration should be given to rewiring the switches used in safety-related applications as shown in Figure 1.

Such rewiring would provide an acceptable means for detectiGq contact failure, provided the indicating light is in the control room and readily visible by the operator.

If the indicating light is not so located, consideration should be given to annunciating the neutral position contact failures at the control room to alert the operator of the inoperable status of a safety-related system.

In addition, consideration should be given to adding redundant contacts to the W-2 switches or to replacing the W-2 switches with others having a more posi-tive contact wiping action.

ACTIONS TO BE TAKEN BY LICENSEES AND HOLDERS OF CONSTRUCTION PERMITS:

1.

Determine whether Westinghouse Type W-2 control switches with spring return to neutral position are used in safety-related applications at your facility.

If so, identify the safety-related systems using these

~..

IE Bulletin No. 80-20 July 31, 1980 Page 2 of 2 switches and the total number of switches so used.

If no such switches are used in your facility, you should indicate that this is the case and ignore the remaining questions.

2.

Licensees of operating plants using Type W-2 spring return to neutral control switches in safety-related applications shall perform continuity tests on all such switches. These tests shall be performed with the switch operator in the neutral position and completed within ten (10)

' days of the date of this bulletin.

In addition, this continuity test shall be repeated at least every thirty-oae (31) days after the initial test and after each manipulation of the switch from its neutral position.

These continuity tests may be discontinue 6 subsequent to implementing the longer term corrective measures described below.

3.

Licensees of operating plants and holders of construction permits shall describe the longer term corrective measures planned and the date by which such measures will be implemented by actual installation or by design change, as appropriate. As a minimum, the longer term corrective measures should include rewiring the indicating light as shown in Figure 1 provided the light is readily visible to the control room operator.

If not, failures of the neutral position contacts should be annunicated in the control room.

A report addressing the above matters, including the number of failures detected during the first series of testr and the safety-related systems involved, shall be submitted to the director of the appropriate NRC regional office within forty-five (45) days of the date of this bulletin. A copy of the report shall be forwarded to the Director, Division of Reactor Operations Inspection, Office of Inspection and Enforcement, Nuclear Regulatory Commission, Washington, D. C. 20555.

Approved by GAO, B180225 (R0072); clearance expirer 7/31/80. Approval was given under a blanket clearance specifically for identified generic problems.

Enclosure:

Figure 1

-c....; a ;,....

.c.. :.,..... c.,.: e,' -., -

...;g..- : - ::

f

- EXISTING INDICATING LIGHT CIRCUIT (TYoltt.L)

NEUTRt.L 4

SWITCH CONTACT N"

IN:>IC AT ;NG LIGHT v.....-..

.,r

...,g,,; y.. e

,,-3,.

.,;. w,,.

% /

%/

,s

%/

%f

/

SAFETY

-(-)

==.

SIGNAL

(+)

PR OPO S E D REWIRIN G,0 F,. I t(DI C6TMiG..L:.G.ig....c..I..nt.C.u..r.,i,,,(- i.P..I. CA.L',.....-- r.

NEUTRAL SWCTCH

=[

CONTACT 7 f

"f31 CATI-G LIGHT ok

%/

%f N/

%f

<P l

... S & E EIY.,..........,;..,....r.;. c., ~,Q-.-

v......

=

- S;GNAL

%/

%/

mm C+)

.)

FIGURE 1 REWIRING OF INDICATING LIGHT CI'4CUIT Or W-2 si.!?C4ES A$ 'RECOMENDED BY WESTINGh0USE TEC:iNICAL B' LETIN :f!D-TB-60-9 s

    • -.s..

y-

.f

,...,,, u n,,;

.w.w ;.;; ww am-r -

P y

g.-----

c.

--ys-y-,%,9-.y----.e,,,.p-,c--

y, y

.--.-v-..--w-ye----------m-w

-** - -. - - -g

-w g-,w, w

+sc--,

-em'-Yev'=.--N

k IE Bulletin No. 80-20 Enclosure July 31, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued

' Issued To No.

80-19 Failures of Mercury-7/31/80 All nuclear power Wetted Matrix Relays in facilities having Reactor Protective Systems either an OL or a CP of Operating Nuclear Power Plants Designed by Combus-tion Engineering 80-18 Maintenance of Adequate 7/24/80 All PWR power reactor Minimum Flow Thru Centrifugal facilities holding OLs Charging Pumps Following and to those PWRs Secondary Side High Energy naaring licensing Line Rupture Supplement 2 Failures Revealed by 7/22/80 All BWR power reactor to 80-17 Testing Subsequent to facilities holding OLs Failure of Control Rods to Insert During a Scram at a BWR Supplement 1

, Failure of Control Rods 7/18/80 All BWR power reactor to 80-17 to Insert During a Scram facilities holding OLs at a BWR 80-17 Failure of Control Rods 7/3/80 All BWR power reactor to Insert During a Scram facilities holding OLs at a BWR l

l 80-16 Potential Misapplication of 6/27/80 All Power Reactor Rosemount Inc., Models 1151 Facilities with an i

and 1152 Pressure Transmitters OL or a CP l

with Either "A" or "D" Output Codes 80-15 Possible Loss Of Hotline 6/18/80 All nuclear facilities With Loss Of Off-Site Power holding OLs t

80-14 Degradation of Scram 6/12/80 All BWR's with an Discharge Volume Capability OL 80-13 Cracking In Core Spray 5/12/80 All BWR's with an Spargers OL 80 Decay Heat Removal System 5/9/80 Each PWR with an OL Operability t

-