ML19331B853

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Rept 50-412/80-04
ML19331B853
Person / Time
Site: Beaver Valley
Issue date: 07/25/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
Shared Package
ML19331B854 List:
References
NUDOCS 8008130417
Download: ML19331B853 (1)


See also: IR 05000412/1980004

Text

4-

'*

74

.

,

@*

'

UNITED STATES

y -

%

NUCLEAR REGULATORY COMMisslON

h

j

REGIONI

u

t

$31 PAHK AVENUE

.[

KING OF PRUSSI A. PENNSYLV ANI A 19406

-

.a n a

.

Docket No. 50-412

Duquesne Light Company

ATTN: Mr. E. J. Woolever

Vice President

435 Sixth Avenue

Pittsburgh, Pennsylvania 15219

Gentlenen:

Subject:

Inspection 50-412/80-04

This refers to your letter dated June 25, 1980, in response to our letter dated

May 27,1980.

Thank you for informing us of the corrective and preventive actions documented

in your letter.

These actions will be examined during a subsequent inspection

of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

/

-

Ro ert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

cc:

R. J. Washabaugh, Quality Assurance Manager

I

so08130dll7

J

.

D

.

L

Anan

(412) 471-4300

435 Sixth Avenue

Pittsburgh, Pennsylvania

15219

June 25, 1980

United States Nuclear Regulatory Commission

Region I

631 Park Avenue

King of Prussia, PA

19406

ATTENTION:

Mr. Robert T. Carlson, Chief

Facility Construction and Engineering Support Branch

SUBJECT:

Beaver Valley Power Station Unit No. 2

Docket No. 50-412

USNRC IE Inspection Report No. 50-412/80-04

Gentlemen:

This is in response to the item of infraction cited in

Inspection Report No. 50-412/80-04 and listed in Appendix A

(Notice of Violation) attached to your letter to

Mr.

E.

J. Woolever dated May 27, 1980.

NRC VIOLATION

10 CFR 50, Appendix B,

Criterion IX, states, in part,

that "... special processes, including... nondestructive

testing are controlled and accomplished...in accordance

with applicable. codes...."

The Beaver Valley Power Station PSAR, Section 17,

paragraph 17.2.1.9A, also states, in part, that:

... nondestructive testing (be) controlled and

"

accomplished...in accordance with applicable codes...."

The Specification 2BVS-920, Field Fabrication and

Erection of Piping, ASME III Class 1, 2, and 3, requires

that:

...These code class 1, 2, and 3 piping systems

"

shall be designed, fabricated, installed, tested, and

inspected in accordance with ASME IIT (107'

'#'

'

'

~

2

~_ -.

--

1

{

DUPLICATE DOCUMENT

]

4

Entire document previously

,

.

4

entered into system under.

.

ANO __

I

No. of Pages:

pp

g

l_

.

'T

-

>

-

-

. .

..