Discusses Insp on 720907 Re Const Shutdown Maint Activities at Facility
ML19331A323
Person / Time
Site: Midland
Issue date: 09/15/1972
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Youngdahl R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19331A315 List:
References
NUDOCS 8007160900
Download: ML19331A323 (2)


Text

1 DR Crntrnl Films O

s to f

UNITED STATES g

'e j.j ATOMIC ENERGY COMMISSION g

f DIRECTORATE OF REGULATORY OPERATIONS h

G C

HEGION lil

' \\

4,'il 799 ROOSEVELT ROAD GLEN ELLYN. ILLINO!S So137 (3113ese-asse September 15, 1972 Consumers Power Company Docket No. 50-329 ATTN: Russell C. Youngdahl Docket No. 50-330 Senior Vice President 212 West Michigan Avenue Jackson, Michigan 49201 i

Gentlemen:

This refers to the inspection conducted by Messrs. Erb and Oller of this office on September 7, 1972, of construction shutdown maintenance activities at the Midland site and to che discussion of our findings at the conclusion of the inspection with Messrs.

C. Q. Hil,ls and B. H. Peck of your staff. Areas examined during the inspection included site activity logbooks, drainage of site structures, fire protection, and storage protection relative to Class I structures, systems, and components. Within these areas, the inspection consisted of selective examination of procedures and representative records, and observations by the inspectors.

With regard to questions raised during this inspection, we under-stand that you intend 'o: (1) winterize the Class I concrete t

foundations at the site, /.2) assure that the heat tracing system for the fire protection system is operable, (3) assure that Class I material is stored so that ground contact will be avoided, and (4) rewrap Cadweld connectors, using an improved wrapping material, wherever the present. wrapping has deteriorated. We will examine your action on these matters during our next routine inspection.-

During this inspection, the inspectors indicated a need for (1) an updated quality assurance manual, (2) a listing of Class I compo-nents and equipment for the P!dland Unit 1 and Unit 2 facilities, t

and (3) a copy of the latest Bechtel reports dealing with corrosion of materials stored outdoors. We request that you forward this material at your earliest convenience.

Since our use of this material is only to facilitate our inspection efforts, it will not be placed in the Public Document Room and will be returned to you t

when it has served its purpose.

O 8007160fpO

.-m,,,,,

,------,-,----------n--

--,---,---n,a-,-,,--

,,,,- - +

a -

-,,n,w-n -n.e,

,-,.,,,-,,,,,n,


,,..,-,ww

O Constancrs Power Company September 15, 1972 U

No reply to this lotter is necessary; however, should you have questions concerning this inspection, we will be glad to discuss the:r. with you.

Sincorely yours, Boyce H. Crier Regional Director cc:

C. Q. Hillo, Quality Assurance Enginaer B. H. Peck, Quality Control Supervisor N. G Paigc, Project Superintendent g

i Midland 1 and 2 bec: J. B. Henderson, RO H. D. Thornburg, RO g

R. H. Engelken, RO

~

G. W. Reinmuth, RO P. A. Morris, RO A. Giambusso, L RO F.iles DR Central Files PDR Local PDR NSIC DTIE I

l l

.4

' " ~ ~ ~ ' ' * " ' ~ ~ ~ ' ' ' ' ' ' ' '