Text

.

7 42

.,

o

UNITED STATES

.

8

3.

NUCLEAR REGULATORY COMMISSION

$

E

REGION 11

0

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

g

-3 1980

In Reply Refer To:

RII:MDH

50-424/80-10

50-425/80-10

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This . refers to the inspection conducted by M. D. Hunt of this office on

June 10-12, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Vogtle facility, and to the discussion of our

findings held with K. M. Gillespie at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are_ discussed in the enclosed inspection report.

During the inspection ii. was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

Corrective actions to prevent recurrence were completed prior to

tha conclusion of this inspection; therefore, a reply is not requested.

In accordance with Section 2,790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter aad the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the .information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

8008080ld

Q-

r

m

i :.

'

' Georgia' Power Company,

-2-

JUL

2 bb

'

Should you have,any questions'concerning this letter, we will oe glad to discuss

them with' you.

~

Sincerely,

.

<

s

es

C. E. Mu

1 -

,

Reactor' Construction and Engineering

Support Branch

En: osures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-424/80-10

and 50-425/80-10

cc w/ encl:

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

W. A.'Widner, Vice President and

.

General Manager-Nuclear Generation