Text
.
.
.
O/
o
UNITED STATES
V!
NUCLEAR REGULATORY COMMISSION
n
$
E
REGION 11
e
101 MARIETTA ST
N.W.. SUITE 3100
ATLANTA, GEORGIA 30303
4....
1 Reply Refer To:
RII:DJP
50-321/80-19
50-366/80-19
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by D. J. Perrotti of this office on
April 21 through 25, 1980 of activities authorized by NRC Operating License No.
DPR-57 and License No. NPF-5 for the Hatch facility, and to the discussion of
4.ar findings held with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any Saformation that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
nation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
80071? O 2(,2
l
,__ _
_
_.
.___.
.
.
.
MAY 121980
Georgia Power Company
-2-
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
/
J. Philip
obr, C ief
Fuel Facility and Materials
Safety Branch
,
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/80-19
and 50-366/80-19
cc w/ enc 1:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, J'
31513
W.' A. Widner
Vice President and General Manager
Nuclear Generation
Georgia Power Company
Post Office Box 4545
Atlanta, GA 30303
'
.
h4