Forwards Insp Rept 50-346/74-04 on 740604-05.Noncompliance Noted
ML19329B200
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/25/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19329B201 List:
References
NUDOCS 8001310552
Download: ML19329B200 (2)


See also: IR 05000346/1974004

Text

-

-

Y

. d .:. '

'

,

-

,

'

,,anov c

-

')

q%

UNITED STATES

a

.

ki

ATOMIC ENERGY COMMISSION

, <

N .f.'

  • k'o

-

T

DIRECTORATE OF REGULATORY OPERATIONS

-

REGION lit

S C' /

%

799 ROOSEVELT ROAD

ggg,3y,,apag

GLEN ELLYN. ILLINCIS 6o137

Oln ass-asse

.

,.

.

JUN 2 5 1974

_ . .

'

.

,

,

<

-

.,

Toledo Edison Company

Docket No. 50-346

,

ATTN

Mr. Lowell E. Roe

.

Vice President Power

,

Edison Plaza

~

,

300 Madison Avenue

Toledo, Ohio

43652

'

Gentlemen:

-

-

, This refers to the inspection conducted by Messrs. Dickerson and Sutton of

this office on June 14-15, 1974 of activities at the Davis-Besse Construction

site authorized by AEC Construction Permit License No. CPPR-80 and to the

discussion of our findings with Messrs. Novak, Leanardson and others of your

staff at the conclusion of the inspection.

.

.

A copy of our report of this inspection is enclosed and identifies the

O

areas examined during the inspection. Within these areas, the inspection

consisted of a selective av==4n= tion of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

During this inspection, it was found that certain of your activities appear

to be in violation of AEC requirements. The item and reference to the

pertinent requirements are listed under Enforcement Action in the Summary

of Findings Section of the enclosed inspection report.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of

your receipt of this notice, a written statement or explanation in reply,

including:

(1) corrective steps which have been taken by you, and the

results achieved; (2) corrective steps which will be taken to avoid further

violations; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this notice, the enclosed

inspection reporr, and your response to this notice vill be placed in the

.

AEC's Public Document Room. If this report contains any information that

'

you or your contractors believe to be proprietary, it is necessary that you

PDR //

.

'

D0FY SENT TO:

LPC W

O

T

'

NSIC

'

(.

TIC

. d,

'

l

_

l

8001

,

C

L

-

-

e

.

.

,

.

JUN 2 5 1974

O.

'

Toledo Edison Company

-2-

make a written application to this office, within twenty days of your receipt

. . . - . . .

of this notice, to withhold such information from public disclosure. Any

such application must include a full statement of the reasons for which it

is claimed that the information is proprietary, and should be prepared so

'

the proprietary information identified in the application is contained in

a separate part of the document. Unless we receive an application to withhold

information or are otherwise contacted within the specified ti=e period, the

written material identified in this paragraph will be placed in the Publie

,

'

Document Room.

-

Should you have any questions concerning this inspection, we will be glad

tg discuss them with you.

.

7

'

-

. Sincerely yours,

.

.

.

,

t

'

+

'

James G. Keppler

.

^

-

Regional Director

.

..

.

Enelnsures

RO Inspection Rpt No.

-

050-346/74-04

bec: RO Chief, FS&EB

,.,..,

RO:HQ (4)

,

.- m .- x

Licensing (4)

DR Central Files

RO Files

PDR

,

'

Local PDR

.

NSIC

'

DTIE

.

k

'o

I

l

%

O

I

_

_ . _ _

-

.

- _ .

I