ML19329B200
| ML19329B200 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/25/1974 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19329B201 | List: |
| References | |
| NUDOCS 8001310552 | |
| Download: ML19329B200 (2) | |
See also: IR 05000346/1974004
Text
-
-
Y
. d .:. '
'
,
-
,
'
,,anov c
-
')
q%
UNITED STATES
a
.
ki
ATOMIC ENERGY COMMISSION
, <
N .f.'
- k'o
-
T
DIRECTORATE OF REGULATORY OPERATIONS
-
REGION lit
S C' /
%
799 ROOSEVELT ROAD
ggg,3y,,apag
GLEN ELLYN. ILLINCIS 6o137
Oln ass-asse
.
,.
.
JUN 2 5 1974
_ . .
'
.
,
,
- <
-
.,
Toledo Edison Company
Docket No. 50-346
,
ATTN
Mr. Lowell E. Roe
.
Vice President Power
,
Edison Plaza
~
,
300 Madison Avenue
Toledo, Ohio
43652
'
Gentlemen:
-
-
, This refers to the inspection conducted by Messrs. Dickerson and Sutton of
this office on June 14-15, 1974 of activities at the Davis-Besse Construction
site authorized by AEC Construction Permit License No. CPPR-80 and to the
discussion of our findings with Messrs. Novak, Leanardson and others of your
staff at the conclusion of the inspection.
.
.
A copy of our report of this inspection is enclosed and identifies the
O
areas examined during the inspection. Within these areas, the inspection
consisted of a selective av==4n= tion of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
During this inspection, it was found that certain of your activities appear
to be in violation of AEC requirements. The item and reference to the
pertinent requirements are listed under Enforcement Action in the Summary
of Findings Section of the enclosed inspection report.
This notice is sent to you pursuant to the provisions of Section 2.201 of
the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within thirty days of
your receipt of this notice, a written statement or explanation in reply,
including:
(1) corrective steps which have been taken by you, and the
results achieved; (2) corrective steps which will be taken to avoid further
violations; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this notice, the enclosed
inspection reporr, and your response to this notice vill be placed in the
.
AEC's Public Document Room. If this report contains any information that
'
you or your contractors believe to be proprietary, it is necessary that you
PDR //
.
'
D0FY SENT TO:
LPC W
O
T
'
'
(.
. d,
'
l
_
l
8001
,
C
L
-
-
e
.
.
,
.
JUN 2 5 1974
O.
'
Toledo Edison Company
-2-
make a written application to this office, within twenty days of your receipt
. . . - . . .
of this notice, to withhold such information from public disclosure. Any
such application must include a full statement of the reasons for which it
is claimed that the information is proprietary, and should be prepared so
'
the proprietary information identified in the application is contained in
a separate part of the document. Unless we receive an application to withhold
information or are otherwise contacted within the specified ti=e period, the
written material identified in this paragraph will be placed in the Publie
,
'
Document Room.
-
Should you have any questions concerning this inspection, we will be glad
tg discuss them with you.
.
7
'
-
. Sincerely yours,
.
.
.
,
t
'
+
'
James G. Keppler
.
^
-
Regional Director
.
..
.
Enelnsures
RO Inspection Rpt No.
-
050-346/74-04
bec: RO Chief, FS&EB
,.,..,
RO:HQ (4)
,
.- m .- x
Licensing (4)
DR Central Files
RO Files
,
'
Local PDR
.
'
DTIE
.
k
'o
I
l
%
O
I
_
_ . _ _
-
.
- _ .
I