ML19329B145

From kanterella
Jump to navigation Jump to search
Responds to AEC 730430 Request to Review Facility Control Circuits & Procedures of safety-related Equipment.Disabling One Control Circuit Component Does Not Render Others Inoperable
Date released: 12/09/2019 Download: ML19329B145


Ro:On 720925,two Pumps at Oyster Creek in Standby Liquid Control Sys Simultaneously Inoperable.Caused by Interlock in Starting Circuitry Preventing One Pump from Starting When Other Is racked-out.Operating Procedures Changed
ML19329B156
Person / Time
Site: Oyster Creek
Issue date: 10/06/1972
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To:
References
Download: ML19329B156 (2)
Ro:On 720411,Oyster Creek Reactor Bldg Ventilation Sys Supply Dampers Failed to Close During Surveillance Test & Secondary Containment Integrity Not Maintained.Caused by racked-out Supply Fan Supply Breaker
ML19329B155
Person / Time
Site: Oyster Creek
Issue date: 04/20/1972
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To:
References
Download: ML19329B155 (2)
Responds to AEC 730430 Request to Review Facility Control Circuits & Procedures of safety-related Equipment.Disabling One Control Circuit Component Does Not Render Others Inoperable
ML19329B144
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/27/1973
From: Sampson G
TOLEDO EDISON CO.
To: SCHWENCER A
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML19329B144 (1)