ML19329A933

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing AEC of Steps Taken to Correct Violations Noted in Insp Rept 50-346/72-06
ML19329A933
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/14/1973
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sampson G
TOLEDO EDISON CO.
Shared Package
ML19329A934 List:
References
NUDOCS 8001270070
Download: ML19329A933 (2)


See also: IR 05000346/1972006

Text

a

%

"A

P

UNITED STATES

e

ATOMIC ENERGY COMMISSION

1 .

,

$

T

DIRECTORATE OF REGULATORY OPERATIONS

M#p

o \\

%

REGION 111

N s o'

799 ROOSEVELT ROAD

t

mpg

GLEN ELLYN, ILLINOIS 60137

(312) 858-2660

March 14, 1973

Toledo Edison Company

Docket No. 50-346

ATTN

Mr. Glenn J. Sampson

Vice President, Power

Edison Plaza

300 Madison

Toledo, Ohio

43652

t

Gentlemen

Thank you for your letter dated March 2, 1973, informing us of the steps

you have taken to correct the items of noncompliance which we brought to

your attention in our letter dated January 10, 1973. We will examine

these matters during our next inspection.

A copy of RO Inspection Report No. 050-346/72-OfL referenced in our letter

of January 10 is enclosed. In accfardance with Section 2.790 of the ABC's

" Rules of Practice," Part 2, Title 10, Code of Pederal Regulations, a copy

of this letter, our letter of January 10, your letter of March 2, and the

enclosed inspection report will be placed in the AEC's Public Doctssent

Room. If the inspection report contains information which you or your

contractors believe to be proprietary, it is necessary that you submit a

written application to this office, within 20 days of the date of this

letter, requesting that such information be withheld from public disclosure.

If such an application is submitted, it must identify the basis for which

information is claimed to be proprietary. The applicatios. should be

prepared so that proprietary information identified is contained in a

separate part of the application, since the application will also be

placed in the Public Document Room. If we do not receive an application

to withhold information, or are not otherwise contacted within the specified

time period, the enclosed report and the previously identified letters will

be placed in the Public Document Room.

<9

s

eco,noo70

,

-____ _ -- _

.

..

-

Toledo Edison Company

-2-

March 14, 1973

-

Unlesa you wish to make application to withhold information, no reply to

this letter is necessary; however, should you have questions concerning

the enclosed inspection report, we vill be glad to discuss them with you.

Sincerely yours,

Boyce H. Grier

Regional Director

Enclosure

RO Inspection Rpt No. 050-346/72-06

bec w/ltr dtd 3-2-73:

R0 Chief, CB

RO:HQ (4)

Licensing (4)

DR Central Files

Regions I & II

PDR

Local PDR

NSIC

DTIE

lO

.

_

.

_

. , _ .

--

. , . .

.-

, . _ .

. - - ,