Concurs W/Results & Conclusions Presented in Encl Technical Evaluation Repts Transmitted on 890505 & 0724 & Consisting of Dcrdr,Supplemental Summary Rept & Dcrdr Program Plan,Rev 2
ML19327B769
Person / Time
Site: Pilgrim
Issue date: 11/06/1989
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Bird R
BOSTON EDISON CO.
Shared Package
ML19327B674 List:
References
TAC-59329, NUDOCS 8911130169
Download: ML19327B769 (2)


Text

m n

[

November 6,1989

'l Docket No. 50-293 l'

Mr. Ralph G. Bird Senior Vice President - Nuclear i

Boston Edison Company Pilgrim Nuclear Power Station

.l l

RFD#1, Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Bird:

SUBJECT:

DETAILED CONTROL ROOM DESIGN REVIEW StlPPLEMENTAL SLMMARY REPORT m r 1

AND PROGRAM PLAN, REVISIGN 2 r_

REFERENCE:

TAC Wumber 59329 By letters dated May 5 and July 24, 1089, You provided a Detailed Control Room L

Design Review (DCRDR), Supplementary Summary Report (April 1989) an( the DCRDR j

r Program Plan, Revision 2 (July 1989), respectively. The staff, with contract assistance from Science Applications International Corporation ( W C) has reviewed the Program Plan and Supolemental Sumary Report, with ct. tails of each review contained in contractor technical evaluation reports MERs). The staff agrees with the.restilts and conclusions presented in the TERs which are F

' enclosed for your information, i

in a further effort to ensure mutual understanding of the requirements for a successful DCRDR, a conference call was held with members of your staff.

Coments on your revised Program Plan were provided and are reflected in the enclosed TERs. The DCRDR should be successful'if the methodology described in I

the revised Program Plan is followed; the comitments in the Supplementary i

Sumary Report are mett and the items identified in the enclosed TERs, including the April 26, 1989 in-progress aud{t report, are addressed.

j You have indicated that the Final DCRDR Sumary Report will-be provided by November 30, 1990.

i

.t Sincerely, j

Original signed by:

1 i

Daniel G.' Mcdonald, Senior Project Manager j

Project Directorate 1-3 Division of Reactor Projects I/II

Enclosures:

1 As stated l

cc: W. kegan, HFAB J. Bongara, HFAB cc w/ enc 1. See next page j

DISTRIBllTION: PDI-3 r/fU techet1F.C NPC& Local PDRs, MRushbrook, DMcDonald, f

RWessman,ACR$(10), ErimesT TJordan, 1 Johnson, Fan.1, SYarga, Bkoger r

1 PD

{A M

RWe]ssman Df0f PD1 R

MR br60k

.cDonald:mw 11/y/89 11/do/89 11/6 /89 i

8911130169 891106 l

DR ADOCK O 3

mr-,

j Mr.' Ralph G. Bird i

cc:

Mr. K. L. Highfill Mr. Richard N. Swanson, Manager Vice President of Operations /

Nuclear Engineering Department Station Station Boston Edison ComoanY l

Pilcrim Nuclear Power Station EE Braintree Hill Park i

RFD #1 Rocky Hili Road Praintree, Massachusetts 02184 plymouth, Massachusetts 02360 O!$Peclerugiatory Comission DuciD'i(2rm:9.Un'aanager Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station i

Post Office Cox 867 RFD #1, Rocky Hill Road i

Plymouth, Massachusetts 0?360 Plymouth, Massachusetts 0?360 Chairinan, Board of Selectmen Mr. Char 1es V. Barry i

11 Lincoln Street Secretary of Public Safety Plymouth, Massachusetts 02360 Frecutive Office of Public Safety One Ashburton Pla:e Office of the Comissioner Boston, Massachusetts 02108 Massachusetts Department of 2

Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General One Ashburton Place 20th Floor Ro.ston, Wassachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, Massachusetts 02111 Regional Administrdtor, Region i U. 5, Nuclear Regulatory Comission 475 A11enoale Road rino of Prussia, Pennsylvania 10406 Mr. John Dietrich Licensing Division Manager poston Edison Company 25 Braintree Hill Park Braintree, Massachusetts 02184 p