ML19327B460
| ML19327B460 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 10/12/1989 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Larson C NORTHERN STATES POWER CO. |
| Shared Package | |
| ML19327B461 | List: |
| References | |
| NUDOCS 8910310236 | |
| Download: ML19327B460 (2) | |
See also: IR 05000282/1989023
Text
fd). ;o.
~
b0 # j
.
7. .
yn y .
,
s
w;7
u
>
,
. y.
,
.e
I
ty,
+
.:
wa
.
OCT 121989
I\\
-
O
.
vi
>
L
Docket No. 50-282
.
l Docket:No. 50-306.
g
-Northern States Power Company-
+
K
' ATTN:. Mr. C. E. Larson
[
LVice President, Nuclear
F
Generation
f
414 Nicollet Mall
Minneapolis, MN 55401
.
L~
-Gentlemen:
4
,
~
L
This refers to the routine safety inspection conducted by Messrs.
,;
"
P. L. Hartmann, J.D. , J. E. Hard, and T. J. O'Connor of this of fice on.
b
August 13 through September 25, 1989, of activities at the Prairie Island
i
Nuclear Generating Plant, Units 1 and 2,.~ authorized.by NRC Operating Licenses:
'
No' DPR-42 and No. OPR-60, and to. the discussion of our findings with
.
Mr'. E. L.' Watz1 and other members of your staff at the conclusion of the
-inspection.
The. enclosed copy'of our inspection report identifies areas examined during
the. inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
s
interviews with personnel.
During this inspection, certain of your activities appeared to be in vio!ation
of-NRC requirements, as described in the enclosed notice. A written response
is required.
In accordance with 10 CFR 2.790(a) of the Commission's regulations, a copy of
this letter and the enclosure (s) will be placed in the NRC Public Document
Room.
E
'
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
L
L
l
lb
h $5$0$$op p@
m
i t
350/
-
--
( 9,
- ..
'
,t
5-
OCT 121989
,
q
.Northe'rn: States Power Company
2
h,
'
..
' We will-gladly discuss any questions you have concerning this inspection,
_
i
Sincerely,
vaiginal nigned bz L La Anlcon"
'
,
t
-
L
.
j '.
W. L. Axelson, Chief
^'
Reactor Projects Branch 2
P
' Enclosures:
1.
f
2.
Inspection Reports
No. 50-282/89023(DRP);
'
"
.
!;'
No. 50-306/89023(DRP)
cc w/er. closures:
E. L. Watzl, Plant Manager
, ,
DCD/DCB(RIDS)
Licensing Fee Management Branch
Resident Inspector,' RIII Prairie
. Island
Resident Inspector, RIII Monticello
t
John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA
State Liaison Officer,-State
of Minnesota-
(
D. Dilanni, NRR
.
l:
>
,
l
RIII
RIII
L
B
ss/cs
A Ikon
'
.
p~
.-
-
-
.