Lists Actions Needed to Be Taken Re Review of 890511 Differing Prof View,Including Issuance of Evaluation of Zion Tech Specs
ML19327A693
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/13/1989
From: Murley T
Office of Nuclear Reactor Regulation
To: Licciardo R
Office of Nuclear Reactor Regulation
Shared Package
ML19327A642 List:
References
TAC-73427, NUDOCS 8910100052
Download: ML19327A693 (1)


Text

,,

7 t

?

u:

UNITED STATES g

NUCLEAR REGULATORY COMMISSION

,I f'

WASHINGTON. D. C. 20586 n

h i

'%,.....J SEP I8,1SS9 MEMORANDUM FDP.:. Robert 8.A.Licciardo,ReactorEngineer(Nuclear)

Plant Systems Branch Division of Systems Technology R

FROM:

Thomas E. Murley, Director Office of Nuclear Reactor Regulation K

SUBJECT:

DIFFERINGPROFESSIONALVIEW(DPV)

References:

1.

Memorandum,.Licciardo to Murley, dtd May 11, 1989 2.

Memorandum Murley to Miraglia, et al, dtd May 26, 1989 3.

Memorandum and Raport from DPV Standing Review Pane) to Murley dtd August 31,1989 On May 11,1989 (Reference 1). you sent me a Differing Professional View regarding containment isolation valves (42' purge supply and exhaust valves) at Zion. ' Pursuant to NRC Manual Chapter 4125, and NRR Office Letter No. 300, I established a Panel to review your Differing Professional View and make

,recessendations to me regarding appropriate disposition of your concerns (Reference 2).

I have reviewed the Panel's report and have discussed these issues with you in a meeting in sy office on September 8,1989. Based on ey review of the Panel's report and on our discussions, I have cencluded that the following actions should be taken:

1.

The staff should issue its evaluation of the proposed Zion Technical Specifications. (Actien--Projects A/D for Region III & V Reactors) 2.

The staff should ensure that pressure and temperature effects during a LOCA are considered in the review of new and advanced fuel designs.

(Action--Reactor Systems Branch) 3.

The staff should revise the Standard Review Plan to clarify the relation-ship between DN8R and fuel failure. Such clarifications may be made during the nomal SRP update process.. (Action--Inspection and Licensing ProgramBranch) l

.T k Thomas E. Murley, Director Office of Nuclear Reactor Regulation 1

Enclosure:

Memorandum and Report from Panel dtd 8/31/89 cc: FF. Miraglia

' F. Gillespie

_ J. Partlow. _ _ _

x

.:. -== =2.r= =

[

]

SEP 1313pg l

MEMORANDUM FOR: Robert 8.A.Licciardo,ReactorEngineer(Nuclear)

Plant Systems Branch Division of Systems Tachnology i

FROM:

Thomas E. Murley, Director i

Office of Nuclear Reactor Regulation l

$USJECT:

DIFFERlhGPROFES$10NALVIEW(DPV)

References:

1.

Memorandum, Licciardo to Mur3ey, di.d May 11, 1989 2.

Memorandum Murley to Miraglia, et al, dtd May 26, 1989 3.

Memorandum and Report from DPV Standing Review Panel to Murley dtd August 31, 1989 On May II,1989 (Reference 1), you sent me a Differing Professional View at Zion.g containment isolation valves (42" purge sunly and exhaust valves) regardin r

Pursuant to NRC Manual Chapter 4125, and N tt Office Letter No. 300, i

1 established a Panel to review your Differing Professional View and make l

recommendations to me regarding appropriate dLsposition of your concerns (Reference 2).

i; I have reviewed the Panel's report and have discussed these issues with you in

!l l

a meeting in any office on September 8,1989. Based on review of the Panel's jt report and on our discussions, I have concluded that th following actions e;

should be taken:

l I

1.

The staff should issue its evaluation of the proposed Zion Technical i'

specifications. (Action.. Projects. A/D for Region III & V Reactors) 2.

The staff should ensure that pressure and temperature effects during a l

LOCA are considered in the review of new and advanced fuel designs.

(Action-Reactor Systems Branch) 3.

The staff should revise the Standard Review Plan to clarify the relation.

ship between DN8R and fuel f ailure. Such clarifications may be made during the normal $RP vpdate process.

(Action..InspectionandLicensing ProgramBranch)

Oriainal afgaed bg l

Ibomas1.Marler gw "A l%-

Thomas E. Murley, Director en

'g Office of Nuclear Reactor Regulation

Enclosure:

Memorandum and Report from Panel dtd 8/31/89 cc:

F. Miraglia Distribution:

F. Gillespie TEMurley J. Partlow JH$niezek spD: R OUNL i

K.........:............:............:............:............:....~.---

..., s..

.E JHS ek

TEMurley

... :.--.- - :. g. -... - :..... ~.. ~. :... - -. -.. : ~... -.... : -.... - - - :. ~. - ~ ~ -

E 19/12/8

9/ W9 L/

OFFICIAL RECORD COPY

/