UNITED STATES
/y Recoq'o, NUCLEAR REGULATORY COMMISSION
[
REll!N I o
j 831 PARK AVENUE KING OF PRUS$1 A. PENNSYLV ANI A 19408 June 18, 1980 Docket Nos. 50-277 50-278 Ph:ladelphia Electric Company ATTN:
Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:
The enclosed IE Bulletin No. 80-15, "Possible loss of Emergency Notification System (ENS) With Loss of Off-Site Power," is forwarded to you for action.
A written response is required.
In order to assist the NRC in evaluating the value/ impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report (s) required by the Bulletin.
Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the Bulletin.
If you desire additional information regarding this matter, please contact this office.
Sincerely, H. Grier Director
Enclosures:
1.
List of Recently Issued IE Bulletins CONTACT:
Dr. C. O. Gallina (215-337-5350) cc w/encls:
W. T. Ullrich, Station Superintendent Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire Raymond L. Hovis, Esquire Michael J. Scibinico, II, Assistant Attorney General 8007020 ?O@-
g
UNITED STATES SSINS No.:
6820 NUCLEAR REGULATORY COMMISSION Accessions No.:
OFFICE OF INSPECTION AND ENFORCEMENT 8005050072 WASHINGTON, D.C.
20555 June 18, 1980 IE Bulletin No. 80-15 POSSIBLE LOSS OF EMERGENCY NOTIFICATION SYSTEM (ENS) WITH LOSS OF 0FFSITE POWER In the past year, there have been two occurrences where a loss of off-site power has resulted in a loss of communications between a power reactor facility and the NRC Operations Center via the Emergency Notification System (ENS).
The most recent occurrence was at Indian Point Unit 2 on June 3, 1980.
The earlier event occurred at the Davis Besse facility on October 15, 1979 and resulted in the issuance of IE Circular 80-09.
The installation of the ENS requires a station package which operates on 110 VAC.
In some cases, the station package is located at the local telephone company which supplies the required power for normal operation and emergency power for operation during abnormal occurrences, but in many cases, the package is located at the site and is served by on-site power.
In some cases where the station package is served by on-site power, the station package has not been backed up by emergency power.
NRC data indicate that the station packages are powered in the manner described in the enclosures.
Actions to be taken by all licensees:
1.
Within 10 days of the date of this Bulletin, determine by direct inspection,inconjunctionwiththea)propriatetelephonecompany representative, the manner in which tie ENS at your facility is powered.
2.
Those facilities which have station packages requiring on-site power, but which are not connected to a safeguards instrumentation bus which is backed up by batteries and an inverter or equally reliable power supply, shall make necessary modifications and provide such a connection.
3.
All facilities are to develop and conduct a test, within 60 days of the issuance of this Bulletin,ies) would remain fully operable to verify that all extensions of the ENS located at your facility (
from the facility (ies) to the NRC Operations Center in the event of a loss of offsite power to your facility (ies).
This is not intended to mean that an actual loss of offsite power be executed.
IE Bulletin No. 80-15 June 18, 1980 Page 2 of 2 4.
If it is determined that a station package requiring on-site power is not connected to a safeguards instrumentation bus backed up by automatic transfer to batteries and an inverter or an equally reliable power supply, notify the NRC Operations Center v.ia the ENS within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after such determination.
5.
Prepare and issue an administrative procedure or directive which requires notification to the NRC Operations Center by commercial telephone or relayed message within one hour of the time that one or more extensions of the ENS located at your facility (ies) is subsequently found to be inoperable for any reason.
6.
Provide a written report, within 75 days of the issuance of this Bu'letin, describing the result of the reviews required by items 1 and 2 above, ired the results of the testing required by item 3 and the procedures requ by item 5.
This information is requested under the provisions of 10 CFR 50.54(f).
Accordingly, you are requested to provide within the time pericds specified in item 6 above, wr'i. ten statements of the above information, signed under oath or affirmatica.
Reports shall be submitted to the Director of the appropriate NRC Regional Office and a copy forwarded to the Director, NRC Office of Inspection and Enforcement, Washington, D.C.
20555.
Approved by GAO, B180225 (R0072): clearance expires 7-31-80.
Approval was given under a blanket clearance specifically for identified generic problems.
Enclosures:
1.
Facilities With ENS Powered By Local Telephone Company 2.
Facilities With ENS Powered Using On-Site Power
Facilities With ENS Powered By Local Telephone Coinpany Region I B&W Leechburg/ Apollo Beaver Valley 1 Calvert Cliffs 1 & 2 Fitzpatrick Ginna Indian Point 2 Indian Point 3 Millstone 1 & 2 NFS-West Valley Nine Mile Point 1 Three Mile Island 1 & 2 TI-Attleboro Westinghouse Cheswick Region II Hatch 1 & 2 NFS-Erwin Region III Cook 1 & 2 Dresden 1, 2 s 3 Duane Arnold Kerr McGee Cresent La Crosse Monticello Palisades Point Beach 1 & 2 Quad Cities 1 & 2 Region V Exxon Richland General Atomics LaJolla Rockwell Canoga Park San Onofre Trojan
m Facilities With ENS Powered Using On-Site Power Region I Haddam Neck Maine Yankee Oyster Creek Peach Bottom 2 & 3 Pilgrim 1 Salem 1 & 2 UNC-Montville UNC-Wood River Junction Vermont Yankee Yankee Rowe Region II B&W LRC-Lynchburg B&W Navy-Lynchburg Browns Ferry 1, 2 & 3 Brunswick 1 & 2 Crystal River Farley 1 North Anna 1 & 2 Oconee 1, 2 & 3 Robinson 2 Sequoyah 1 St. Lucie 1 Surry 1 & 2 Turkey Point 3 & 4 Region III Big Rock Point Davis-Besse Kewaunee Prairie Island 1 & 2 Zion 1 & 2 Region IV Arkansas Nuclear One, 1 & 2 Cooper Fort Calhoun Fort St. Vrain Region V Diablo Canyon Rancho Seco
I IE Bulletin No. 80-15 June 18, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.
80-14 Degradation of Scram 6/12/80 All BWR's with an Discharge Volume Capability OL 80-13 Cracking In Core Spray 5/12/80 All BWR's with an Spargers OL 80-12 Decay Heat Removal System 5/9/80 Each PWR with an OL Operability 80-11 Masonry Wall Design 5/8/80 All power reactor facilities with an OL,exceptTrojan 80-10 Contamination of 5/6/80 All power reactor Nonradioactive System and facilities with an Resulting Potential for OL or CP Unmonitored, Uncontrolled Release to Environment 80-09 Hydramotor Actuator 4/17/80 All power reactor Deficiencies operating facilities and holders of power reactor construction permits 80-08 Examination of Containment 4/7/80 All power reactors with Liner Penetration Welds a CP and/or OL no later than April 7, 1980 80-07 BWR Jet Pump Assembly 4/4/80 All GE BWR-3 and Failure BWR-4 facilities with an OL 79-03A Longitudinal Weld Defects 4/4/80 All power reactor In ASME SA-312 Type 304 facilities with an Stainless Steel Pipe OL or CP 80-06 Engineered Safety Feature 3/13/80 All power reactor (ESF) Reset Controls facilities with an OL 80-05 Vacuum Condition Resulting 3/10/80 All PWR power reactor In Damage To Chemical Volume facilities holding Control System (CVCS) Holdup OLs and to those with Tanks a CP t