ML19326C578
| ML19326C578 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/27/1976 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19326C559 | List: |
| References | |
| NUDOCS 8004230689 | |
| Download: ML19326C578 (2) | |
See also: IR 05000313/1976006
Text
-
,-
.
bp '.
^
i
42&5==ii
.,
UNITED STATES
05,2l-
' gg
NUCLEAR REGULATORY CoMMISSloN
iE
me:
(,)
OFFICE OF INSPECTION ANo ENFORCEMENT
h
n-
REGloN IV
' ' ' -
611 RYAN PLAZA oRIVE, SUITE 1000
ARLINGTON, TEXAS 76012
April 27, 1976
g_
==
_
Arkansas Power and Light Company
Docket No. 5J-313 _
hma
ATTN:
Mr. J. D. Phillips
a
Senior Vice President
'
"
Sixth and Pine Streets
Pine Bluff, Arkansas 71601
j...
Gentlemen:
This refers to the inspection conducted by Messrs D. G. Anderson and
J. E. Gagliardo of this office on April 20-22, 1976, of activities
authorized by NRC Operating License No. DPR-51 for the Arkansas
Nuclear One, Unit 1 facility, and to the discussion of our findings
held with Mr. J. W. Anderson and other members of your staff at the
conclusion of the inspection.
I
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas,.the inspection
consisted'of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
During this inspection it was found that certain of your activities
were not conducted in full compliance with URC. requirements, as set
'
forth in the Notice of Violation, enclosed herewith as Enclosure (1).
This notice is sent to you pursuant to the provisions of Section 2.201
~
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal .
-
Regulations.
Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or
explanation in. reply including:
(1) corrective steps which have been
taken by you, and the results achieved; (2) corrective steps which will-
H
be taken to avoid further noncompliance; and (3) the date when full
compliance will be achieved.
8004230 h p
j
i
.-
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
..f
^
..
Arkansas Power & Light Co=pany
-2-
April 27, 1976
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you or
your contractors believe to be proprietary, it is necessary that you
cake a written application within 20 days to this office to withhold
such inforcation from public disclosure. Any such application must
include a full state =ent of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so-
that proprietary information identified in the application is contained
in a separate part of the docu=ent.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Docu=ent Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
'
m"
.
G. L. Madsen, Chief,
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
IE Inspection Report No. 50-313/76-06
bec II Pail Unit for Distribution _ M////n
l
IE Chief, FC&EB
'
'
I
IE Chief, APD
IE Chief, TAB
IE:I" Reg. Coord.
IE Files
Standards Development
.
D?1 (12)
bec DAC: ADM for Distribution [/b9
(:
/~7
s
PDR:EQ
LPDE
i
Central Files
Arkansas State Board of Health
f