Text
n a
i l.
s
[TgulaIOPJ DOCK 6t [j[a, Tab 1e.I.1-3 MINIMtJM SAMPLING T.':n ANALYSIS FRiiQlllEY N
Item Test Freauency 1.
Gamma Isotopic Analysis a.
Bi-weekly (7)
Samples b.
Gross Activity Deternination b.
3 times / week and at Icas.t every third day (l)(6)(7) 2 c.
Gross Radioiodine Determination c.
Weekly (3)(6)(7' 2
(.11) d.
Dissolved Gases d.
Weekly (7)
{
c.
Chemistry (C1, F, and 0 )
e.
3 times / week (S) 2 f.
Boron Concentration f.
3 times / week g.
Radiochemical Analysis for g.
Monthly (7) l E Determination (2)(4) 2.
Borated Water Boron Concentration Weekly and after Storage Tank Water each makeup Sample
)
V 3.
Core Flooding Tank Boron Concentration Monthly and after
- s Sample each nakeup
~
j 4.
Spent Fuel Pool Baron Concentration Monthly and after Water Sample each makeup (9)
(
5.
Secondary Coolant a.
Gross Radioiodine Concentration a.
Weekly (5)(7)(10)
Sampics b.
Isotopic Radioiodine b.
Monthly (7)(10)
Concentration (4) e 6.
Sodium Ilydroxide Sodium Hydroxide Concentration Quarterly and i
Tank Sample after caeh makeup 7
Sodium Thiosulfate Sod itm Thiosulfate Concentration Quarterly and Tank Sample after each makeup i
Notes:
1 1
- 11) A gross radioactivity analysi s shall consist of the quantitative measurement i
of the total radioactivity of the primary coolant in units of pCi/gm.
~1 h e i
. total primary coolant activity shall be the su.n of the Jegassed beta-gamma j
activity and the total of al1 identific d gaseous activities 15 minutes aft er the primary system is sampled.
Whenever the grons radioactivity concentratien exceeds 10'. of the limit specified in the Specification v
3.1.4.1 or increases by 10 pCi/gm from the previous measured level, the frequency of sampiing and analyzing sh 11 be increased to a mir.imum of once/ day until a steady activity level is established.
8 0 () 4 " 3 0 Sk
~
E.,
L (2) 'd radiochemical n..alysis shall consist o f t he quas. i t:iti s,e us a snrt me nt of
.1he' activit y for each radionuct ish thich 1:. ident irict! in the prin.try coolant 15 minut es aft er the prime n system is samplid.
'the a;t t ivit ics for N./.
the-individual isotupes shall be m.d in t he det er minal ion of li.
A
~ radiochemical. analysis' and calculat ion of II and iodine isotopic act ivity shall be performed if the measured gross activity changes by More thiui 10 pCi/gm froa t he previous measured level.
The gamru energy per disinte-t gration for those radioisotopos determined t o be pr esent shall be as given in' " Table 'of. Inut opes" (Inf,7) and beta energy per di s in t egrat ion sha ll
'[
be as given in llSNRDh-Tit-802 (part 'I!) or other references using the equivalent 'vaiues for the radioisotopes.
.(3).in atidition to the weekly neasurement, t he radioindine concent rat ion.shall he determined i f the measured gross radioact ivity concentration changes
- hy more than 10 aCl/cm from the previous measured level.
(4 )
Iodinc. isotopic activitics shall he weighted to give I-131 dose equivaient act Ivity.
i1.'
(5)
In addition to the weel.ly measurement, the radiciodine concent rat. ion :. hall he dete' ruined if t here are indicat ioni. s hat t he prima y t o secondary coola st
~1cakage rate has increased by a factor of
?.
(6) hhencycr the steady state radiciodine or gross radioactivity concentration
- 2 of prior operat ion is great er than 1 percer.1 but le:s than 10 percent of L
Specificat ion 3.1.1.1, a sampic of reactor coolant shall be t al en wit hin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> _ u f any ' react or crit ica iiiy ;.nd an ily cd for radioac' ire 16 dim. of !
[
1-131 thtough 1-135 and gross radioactivity as well as the coolant sample l
y,,
and analyses reqnired by the above.
I lhenever t he : teady state radiciodine or gross railitar^t ivity conecatrat ion of prior operat ion,is grea t er' t han 10 percent of Speci ficat ion 3.1.d. ),
a sample of, reactor coolant shall be talen prier to any rean oi criticality and analyzed for radioact ive iodines of I-131 through 1 -135 and gros s radioactJvity as well as the coolant sample and analyses required by ahore.
(7)Not required when plant is in the cold shutdown condition or refueling shutdown condit ion.
x j
(8) 02 analysis is not required when plant is in the cold sinitdown condition or refueling shutdown condition.
l (9)..Itequired only. when ? fuel is in the pool and prior to 't ians ferring' fuel i
to the pool.
_(10). 'bt i
regtf red ~when not generating st eam in t he st ean generators.
.. (11) The -following shall be required only during Cycle 1 operation after 340 l
cffective full power days:
Gross radioiodine shall be determined at least three times per week a.
-during power operation.
4
, ;g
- l i
1 "
t e
-enr,
e, l
s b.
If the steady state gross radioiodine concentration increases by a factor of ten or more, the NRC shall be promptly notified with a written followup per Specification 6.12.3.1.
f
- e
'O 1
- 751 -
..