Proposed Tech Specs 4.1.3 Re Min Sampling & Analysis Frequency for Gross Radioiodine Analysis on RCS
ML19326C432
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/10/1976
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19326C429 List:
References
NUDOCS 8004230561
Download: ML19326C432 (3)


Text

n a

i l.

s

[TgulaIOPJ DOCK 6t [j[a, Tab 1e.I.1-3 MINIMtJM SAMPLING T.':n ANALYSIS FRiiQlllEY N

Item Test Freauency 1.

Reactor Coolant a.

Gamma Isotopic Analysis a.

Bi-weekly (7)

Samples b.

Gross Activity Deternination b.

3 times / week and at Icas.t every third day (l)(6)(7) 2 c.

Gross Radioiodine Determination c.

Weekly (3)(6)(7' 2

(.11) d.

Dissolved Gases d.

Weekly (7)

{

c.

Chemistry (C1, F, and 0 )

e.

3 times / week (S) 2 f.

Boron Concentration f.

3 times / week g.

Radiochemical Analysis for g.

Monthly (7) l E Determination (2)(4) 2.

Borated Water Boron Concentration Weekly and after Storage Tank Water each makeup Sample

)

V 3.

Core Flooding Tank Boron Concentration Monthly and after

s Sample each nakeup

~

j 4.

Spent Fuel Pool Baron Concentration Monthly and after Water Sample each makeup (9)

(

5.

Secondary Coolant a.

Gross Radioiodine Concentration a.

Weekly (5)(7)(10)

Sampics b.

Isotopic Radioiodine b.

Monthly (7)(10)

Concentration (4) e 6.

Sodium Ilydroxide Sodium Hydroxide Concentration Quarterly and i

Tank Sample after caeh makeup 7

Sodium Thiosulfate Sod itm Thiosulfate Concentration Quarterly and Tank Sample after each makeup i

Notes:

1 1

11) A gross radioactivity analysi s shall consist of the quantitative measurement i

of the total radioactivity of the primary coolant in units of pCi/gm.

~1 h e i

. total primary coolant activity shall be the su.n of the Jegassed beta-gamma j

activity and the total of al1 identific d gaseous activities 15 minutes aft er the primary system is sampled.

Whenever the grons radioactivity concentratien exceeds 10'. of the limit specified in the Specification v

3.1.4.1 or increases by 10 pCi/gm from the previous measured level, the frequency of sampiing and analyzing sh 11 be increased to a mir.imum of once/ day until a steady activity level is established.

8 0 () 4 " 3 0 Sk

~

E.,

L (2) 'd radiochemical n..alysis shall consist o f t he quas. i t:iti s,e us a snrt me nt of

.1he' activit y for each radionuct ish thich 1:. ident irict! in the prin.try coolant 15 minut es aft er the prime n system is samplid.

'the a;t t ivit ics for N./.

the-individual isotupes shall be m.d in t he det er minal ion of li.

A

~ radiochemical. analysis' and calculat ion of II and iodine isotopic act ivity shall be performed if the measured gross activity changes by More thiui 10 pCi/gm froa t he previous measured level.

The gamru energy per disinte-t gration for those radioisotopos determined t o be pr esent shall be as given in' " Table 'of. Inut opes" (Inf,7) and beta energy per di s in t egrat ion sha ll

'[

be as given in llSNRDh-Tit-802 (part 'I!) or other references using the equivalent 'vaiues for the radioisotopes.

.(3).in atidition to the weekly neasurement, t he radioindine concent rat ion.shall he determined i f the measured gross radioact ivity concentration changes

hy more than 10 aCl/cm from the previous measured level.

(4 )

Iodinc. isotopic activitics shall he weighted to give I-131 dose equivaient act Ivity.

i1.'

(5)

In addition to the weel.ly measurement, the radiciodine concent rat. ion :. hall he dete' ruined if t here are indicat ioni. s hat t he prima y t o secondary coola st

~1cakage rate has increased by a factor of

?.

(6) hhencycr the steady state radiciodine or gross radioactivity concentration

  • 2 of prior operat ion is great er than 1 percer.1 but le:s than 10 percent of L

Specificat ion 3.1.1.1, a sampic of reactor coolant shall be t al en wit hin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> _ u f any ' react or crit ica iiiy ;.nd an ily cd for radioac' ire 16 dim. of !

[

1-131 thtough 1-135 and gross radioactivity as well as the coolant sample l

y,,

and analyses reqnired by the above.

I lhenever t he : teady state radiciodine or gross railitar^t ivity conecatrat ion of prior operat ion,is grea t er' t han 10 percent of Speci ficat ion 3.1.d. ),

a sample of, reactor coolant shall be talen prier to any rean oi criticality and analyzed for radioact ive iodines of I-131 through 1 -135 and gros s radioactJvity as well as the coolant sample and analyses required by ahore.

(7)Not required when plant is in the cold shutdown condition or refueling shutdown condit ion.

x j

(8) 02 analysis is not required when plant is in the cold sinitdown condition or refueling shutdown condition.

l (9)..Itequired only. when ? fuel is in the pool and prior to 't ians ferring' fuel i

to the pool.

_(10). 'bt i

regtf red ~when not generating st eam in t he st ean generators.

.. (11) The -following shall be required only during Cycle 1 operation after 340 l

cffective full power days:

Gross radioiodine shall be determined at least three times per week a.

-during power operation.

4

, ;g

l i

1 "

t e

-enr,

e, l

s b.

If the steady state gross radioiodine concentration increases by a factor of ten or more, the NRC shall be promptly notified with a written followup per Specification 6.12.3.1.

f

  • e

'O 1