ML19326C420
| ML19326C420 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/20/1978 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19326C411 | List: |
| References | |
| NUDOCS 8004230550 | |
| Download: ML19326C420 (2) | |
See also: IR 05000313/1978010
Text
O
'M hd
'
R49
UNITt:0 STATES
f
y
NUCLEAR REGULATORY COMMISSION
["
'i
REGION IV
4
'f, ,
$
611 RYAN PLAZA ORIVE. SUITE 1000
9
"'
ARLINGTON, TEXAS 76011
4
-J
j/
June 20, 1978
Docket Numbers 50-313
50-368
Arkansas Power and Light Company
Attn:
Mr. William Cavanaugh III
Executive Director of Generation
and Construction
Post Office Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspectio. conducted by Messrs. T. F. Westerman,
R. G. Spangler, W. D. John:
a, E. Johnson, M. W. Dickerson, and N. Boyter
of this office on May 2-5, d-12,16-19, and 23-26,1978, of activities
authorized by NRC Construction Permit No. CPPR-89 for the Arkansas Nuclear
One, . Units 1 and 2, and to the discussion of the findings by the inspectors
with members of your staff at the conclusion of each segment of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
We have also examined actions you have taken with regard to previously
identified enforcement matters, unresolved items and open items. The status
of these items is identified in paragraph 3 of the enclosed report.
During this inspection it was found that certain of your activities were
not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Enclosure (1). This notice is
sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules
of Practice," Part 2, Title 10, Code of Federal Regulations. Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which.will be taken to avoid furthei noncompliance;
and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
1800423n $~ TO
-.
'
- r
,
,
,
Arkansas Power & Light Company
-2-
June 20, 1978
.; z
g.
=
.
Room. 'If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to this
.,=
office within 20 days of the date of this letter, requesting that such
information be withheld from public disclosure.
The application must
s
include a full statement of the reasons why it is claimed that the informa-
8
tion is proprietary. The application should be prepared so that any propri-
etary information identified is contained in an enclosure to the application,
since the application without the enclosure will also be placed in the Public
Document Room.
If we do not hear from you in this regard within the specified
.
period, the report will be- placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
~
to discuss them with you.
Sincerely,
ckt#
- .v
G. L. Madsen, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
IE Inspection Report flos. 50-313/78-10
50-368/73-12
cc: w/ enclosure
Arkansas-iluclear One
Attn:
Earley Ewing, Production
Startup Superv;sor
Post Office Box 608
Russellville, Arkansas
72801
.
L. Alexander, QC Supervisor
(Same Address)
,