ML19326B735

From kanterella
Jump to navigation Jump to search
Ack Receipt of Forwarding Addendum 1 to Util Final Rept Re Reactor Bldg Ductwork Deficiency
ML19326B735
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/02/1974
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19326B722 List:
References
NUDOCS 8004170567
Download: ML19326B735 (1)


Text

.

~

g O et.

7 n./ 2 0 1 e~.1..z 1<.

ff i

ATOMIC ENERGY COMMISSION

'~#$

WASHINGTON. D.C. 20545

.i MAY 2 574 Arkansas Power and Light Company Docket No. 313 ATTN: Mr. J. D. Phu'ips Senior Vice President Little Rock, Arkansas 72203 4

Gentlemen:

incak you for your letter dated April 26, 1974, with er. closed Addendum 1 to your final report on the reactor building ductwork.

This additional information will be reviewed and evaluated along with the final report.

Your cooperation is appreciated.

incerely,

. sb ~}./

~$g John'[G.', Davis, Deputy Director

// for Field Operations Directorate of Regulatory Operations l

l e

I q 's,1 f f, 4

5 i

8004170fd9' k'_