ML19326B725
| ML19326B725 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/29/1974 |
| From: | Grier B US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Moore V US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19326B722 | List: |
| References | |
| NUDOCS 8004170558 | |
| Download: ML19326B725 (1) | |
Text
- _ _ _ _
~
o e-APR 2 S B74 i
I V. A.11oore, Assistant Director for Light Water Reactors, Group 2, L i
REQU~.ST FOR TECIC;ICAL RINIR OF FJ. ACTOR LUILDIIiG DUCT'70nR MODIFICriIG::5, j
m AREAliSAS POWER Atc LIGHT CO.iF1 Y, UdIT :.O.1 - LOCEET l.3. 50-313 j
A significant deficiency in the design and construction of the
~
~
reactor building cool-air cupply ducts at Arkansas Lucicar One -
Luit I was reported to our RO:II in:pector.
Arlainsas Power and Licht Company required thair A-E, Ecchtel Corporation, to redesign and reconstruct a uajor portion of tha systa=. A report of the l
liccusee's invescination and corrective action has been received.
Since the design deficiency discovered at this facility =ay be generic witu the 1:echtei decign, va request that an in-dopth N'j review of the attached rc;. ort be conducted to detercine the adequacy of the corrective action.
l
. H. Grier, Assistant Director for Construction & Operation Directorate of Regulatory Operations i
1 i
l 1
ll
=
8 0 0417gggc