ML19326B725

From kanterella
Jump to navigation Jump to search
Requests Technical Review of Facility Reactor Bldg Ductwork Mods Adequacy
ML19326B725
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/29/1974
From: Grier B
US ATOMIC ENERGY COMMISSION (AEC)
To: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19326B722 List:
References
NUDOCS 8004170558
Download: ML19326B725 (1)


Text

- _ _ _ _

~

o e-APR 2 S B74 i

I V. A.11oore, Assistant Director for Light Water Reactors, Group 2, L i

REQU~.ST FOR TECIC;ICAL RINIR OF FJ. ACTOR LUILDIIiG DUCT'70nR MODIFICriIG::5, j

m AREAliSAS POWER Atc LIGHT CO.iF1 Y, UdIT :.O.1 - LOCEET l.3. 50-313 j

A significant deficiency in the design and construction of the

~

~

reactor building cool-air cupply ducts at Arkansas Lucicar One -

Luit I was reported to our RO:II in:pector.

Arlainsas Power and Licht Company required thair A-E, Ecchtel Corporation, to redesign and reconstruct a uajor portion of tha systa=. A report of the l

liccusee's invescination and corrective action has been received.

Since the design deficiency discovered at this facility =ay be generic witu the 1:echtei decign, va request that an in-dopth N'j review of the attached rc;. ort be conducted to detercine the adequacy of the corrective action.

l

. H. Grier, Assistant Director for Construction & Operation Directorate of Regulatory Operations i

1 i

l 1

ll

=

8 0 0417gggc