Notifies of Decision to Replace All Combustible Matls from Cable Penetrations Through Fire Barriers W/Noncombustible Matls to Upgrade Fire Stops.Replacement Started in Control Room & Cable Spreading Room & to Continue in Other Areas
ML19326B585
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/19/1976
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: Howard E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19326B583 List:
References
NUDOCS 8004160368
Download: ML19326B585 (1)


Text

_ _ _ _

H E LPIN G BUILD A FT K A N S A S ARK ANS AS POWER & LIGHT COMPA NY STM & LOUISIAN A STAEETS. LITTLE AOCK. AAK ANSAS 72203.(5011372-4311 January 19, 1976 Mr. E. Morris Howard, Director Office of Inspecti.on 6 Enforcement Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

Subject:

Arkansas Power G Light Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Inspection 6 Enforcement Report No. 50-313/75-07 N

V

Dear Mr. Howard:

Our September 19, 1975, letter to you described two alternatives for upgrading fire stops in cable penetrations through fire barriers at Arkansas Nuclear One-Unit 1 to accorraodate combustible material that was installed under a non-documented design change.

Following studies of the two alternatives, the decision was reached to implement the first alternative which involves removal of all combustible materials from cable penetrations through fire barriers and insertion of non-combustible materials. 'The materials to be used in replacing the combustibic silicon i

sealant are Marinite-36, Kaowool mixed with Flamemastic 71A, Flamemastic 71A and asbestos cloth strips ir. various configurations and combinations as deemed necessary for specific applications. Should cracking occur in any of the fire stops the cracks will be filled with Flamemastic and the entire fire stop will be sprayed with 2 layers of Flamemastic (each layer 1/8 inch thick).

We have already started this program in the control room and cable spreading room and will proceed from there to other areas of the plant where cables penetrate fire barriers.

Very truly yours, nu

/

/m}

William Cavanaugh III

\\v/

Manager, Nuclear Services WC:ay M

8004160 Mef