ML19326A098
| ML19326A098 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/03/1974 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19326A091 | List: |
| References | |
| NUDOCS 8001310662 | |
| Download: ML19326A098 (2) | |
See also: IR 05000346/1974007
Text
..
'
&
~-a.--
~
---
t
j .
"g
UtilTED STATES
b
.'1, [ fr, A !I
ATOMIC ENERGY COMMISSION
,
.
DIRECTORATc OF HEGULATORY OPERA'10NS
0, &jh
REGION tlC
f8 0'
709 ROOSEVELT ROAD
mmg;
GLEN ELLYN. ILLINOIS 6o137
(312) 856 2t a
>
3 1974
.. .
.
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell E. Roe
Vice President, Power
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
-
Gentlemen:
This refers to the inspection conducted by Messrs. Sutton, Hunnicutt,
Naidu and Jablonski of this office on October 23 - 25, 1974, of activities
at the Davis-Besse Constructior. site authorized by AEC Construction
Permit No. CPPR-80 and to the discussion of our findings with you and
Messrs.. Novak, and Lenardson and others of your staff at the conclusion
'
O
of the inspection.
'
A copy of our report of this inspection is enclosed and idencifies the
areas examined during the inspection. Within these areas, the inspection
consisted of a selective examination of procedures and representative
records, interviews with plant personnel, and observations by the
inspectors.
The inspectors also examined actions you have taken with respect to the
matter identified in your letter of July 26, 1974, which we previously
brought to your attention. We have no further questions regarding this
matter.
In addition, the inspector determined that corrective action is being
taken with respect to violations discussed in your letters of August 28,
1974, and September 25, 1974. The items and their resolution or planned
resolution are identified in Part III of the Detail Section of the
enclosed report.
Duri;ui this inspection, it was found that certain of your activitics
appear to be in violation of AEC requirements. The items and reference
to the pertinent requirements are listed under Enforcement Action in the
Summnry of Findings Section of the enclosed inspection report.
8001310
DOPI SENT TO:
PU3__ _ p
'
=_
'uf
NSIC___
.UMW .
,
.
_ _
.
/
.
,-,
(,
.
3
1" '"
Toledo Edison Company
-2-
This notica is cent to you purcuant to the provisions of Section 2.201
of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
thirty days of your receipt of this notica, a uritten statement or
explanation in reply, includin;;:
(1) correctiva ateps which have been
taken by you, and the results achieved; (2) corrective cteps which wil.1
be tahon to avoid further violations; and (3) the dato uhen full compliance
will be achieved.
In accordance with Section 2.790 of the AEC's " Rules of Practico," Part
2, Title 10, Coda of Federal Pogulations, a copy of this notice, the
enclocod inspection report, and your respoace to thin notice will be
placed in the AEC's Public Document Room. . If this report containa any
information that you or your contractora believe to be proprictary, it
is necessary that you make a uritten application to thic office within
twenty days of your receipt of this notica, to withhold such infor=ation
from public disclosure. Any such application must include a full state-
uent of the reasons for which it is claimed that the information is
proprietary, and should be prepared no the propriatary information
s
)
identified in the application is contained in a ceparato part of the
s,,
document. Unless va receive an application to uithhold information or
are otherwise contacted within the specified tima period, the uritten
material identified in this paragraph vill be placed in the Public'
Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely yours,
'
l
James G. Kappler
j
Regional Director
j
l
Enclosura
RO Inspection Report
-
No. 050-346/74-07
.
.
bec: RO Chief, FS&EB
RO:HQ (4)
,,
Licensing (4)
fsI
DR
ntral Files
,
i
i
d
Files
PDR-
Local PDR
_ _.
-
.__
-