ML19325E349

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-313/89-32 & 50-368/89-32 on 890816-0930 & Notice of Violation.Nrc Understands That Licensee Taking Appropriate Corrective Actions within Reasonable Period of Time Re Other Violations Noted
ML19325E349
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/25/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19325E350 List:
References
NUDOCS 8911060304
Download: ML19325E349 (3)


See also: IR 05000313/1989032

Text

p

-

, ,

.

<

p,

a

'

,

,.

s

-

b

Q:2$ @

,.

In Reply Refer To:

/

Dockets:

50-313/89-32

L.

50-368/89-32

s

-

i

,

l

\\

t

>

Arkansas Power & Light Company

'

ATTN:

Mr. Gene Campbell

.

r.

'1

L

Vice President, Nuclear

!

.

!

Operations

.

P.O. Box 551

"

L

Little Rock, Arkansas 72203

i

a

Gentlemen:

.

, o

.

r

This refers to,the routine safety inspection conducted by Messrs.'C

C. Warren

l

and R. C. Haag of this office during the period August 16 through September 30,-

,

1989, of activities authorized by NRC Operating Licenses DPR-51 and'NPF-6 for

e

' ' ;

Arkansas Nuclear One, Units 1 and 2, and to the discussion of our findings with

,

Nr. N. S. Carns and other members of your staff at the conclusion of the

j

inspecticn.

>

Areas examined during'the inspection included followup of events',-operational

.

. safety verification, maintenance, and surveillance test observation.

Within'

-

these areas. the inspection consisted-of selective examination of procedures

l

and representative records, interviews with personnel, and observations by the

j

'

inspectors.. The findings are documentea in the enclosed inspection report.

.

. e

o

-

s

o

During this inspection, it was found that certain of your activities were in

!

viol.ation of NRC' requirements.

Consequently, you are required to respond to

!

this violation; in writing, in'accordance with the provisions of Section 2.201

of the NRC'.s " Rules of Practice," Part 2. Title 10, Code of Federal

Regulations.

Your response should be. bared on the specifics contained in the

,

Notice of. Violation (Notice) enclosed with this letter.

'

!

In addition, it was found that while.certain other activities were in violation

.

'

of NRC requirements..you had identified the, problems and were taking

!

-

,

appropriate corrective actions within a reasonable period of time.

Because the

,!

'

"

s

'

'NRC wants to encourage and support licensee initiative for self-identification

-

.and correction of problems, a Notice of Violation will not be issued on this

E

~

,

';

item.

This action is' being taken in accordan e with Appendix C,

a

,

paragraph V.G.1,'of the NRC's Rules'of Fractice." Part 2, Title 10, Code of

i

,

Federal Reguistions.

,i

~

s

The response directed by this letter and the accompanying Notice is not subject

',

.to the clearance procedures'of the Office of Management and Budget as required

.

,

by the Paperwork-Reduction Act of 1980, Pl.96-511.

!

s

s

P

O

P \\ fIM

s

RIV:SRIA

C:

P/A

0:

0

CCWarren;df

DDChamberlain

JLMi

oan

l

10/24 /89

10/24 /89

10

/89

6gol

-

l

-

,s

-

(0911060304 891025

PDR

ADOCK 05000313

'

l

0

PNV

'

-

,

-,

y

,

,

, _

,

, -

Mr -

--

-

,

,,

I.

,

s.

'c

~%

.

,

^

i

Arkansas Power & Light Company

-2-

!

s

s,

f

Should you have any questions concerning this inspection, we will be pleased to

- discuss them with you.

'M

'

,

Sincerely,

.

i

Original Signed By:

'

,

James L Milboan

'

s

James L. Hilhoan, Director

I

i

Division of Reactor Projects

i

f

Enclosures:

~

1.

Appendix A - Notice of Violation

i

'

e

'. Appendix B - NRC Inspection Report

2.

50-313/89-32

50-368/89-32

i

t

cc w/ enclosures:

[

.

Arkansas Nuclear One

'

<

!

' ATTN:

Early Ewing, General Manager.

Technical Support and Assessment

,

P.O. Box 608

i

'

Russellville,' Arkansas 72801

e'

t

.

Arkansas Nuclear One

' ATTN:

Niel Carns, Director

~

Nuclear Operations

l

'

- P.O. Box 608

Russellville Arkansas 72801-

'

' Combustion Engineering, Inc.

L

ATTN:' Charles B. Brinkman, Manager

-

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite 330

i

,

'

Rockville, Maryland 20852

'

!

Honorable Joe W. Phillips

I

.

County Judge of Pope County

"

Pope. County Courthouse

' '

Russellville, Arkansas 72801

'

>

'

'

Bishop, ook, Purcell & Reynolds

,

ATTN: Nicholas S. Reynolds, Esq.:

l

1400 L Street, N.W.

!

'

Washington, D.C.

20005-3502

i

e

. U.S. Nuclear Regulatory Commission

>

ATTN:

Regional Administrator, Region IV

'

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas 76011

>

s

0

..

'

.

l

t

.

l'

i

,

.

..

.r-

l'

.

-

-

.

,

,

..

,. . - .

,, . _ . . .-

.

. . ~

'

,

-