Forwards Safety Insp Rept 50-440/89-23 on 890811-1011 & Notice of Violation
ML19325E204
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/25/1989
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19325E205 List:
References
NUDOCS 8911020225
Download: ML19325E204 (2)


See also: IR 05000440/1989023

Text

-

,

['

,' 1

.1

-

.

.

I ~

k

P

l

{l

'

,

$

OCT 251989

i

b

- Docket No. 50-440

'

p,

- Docket No. 50-441

3

!

J-

The Clevelaad Electric Illuminai.ing

i

-Company

ATTN: Mr. Alvin Kaplan

Vice President

Nuclear Group

10 Center Road-

,,

<

Perry, OH 44081

g

Gentlemen:

-

This refers to the routine safety inspection conducted by Messrs. P. L. Hiland

and G. F. O'Dwye.', of this office on August 11 through October 11, 1989, of

- activities at Perry Nuclear Power Plant, Unit 1, authorized by NRC Facility

.

Operating' License No. NPF-58 and to the discussion of our findings with-

'

S. F. Kensiki and others'of your staff at the conclusion of the inspection.

. i

The enclosed copy.of our inspection report identifies areas. examined

'

during the inspection. Within these areas, the inspection consisted of a

,

- selective examination of procedures and representative records,

i

observations, and interviews with personnel.

- During this inspection, certain cf your activities appeared to be in

violation with NRC requirements, as specifiea in the' enclosed Notice.

-A'

.

- written. response is required.

In accordance with 10 CFR 2.790 of the

- Commission's. regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

.

subject to.the clearance procedures of the Office of Management and Budget

- ;

as required by the Paperwork Reduction Act of 1980, PL 96-511.

'

We will gladly discuss any questions you have concerning this inspection.

t

Sincerely,

f(C

.

Richard C. Knop, Thief

Reactor Projects Branch 3

[

Enclosures:

1.

Hotice of Violation

2.

Inspection Report

l

No. 50-440/89023(DRP)

'

t

,

See Attached Distribution

.,

RIIII6

RIII

RIII

YI

WY&

rouin/sm

Ring

Knoph,

in t2

8911020225 891025

PDR

ADOCK 05000440

Q

PDC

,

'

~ ' ' ' ' - '

m

-

rI

\\.:. ,

,

' \\ , , ' e ' ' .*

,

o

..

'

.s.

0CT 251989

The Cleveland Electric Illuminating

2

Company.

,

n.-

Distribution,

cc w/ enclosure:

c

F. R. Stead, Director, Nuclear

~

Support Department

M. D.,Lyster, General Manager,

a

Perry Plant Operations Department

R. A. Newkirk, Manager,

Licensing and Compliance'Section

. S. F.. Kensicki, Director, Perry

,'

Plant Technical Department

H. Ray Caldwell, General

Superintendent Nuclear 0perations-

DCD/DCB (RIDS)

Licensing Fee Management Branch-

' Resident Inspector, RIII

Terry J. Lodge, Esq.

James W. Harris,' State of Ohio

Roger Suppes, Ohio-

' Department of Health

A. Grandjean, State of 0hio,

Public Utilities Commission

j

l

j

!

)

i

a