Notice of Violation from Insp on 890811-1011.Violation Noted:On 890925,incorrect Installation of Test Leads Into Wrong Control Room Panel Resulted in Failing Control Power Transformer for Emergency Svc Water Discharge Valve
ML19325E206
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/25/1989
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19325E205 List:
References
50-440-89-23, NUDOCS 8911020226
Download: ML19325E206 (1)


Text

..

-i

.s NOTICE OF V!0LATION l

4 The Cleveland Electric Illuminating License No. NPF-58 Company Docket No. 50-440 Perry Nuclear Power Plant

.As a result of the inspection conducted on August 11 through October 11, 1989, and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1989), the following violation was identified:,

i Technical Specification 6.8.1.a requires that written procedures be established, implemented, and maintained for surveillance tests.

Contrary to the above:

L On September 25, 1989, while perfonning Surveillance Instruction SVI-G43-T1306, l:

" Suppression Pool Makeup Timer Channel-A Functional / Calibration for 1G43-K1,"

L plant personnel failed to correctly implement Steps 5.1.9 and 5.1.10. The 1

incorrect installation of test leads into the wrong control room panel resulted 1

in failing a control power transfonner for an Emergency Service W&ter discharge

.l valve and the subsequent need to declare affected Division 1 safety related i

p equipment inoperable.

This is a Severity Level IV violation (Supplement I) (30-440/89023-02).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to I.

this office within thirty days of the date of this Notice a written statement I

(1)correctiveaction or explanation in reply, including)for each violation: corrective action to be taken to av l

taken and the results achieved; (2 L

further violations; and (3) the date when full compliar.ce will be achieved.

1 I

Consideration may be given to extending your response time for good cause shown.

L 1

OCT 251989 gfc [

Dated R. C. Knop, Chief U Reactor Projects Branch 3 l

/