Monthly Operating Repts for Sept 1989 for Limerick Generating Station Units 1 & 2.W/891013 Ltr
ML19325D820
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/30/1989
From: Leitch G, Jerome Murphy
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910260259
Download: ML19325D820 (11)


Text

w,r s p ., 'i u ,.

. 3892373210 T.S.s.9.1.6  :

h PHILADELPHIA ELECTRIC COMPANY ,

. LIMERICK GENER ATING STATION f P. O. DOX A  ;

SAN ATOGA. PENNSYLV ANI A 19464 (21 El 3271200. EXT. 3000

,, - G9t AH AM M. LEITCH

.4- vis. p..sies.? g u..............m October 13, 1989 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission ,

i Attnt' Document Control Desk Washington, DC- 20555

Subject:

Limerick. Generating Station Monthly Operating Report For Units 1 and 2' Enclosed are the monthly operating reports for Limerick Unit 1 and Unit 2 for the ncnth of September 1989 forwarded pursuant to Technical Specification 6.9.1.6.

Very tru yours,

[' .

l l JJM/kk ]

Enclosure ,

l

! cc: William T. Russell, Administrator, Region I, USNRC l~ T. J. Kenny, USNRC Senior Resident Itspector i

i. I 1

i l J l

WY i

(

'8910260259 890930 PDR ADOCK 05000352 6 PNV _ _ _ . _ , , _ _ _ , _ _ _ _

_, __ l

(w .

O:..

i ^

3892373210 i Docket No. 50-352 l Attacament to Monthly  !

r Operating Report for  !

September 1989 Limerick Generating Station i Unit 1 September 1 through September 30, 1989 I. Narrative Summary of Operating Experiences ,

Limerick Unit 1 began the month of September in OPCON 1 at a nominal 100% of rated thermal power. On September 10, 6 actor pow 7r was reduced to 55% to support a control rod <

pattern adjustment. Reactor power.was restored to 100% on i September 11. On September 14, reactor power was reduced to 75% to support another control rod pattern adjustment. Due to thermal limit restraints, the control roc pattern adjustment was not nade and power was restored to 100%. On Septembec 15, reactor power was again reduced. Power was reduced to 58% and a control rod pattern adjustment was made.

Reactor power was restored to 100% on September 17. On September 29, reactor power was reduced to 81% for a control rod pattern adjustment. Reactor power was restored to 100%

on September 30. Limerick Unit 1 ended the month of ,

September in OPCON 1 at a nominsi 100% of rated thermal i power.

Operational events that occurred during the month of September included:

On September 19, following the monthly operability run on the D13 diesel generator, eleven inches of water was ,

t i found in the D13 diesel generator fuel oil storage tank.

l The water was subsequently removed from the storage tank and the fuel oil lines were flushed. On September 22 l following removal of the water, an attempt was made to L operate the diesel ger.erator; however, the diesel failed l to start due to air in the fuel lines. The fuel lines were vented and the D13 diesel was subsequently started

l. and loaded successfully; however, the response time was l slow. On September 25, after more air was vented from l the fuel oil system, the surveillance test was again L performed and completed satisfactorily. The D13 diesel l generator was subsequently declared operable.

l I

l r l II. Challentes to Main Steam Safety Relief Valves E

There were no challenges to the Main Steam Relief Valves I

during the month of September.

I 1

1' 4b $ -,s _ , . _ . . - ., . , - , . , , . _ - _,_# , ,. , _ . _ . , - , _ , , ,

p w., ,y.S e ,

F  %

-L' j: "*' -

3892373210 1

( -i,,k . ,,.

ic jf AVERAGE' DAILY UNIT POWER LEVEL y L ,b l DOCKET NO. 50 - 352 i ............................_  !

[' UNIT LIMERICK UNIT 1 j 1

h DATE OCTOBER 13,1989 I e ....................___. ....  ;

. COMPANY PHILADELPHIA ELECTRIC' COMPANY 'l

..........._________... ____. J J. J. MURPHY REPORTS SUPERVISOR PROJECTS DIVISION LIMERICK CENERATING STATION  !

TELEPHONE (215) 327-1200 EXTENSION 3752 -

MONTH SEPTEMBES 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) -

1 1011 17 1011 3 2 1012 18 1028 3- 1015 19 1013 4 1022 20 1007 ,

5 1020 21 1007 6 1025 22 986 7- 1013 23 1010 8 1015 24 1033 s

9 1005 25 1024 10 741 26 1047 11 992 27 1029 12 1007 28 1017 13 1003 29 1008 i

-14 987 30 966 15 932 19 825

?Y I '

i

. .s.

x. . , . .

, x e -

. . o

< + 3892373210

. 1 L

h

(\ '

't

),

OPERATING DATA REPORT DOCKET NO. 50 352 +

,- DATE OCTOBER 13.1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY J. J. MURPHY REPORTV SUPERVIEOR .

PROJFCTA DIVISION (

LIMERICK GENERATING STATION TELEPHONE (215) 327 1200 EXTENSION 3752 OPERATING STATUS

.1 , UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WERE THREE SCHEDULED

~2. RSPORTING PERIOD: SEFTEMPER, 1989 LOAD REDUCTIONS OF 20%

'3. LICENSED THERMAL' POWER (MWT): 3293 OR MORE. ALL THREE WERE 4.' NAMEPLATE RATING'(GROSS MWE): 1138 TO SUPPORT CONTROL R00

~

5. DESIGN ELECTRICAL RATING (NET MWE): 1055 ADJUSTMENTS.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092

~7. MAXIMUM DEPENDABLE C6PACITY (NET MWE): 1055 s

.8. IF CHANGES OCCUR IN CAPACITY RATIN35 (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

9. POWER. LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY: ,

THIS MONTH Y9.TO-DATE CUMULAT!vE 11 HOURS IN REPORTING PERIOD 720 6.551 32.111

12. NUMBER OF HOURS REACTOR WAS '.RITICAL 720.0 3.575.5 24.919.8
18. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.9
14. HOURS GENERATOR ON-LINE 720.0 3.429.9 24.462.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16~.' GROSS THERMAL ENERGY GENERATED (MWH) 2.317.834 9,859.039 70.657.596
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 748.190 3.159.020 22.840.690 18.. NET ELECTRICAL ENERGY GENERATED (MWH) 715.425 2.954.683 21.797.171 PAGE 1 0F 2 L

6 l

- - - - , , , , . + , .l

Q *. .

,a. :i; ,

x

' ? 7'p i r

3892373210 v

F I

s OPERAT]NG DATA REPORT (CONTINUEC) DOCKET NO. 50 - 352 DATE OCTOBER 13.1989  !

THIS MONTH YR-TO-DAT" CUMULATIVE

\

,4 - 19. UNIT SERVICE PACTOR 100.0 52.4 76.2 t.,

F ............ ............ ............

[
20. UNIT AVAILAE!Lf7V PACTOR 100.0 52.4 76.k '

(- 21. UNIT CAPACITY PACTOR (L' SING MDC NET)' 94.2 42.8 64.3 3

22. UNIT CAPACITY PACTOR (USING DER NET)- 94.2 42.8 64.3 r ; 23. UNIT PORCED OUTA0E RATE 0.0 0.0 3.2

............ ............ ............ ,1 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

A MID CYCLE OUTAGE IS FORECAST TO BEGIN 02/03/90 '

26. IP SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTup:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCAAL OPERATION): PORECAS1 ACHIEVED INITIAL CRITICALITV 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION iST OTR 86 2/01/86

)

i l'

1 l'

l ('

l:

l PAGE 2 0F 2 I

l l

ll t

m m

. 38923732j0 N /

UNIT SHUTDOWMS CND POWE.!f. EDUCTION 3 DOCKET NO. 50 - 352 . -

UNIT NAME I.!mE31C4 UNIT 1  ; ,- l DATE OCTOBER 13.1999 - ' '

REPORT M3MTH SEPTEMBER. 1999 COMPLETED BY PHILADELPHIA ELECTsalC COMPANY

~

J. J. MURPHY 1-REPORTS SUPERVISOR PROJECTS DIVISION LINERIt'K GENERATING STATION 7 TELEPHONE (215) 327-1200 EXTENSION 3752 l l NETHOD OF LICENSEE ISYSTEM COMPONENT l CAUSE AND CORRECTIVE. .

l TYPE DURATIONlREASON SHUTTING DOWN EVENT l CODE - CODE l ACTION TO ^^-

NO.$ DATE (1) (HOURS)l (2) REACTOR (3) l REPORT # I #4) l (5) l PREVENT RECURRENCE l l I I 3 l 890910 5 ,l 000.0 F 4 N/A l ZZ l ZZZZZZ REACTOR POWER REDUCED TO aCCOmODATE I l 1 l A CONTROL ROD PATTERN ADJUSTMENT I 1 4 890914 S 000.0 F 4 M/A ZZ ZZZZZZ REACTOR POWER REDUCED TO ACCOmODATE A

5 890915 S 000.0 l F 4 N/A ZZ l ZZZZZZ REACTOR POWER REDUCED TO ACCOmODE.TE l l A CONTROL ROD PATTERN ADJUSTMENT I- I  !!' I I I i l l l -

g _

1

~

I

  • f ,

(1) (2) (3) (4)

  • - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS
  • S - SCHEDULED A- EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION O' DATA B - VAINTEN9NCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTIDM 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE a6 4

-,e. - . '.,e ,=*ry , e -

M i~ m

-- e gg y- g-y e er w wg apr- y mm- re e-4+,-era y .- , T

^

.5 . .

Dockot No. 50-353

- Attcchmsnt to Monthly 3892373210 Operating Report for i

September 1989  :

Limerick Generating Station Unit 2  !

September 1 through September 30, 1989  !

I.. Narrative Summary of Operating Experiences Limerick Unit 2 began the month of September in OPCON 1 at ,

14% of rated thermal power. On September 1, the Unit 2

. generator was synchronized to the grid for the first time and loaded to 90 MWe. On September 18, the loss of offsite power .

test was performed with reactor power at a nominal 24% of rated thermal power. The reactor scrammed on reactor low level as expected. Reactor level was res' ced using RCIC.

All diesel generators started and loaded successfully.  !

~

Following restoration of offsite power, the Unit was placed I in cold shutdown. '

Unit 2 was placed in startup and achieved criticality on September 20. On September 25, the Unit was shutdown from outside the' Control Room for a remote shutdown panel test.

The shutdown was performed while the unit was operating at a-nominal 22% power. The unit was subsequently placed in cold shutdown for a scheduled mini outage. Limerick Unit 2 ended the month of September in OPCON 4 with a reactor coolant temperature of 138 F.

Operational events that occurred during the month of September included-On September 11, while at 29% reactor power, the Unit 2 main turbine tripped as a result of a generator stator cooling trip signal. The turbine bypass valves opened to control reactor pressure. Because of the limited capacity of the bypass valves, reactor power was reduced -

to 24% by inserting control rods to insure reactor pressure control.

II. Challenges to Main Steam Safety Relief Valves There were no chtllenges to the Main Steam Safety Relief Valves during the month of September; however, relief valsas ,

were cycled manually as part of the startup test program. i I

l l

l l

l l

l i

cm

^ -

.. ~. g . .

. , .o  ;

['..' -

4 . 3892373210  :

5-  :

AVERAGE DAILY UNIT POWER LEVEL '

i DOCKET NO. 50 - 353 UNIT LIMERICK UNIT 2

............................. l DATE OCT086R 13 1989 '

l COMPANY PH1LADELPHIA ELECTRIC COMPANY J. J. MURPHY  !

^

REPORTS SUPERVISOR PROJECTS DIVISION l LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752 MONTH SEPTEMBEA 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '

(MWE-NET) (MWE-NET) 1 12 17 166 2 81 18 135 , e i

3' 59 19 0 4 ~156 20 0 5 191 Il 0 6 174 22 120 7 172 23 157 '

8 171 24 260  ;

9 e64 25 143 10 206 26 0 11 116 27 0 12 230 28 0

'13 394 29 O

14 348 30 0 15 343 i

'6 329 l

9 c

p: m . . , m. .

. a.- , . , m - c . .

i i/. '

i n - - .

3892373210 3i 8

i '

OPERATING DATA REPORT' i n i.

$s DOCKET NO. 50 - 353 DATE OCTOBER 13, 1989 COMPLETED BY PHILADELPHIA ELECTRIC COEPANY I

.......... 2.................

J. J.. MURPHY  ;

1EPORTS SUPERVISOR '

PROJECTS DIVISION LIMERICK GENERATING STATION .i TELEPHONL (215) 327-1200 EXTENSION 3752 .

OPERATING STATUS

1. UNIT NAME LIMERICK UNIT 2 NOTES: A FULL POWER LICfNSE
2. REPORTING PERIOD: SEPTEMBER, 1989 WAS !$5UED ON 8/25/89. ,
3. LICENSED THERMAL-power (MWT): 0 THE STARTUP TESTING 4 NAMEPLATE RATING (GROSS MWE): 1138 PROGRAM IS IN PROGRESS.
5. DESIGN ELECTRICAL RATING (NET MWE): 1055
  • COMMERCIAL OPERATION IS 6.' MAXIMUM DEPENDABLE CAPACITY (GFoSS MwE): -

FXPECTED IN THE FIRST ,

7. MAXIMUM DEPE'NDABLE CAPACITY (NET MwE): QUARTER OF 1990.
8. IF'CH'ANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. power LEVEL TO WHICH RESTRICTED. IF ANY (NET MwE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE >

11. HeJR$ IN REPORTING PERIOD *

...........O. ...........O. ...........O. .i

12. NUMBER OF HOURS REACTOR WAS CRIT 1'AL $41.2 541.2 541.2 a
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0'. 0 14 HOURS GENERATOR Oh-LINE 471.2 4 471.2

............ ....... .'...1.2 ............

=15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

16. GROSS THERMAL ENERGY GENERATED (MwH1 440.719 440,729 440.729

17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 104.440 104.440 104.440
18. NET ELECTRICAL ENERGY GENE.9ATED (MwH) 97.734 97.734 97.734 PAGE 1 0F 2

/

i j

1

~~ , .--. . - - - ,- .- , -,

~ s' r, ', '. 'm ' ' '*

f;:

Lj s

,,,r  ;., * . . . ,

f ~ 'g ( * .  ?

. . 3892373210 i, ,

I i

!. OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 353 l' i

DATE OCTOBER 13, 1989 E

THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 65.4 .

............ . . . . . . . . .Q 0 ........J1s0

20. UNIT AVAILABILITY FACTOR 65.4
'. ............ ........ 0.0 ........J260
21. UNIT CAPACITY PACTOR (USING MDC NET) 12.9 -

............ ........ 0.0 . . . . . . . . J160 t 4 ,22. UNIT CAPACITY FACTOR (USING DER NET) 12.9

............ ........ 0.0 ... . . . .. JQ 0

23. UNIT. FORCED OUTAGE RATE 0.0 0.0 0.0

............ ............ ............ p

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. ' AND DURATION OF EALH):

INITIAL POWER ASCENSION TESTING 15 IN PROGRESS

. 25. . !P SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP 26.' UNITS IN TEST STATUS (PR1'OR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 8./.12./.8 9. .. . 8./.12./.89

-!NITIAL ELECTRICITY 9./.01./.8 9. .. . 9./.01./.89 COMMERCIAL OPERATION 2,/,0,1,/,9,0, , , ,,,,,,,,,

  • NOT APPLICABLE PRIOR TO COMMERCIAL OPERATION t

i b

PAGE 2 0F 2

?

I

/

5

< . . - - - g _--

UNIT SHUTDOMMS AND.POWE;2 LEDUCTIONS. DOCKET NO. 50 - 353 3892373210f ".

UNIT MAME LINERICK UNIT 2 j

  • 2

- }.  :

'DATE OCTOBER 13 '999 ~ N3, REPORT MONTH SEPTEMBER. 1989 COMPLETED SY PM.LADELPHIA ELECTRIC COMPANY ~ ':.,.

J.' J. MURPHY '2 #

REPORTS SUPERVISOR '~

PROJECTS DIVISION LIMERICK GENERATING STATIOh -S-TELEPHONE (215) 327-1200 EXTENSION 375? '

l METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPEIDURATION REASON l$H'JTTING DOWN EVENT CODE COOE ACTION TO NO. DATE (1)l (HOURS) (2) l REACTOR (3) REPORT * . (4) (5) PRE'IENT RECURRENCE I l 1 890901 Ig 1 S 19.0 H 4 N/A ZZ- ZZZZZZ UNIT AMAITING INITIAL SYMCHRONIZATION -

2 890903 S 10.2 8 4 N/A ZZ ZZZZZZ STARTUP TESTING PROGRAM PROCEDLTES -

1 I I 3 890911 S' 10.4 5 4 N/A ZZ l ZZZZZZ .l STARTUP TESTING PROGRAM PROCEDLSES .

4 890918 5 000.3 8 l 4 N/A ZZ ZZZZZZ STARTUP TESTING PROGRAM PROCEDURES Y l

5 890918 5 C83.0 9 3 N/A ZZ l ZZZZZZ FIRST PLANNED SCRAM TO SUPPORT THE l l STARTUP TEST. PROGRAM. STP-28.1 l REMOTE SHUTDOWN PANEL DEMONSTRATION.

l 6 890914 5 125.9 8 2 N/A ZZ ! ZZZ2ZZ SECOND PLANNED SCRAM TO SUPPORT THE ll STARTUP TEST PROGRAM. STP-28.2 l REACTOR COOLDOwN DEMONSTRATION.

I 248.s i  ! -

(1) (2) (3) (4) .

i F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS [

S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE ,

C - REFUEtING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) -

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161) ..

E - OPERATOR TRAINING + LICENSE EXAMINATION .

F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H- cTHER(EXPLAIN) EXHIBIT I - SAME SOURCE D

_. -----, - - - - - , = - - - - . . --w.- -- '