Forwards IE Insp Repts 50-491/80-05,50-492/80-05 & 50-493/ 80-05 on 800415-17 & Notice of Violation
ML19323G882
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 04/29/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19323G880 List:
References
NUDOCS 8006090144
Download: ML19323G882 (2)


See also: IR 05000491/1980005

Text

.

.

nKero

,

'

c

q

UNITED STATES

O'A

NUCLEAR REGULATORY COMMISSION

n

,E

REGION 11

'

'#

o

101 MARIETTA ST

N.W., SUITE 3100

ATLANTA, GEORGIA 30303

APR 2 91980

In Reply Refer To:

RII:JRH

50-491/80-5

50-492/80-5

50-493/80-5

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

,

This refers to the inspection conducted by J. R. Harris of this office on April 15

through 17, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-167,

CPPR-168 and CPPR-169 for the Cherokee Nuclear Station facility, and to the discus-

sion of our findings held with J. T. Moore at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

During the inspection it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

Corrective actions to prevent recurrence were completed prior to

the conclusion of this inspection; therefore, a reply is not requested.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

'

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20'tiays to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of tue

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

-

.

, ..

.

.

(

.8006090/.ff

____ _

_ _ _

.-

-

_

_

. _ _

_

. . _ . _ - , . .

_1

-

-

.

-

- ,

,

. .

Duke Power Company

-2-

APR 2 91980

,

Should you have any' questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

s

i

w

C. E. Murphy, Chief

Reactor Construction and Engineering

,

Support Branch

,

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-491/80-5,

50-492/80-5 and 50-493/80-5

.,

cc w/ encl:

J. T. Moore, Project Manager

P. O. Box 422

Gaffney, SC 29340

.