Forwards IE Insp Rept 50-285/80-03 on 800211-14,25-28 & 0310-14 & Notices of Violation & Deviation
ML19323E632
Person / Time
Site: Fort Calhoun 
Issue date: 04/15/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Jones
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML19323E633 List:
References
NUDOCS 8005270074
Download: ML19323E632 (2)


See also: IR 05000285/1980003

Text

$ IC

,

,

  1. pa ascoq'o,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

ON

$

REGION 8V

7

I)*

o

611 RYAN Pt.AZA DRIVE, SulTE 1000

3 {,%

A[

ARLINGTON, TEXAS 76012

%..'...

April 15, 1980

'

In Reply Refer To:

Docket No. 50-285/80-03

i

Omaha Public Power District

ATTN:

Mr. W. C. Jones, Divi::ica Manager -

Production Operations

1623 Harney Street

Omaha, Nebraska

68102

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. Kelley, R. G. Spangler

and D. G. Mcdonald of this office during the period of February 11-14, 25-28

and March 10-14, 1980, of activities authorized by NRC Operating License DPR-

40, and to the discussion of the findings with members of your staff at the

conclusion of the inspection.

Principle areas examined during the inspection included:

(1) Refueling

activities; (2) Refueling maintenance activities; (3) Refueling surveillance

activities; (4) Observation of work activities; and (5) In-containment audit

of safety-related electrical equipment. Within the areas, the inspection

consisted of selected examinations of procedures and representative records,

interviews with personnel, and observations by the inspectors.

During this inspection it was found that certain of your activities were not

conducted in full, compliance wit's NRC requirements, as set forth in the Notice

of Violation, enclosed herewith as Enclosure (1). This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to

submit to this office, within 20 days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will

be taken to avoid further noncompliance; and (3) the date when full compliance

will be achieved. Also, based on the results of this inspection, it appears

that one of your activities is in deviation from one of your commitments to

the Commission, as set forth in the Notice of Deviation, enclosed herewith as

Enclosure (2). You are requested to submit to this office within 20 days

of your receipt of this notice, a written statement in reply including: (1)

actions which you plan to take to satisfy your comitment; and (2) the date

when the above actions will be complete.

soos270W d

.

- .- .

..

.

.

.

. _ -

_

.

.

.

.

i

Omaha Public Power District

-2-

April 15, 1980

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and.the enclosed

inspection report will be placed in the NRC's Public Document. Room.

If this

report contains any information that you or your contractors believe to be

proprietary, it is necessary that you make a written application with 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons for which it is claimed

that the information is proprietary, and should be prepared so that the proprie-

tary information identified in the application.is contained.in a separate part

of the document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Q$W

G. L. Madsen, Chief,

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Notice of Violation

2.

Notice of Deviation

3.

IE Inspection Report No. 50-285/80-03

cc w/ enclosure:

S. C. Stevens, Manager

Fort Calhoun Station

P. O. Box 98

Fort Calhoun, Nebraska

68023

-

i