ML19323E635

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 800211-14,25-28 & 0310-14
ML19323E635
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/04/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19323E633 List:
References
50-285-80-03, 50-285-80-3, NUDOCS 8005270075
Download: ML19323E635 (1)


Text

-

O Omaha Public Power District Fort Calhoun No. 50-285 NOTICE OF VIOLATION Based on the results of an NRC inspection conducted February 11-13, February 25-28 and March 10-14, 1980 it appears that certain of your activities were not conducted in full compliance with NRC requirements as indicated belov:

Section 5.8.1 of your Technical Specification requires that written procedures be established and implemented.

A.

Repair of MS-MV-281, Type 3700 Dresser valves is required to be done in accordance with Maintenance Procedure No. MP-MS-1.

Contrary to the above, a main steam safety valve (MS-MV-281) was repaired in accordance with Maintenance Procedure No.

MP-RV-1.

This is an infraction.

B.

Section 2.12.3.1 of the Plant Radiation Protection Manual requires that a respirator mask fit retest and certification occur once every two years.

Contrary to the above, it was determined that one individual was certified to wer.r a respirator on January 28, 1980, and had not been " fit tested" since October 11, 1977.

This is an infraction.

8005S70 O 7 I 4

-