Text
[
4}
UNITED STATES
NUCLEAR REGULATORY COMMISSION
3
REGION I
g*****,d[
631 PARK AVENUE
4
KING oF PRUSSIA, PENNSYLVANIA 19406
MAR 1 1 1 E
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATTN:
Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection Nos. 50-317/79-23 and 50-318/79-22
This refers to the inspection conducted by Mc. R. Architzel of this office on
December 26, 1979 through January 31, 1980, at the Calvert Cliffs Nuclear
Power Station, Lusby, Maryland of activities authorized by NRC License Nos.
DPR-53 and DPR-69 and to the discussions of our findings held by Mr. R. Architzel
.
I
with Mr. R. Denton at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
I
inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These
items of noncompliance have been categorized into the levels as described in
our correspondence to you dated December 31, 1974.
This notice is sent to you
l
pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to
submit to this office, within twenty (20) days of your receipt of this notice,
a written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results achieved; (2) corrective steps
which will be taken to avoid further items of noncompliance; and (3) the date
when full compliance will be achieved,
In addition to the need for corrective
action regarding these specific items M noncompliance, we are concerned about
the implementation of your quality assurance program that permitted them to
occur.
Consequently, in your reply, you should describe in particular, those
actions taken or planned to improve the effectiveness of your quality assurance
program.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
l
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
1
will be placed in the NRC's Public Document Room. If this report contains any
I
I
l
,
(
I
l
8005220
l
l
- - - - - - - -
.
.
Baltimore Gas and Electric
2
EII
Company
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the infomation, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which rill be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The infomation sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
[
_ _ -
,, d
El o.
. Brunner, Chief
Readtor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement
Inspection Report Nos. 50-317/79-23
and 50-318/79-22
cc w/encls:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
T. Sydnor, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Engineer
l
!