Forwards IE Insp Repts 50-317/79-23 & 50-318/79-22 on 791226-800131 & Notice of Violation
ML19323D843
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/11/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19323D836 List:
References
NUDOCS 8005220424
Download: ML19323D843 (2)


See also: IR 05000317/1979023

Text

[

4}

UNITED STATES

NUCLEAR REGULATORY COMMISSION

3

REGION I

g*****,d[

631 PARK AVENUE

4

KING oF PRUSSIA, PENNSYLVANIA 19406

MAR 1 1 1 E

Docket Nos. 50-317

50-318

Baltimore Gas and Electric Company

ATTN:

Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection Nos. 50-317/79-23 and 50-318/79-22

This refers to the inspection conducted by Mc. R. Architzel of this office on

December 26, 1979 through January 31, 1980, at the Calvert Cliffs Nuclear

Power Station, Lusby, Maryland of activities authorized by NRC License Nos.

DPR-53 and DPR-69 and to the discussions of our findings held by Mr. R. Architzel

.

I

with Mr. R. Denton at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

I

inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

These

items of noncompliance have been categorized into the levels as described in

our correspondence to you dated December 31, 1974.

This notice is sent to you

l

pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to

submit to this office, within twenty (20) days of your receipt of this notice,

a written statement or explanation in reply including:

(1) corrective steps

which have been taken by you and the results achieved; (2) corrective steps

which will be taken to avoid further items of noncompliance; and (3) the date

when full compliance will be achieved,

In addition to the need for corrective

action regarding these specific items M noncompliance, we are concerned about

the implementation of your quality assurance program that permitted them to

occur.

Consequently, in your reply, you should describe in particular, those

actions taken or planned to improve the effectiveness of your quality assurance

program.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

l

Title 10, Code of Federal Regulations, a copy of this letter and the enclosures

1

will be placed in the NRC's Public Document Room. If this report contains any

I

I

l

,

(

I

l

8005220

l

l

- - - - - - - -

.

.

Baltimore Gas and Electric

2

EII

Company

information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the infomation, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which rill be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The infomation sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

[

_ _ -

,, d

El o.

. Brunner, Chief

Readtor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement

Inspection Report Nos. 50-317/79-23

and 50-318/79-22

cc w/encls:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

T. Sydnor, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer

l

!