t VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH April YEAR 1980 SUBMITTED:
Y SUPEgNT - OPERATIONS APPROVED-
/
hfh N
STATION MANAGER
(
1 OPERATING DATA REIORT DOCKET?iO. 50-338 3-2-80 D A TE ~N K - PladISOR COMPLETED 3Y TELEPHONE T70 N -5151 OPERATING STATUS N*
- 1. Unit Name:
Mnrth ann' i April l969
- 2. Reporting Period:
2775
- 3. f 'W Therrnal Power AWt):
^
947
^' '
- 4. Nameplate Rating (Gross MWe):
907
- 5. Desgn Electrical Rating (Net MWe).
928
- 6. Maximum Dependable Capacity (Gross MWe):
898 7~ Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Thmugh 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Whach Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month YrAo-Date Cumulative
- 11. Hours In Reporting Period 714 7cm 1A Ann
- 12. Number Of Hours Reactor Was Critical 641.3 2333.2 12.498.4
- 13. Reactor Reserve Shutdown Hours 49 41.9 190.2 633.7 2,176.4 12,229.6
- 14. Hours Generator On-Line 0
0 0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 7n1 non 5.410.269' 31 640,lR')
l
- 17. Gross Electrical Energy Generated (MWH) 533 304 1.695.812 10.042.161
- 18. Net Electrical Energy Geneuted (MWH).
505,742 1,593,776 9.447.222 f
- 19. Unit Service Factor
__. '48.
75.O 73.1 88.
75.0 73.3
- 20. Unit Availability Facto, 78.3 61.1 63.1
- 21. Unit Capacity Factor (Using MDC Ne')
77.6 60.5 62.4
- 22. Unit Capacity Factor (Using DER Net)
II 7 R2 4?
l
- 23. Unit Forced Ouhge Rate l
- 24. Shutdowns Scheduled Over Next 6 Mor.ths (Type. Date,and Duration of Each):
May 16 throuch May 26.198C; Routina Maintonantn fUA
- 25. If Shur Down At End Of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
AVERAGE DAILY UNI"." POWER LEVEL DOCKET NO.
50-338 I
UNIT May 2, 1980 DATE ll. R. Madison COMPLETED BY 703-894-5151 TELEPHONE MONTH April 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 829 828 g
37 2
830 828 18 802 820 3
39 825 4
20 0
828 5
21 0
828 6
22 146 824 i
7 23 5
400 823 8
24 9
799 822 25 825 821 to 26 825 821 27 825 81 9 12 28 13 824 823 29 822 824 14 30 825 15 31' 822 16 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the rieares! whole rnegawart.
(9/77)
A 50-338 I)OCKET NO.
f UNIT SilU11) OWNS AND POWER REI)UC110NS UNil' N AM E North Anna !
D A I E._3.-E-80 COMrtE1EI) HY G Nottfor_
l '-
REPORT hf 0NTil April 1980 intrinONE 03-894-5151 w.
5
~
I.lcentee h
\\
Cause & Currective
.h E 3
gj g
fg$h 5
Event y
Acilon su No.
Date g dij g Repent #
in t>
Prevent Recurrence c3 ::.,
a:
g a
i 80-12 800403 F
81.0 H*
3 LER/R080-37 SF Valvex High steam flow and low steam pressure safety injection with reactor trig. While attempting to perform a 3 stroke test on "A" I
main steam line trip valve the valve went fully closed.
Reset d
all MSTV's to proper degree of l;
stroke.
Will refrain from perfor-mance of thisitest at power.
i 80-13 800408 F
4.3 G*
3 NA
'NA NA Turbine trip caused reactor trip.
1 Electrical liydraulic control syster f
reservoir Lo-Lo level alarm
!'l actuation.. Limit switch was inad-vertantly operated by turbine p
operator while attempting to deter-mina raisse fnr Ili loval alarm 0 g or g g remigdeg to ver g. instruments rat l
J p
a an a ustmen i-F: Forced Reason:
Method:
Exhi511 G - Inst ructions l
S: Scheduled A Equipment Falture(Emplain),
I Manud for rseparatinn of Data B Maintenance of Test 2 Mr.oalScram.
Entry Shws fm !leensee G
C. Refueling
.I,'sutomatic Scram.
Eve'nt Repost (i.ER)l'ile (NUREG.
D-Reguistory Restrlethm 4-Othes (Explain) 01611 12 Operator Training & ticense Examinalkm 1
!I F.Adndnistrative 5
G-Operational lis tor (Explain)
Exhible 1. Same Source i
19/77)
II Othes (Explain) f a
f
- See attached sheet.
]
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH April UNIT NAME North Anna 1 YEAR 1980 DATE 5-8-80 COMPLETED BY 703-894-5151 ext. aus 80-12 (H) 4-3-80 Time: 2312 the performance test scheduled Operations Department to perform a 3 stroke test on the three main steam trip valves located in the main steam safeguards building.
The valve is automatically supposed to close down only by 3 to verify operability each 92 days, however, it traveled past this point and closed completely.
High steam flow resulted in remaining 2 lines with accompaning low pressure causing safety injection & reactor trip. The 3 MSTV's were inspected and their 0
3 limit reset.
The test is now no longer required to be performed while at power.
80-13 (G) 4-8-80 Time: 1147.. turbine' trip / reactor trip.
Operator in turbine building was investigating the cause of a High level alarm in the.EHC 1
reservoir. The actual level was normal.
He attempted to cycle the alarm switch to see if it was sticking but he was on the Lo-Lo alarm switch.
Upon Lo-Lo alarm both EHC pumps tripped lock-out causing low EHC pressure signal to trip the turbine.
)
I c
l l
OPERATING DATA REPORT 50-339 DOCKET NO.
DATE 5/2/80 i
l COMPLETED BY M R Madison t
TELEPHONE (700 904-5151 i
OPERATING STATUS North Anna Unit 2 Not*5
~
~
- 1. Unic Name:
Aoril 1980 North Anna 2 License NPF-7
- 2. Reporting Period:
issued for fuel loading and 139
- 3. Licensed Thermal Power (MW ):
low power testiTig.On'4 4. Nameplate Rating (Gross MWs):
g47 80.
907
- 5. Design Electrical Racing (Ne' MWe):
928
- 6. Maximum Dependable Cape ity (Gross MWe):
898 l
- 7. Maximum Dependabie Capt sity (Net MWe):
l
- 8. If Changes Occur in C speci:y Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
l N/A N/A
- 9. Power Level To Wluch Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
This Month Yr. to-Date Cumulative Criticality not achieved
- 11. Hours tn Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
0 0
0 0
0
- 13. Rescror Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours n
n n
- 10. C-oss Thermal Energy Generated (MWH) 0 0
0 0
0 0
- 17. Gross Electrical Energy Generated (MWH) 0 0
0
- 18. Net Electric:d Energy Generated (MWH) fl/A N/A fl/A
- 19. Unit Service Factor N/A N/A N/A l
- 20. Unit Availability Facto, N/A N/A N/A
- 21. Unit Capacity Factor (Using MDC Net)
N/A N/A N/A
- 22. Unit Capacity Factor (Usir.g DER Net)
- 23. Unit Forced Outage Race N/A N/A N/A.
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
N/A N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operationi:
Forecast Achieved INITIAL CRITICALITY 6 1R R0 6-19-80 INITIAL ELECTRICITY.
COMMERCIAL OPERATION 7-21-80 (9/77)
AVERAGE DAILY UNIT POWER LEVEL 50-339 DOLMT NO.
NA2 g3,.3 5-2-80 DATE ll. R. Madison COMPLETED BY (703)894-5151 TELEPHONE MONTH April 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 0
1 17 0
0 18
~
0 19 4
0 0
20 0
5 21 0
6 0
0 22 0
0 f
7 23 0
0 8
24 0
25 10 0
0 26 11 0
0.
27 12 0
0 to 0
0 13 29 0
0 14 30 15 0
31 16 0
INSTRUCTIONS On tids format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
7 1,
DOCKET NO. _50-339 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME -fiA2 f-DATE 5-2-80 COMPLETED BY W. R Madison REPORT MONT11 April 1980
(/03)894-51bT TELEPil0NE l-
"i gt 3 = =a Licensee g*,
e e.
c Cause & Currective
.2 _e E
.g.s
)
No.
Date g
gg g
.555 Event
?
- 8. " '
Action to
$6 5
j di j Report #
r$ 0 Present Recurrence 6
)
Unit in startt p statu~
Critical ty has not been ach ieved.
h I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for I.ieensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4.Other (Explain) 0161)
E Operator Training & l.icense ExatnHalion F Administrative 5
G-Operational Error (Explain)
Exhibit 1 Same Soaree (9/77)
Il Other (Explain) 4 A