ML19323C814

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1980
ML19323C814
Person / Time
Site: North Anna  
Issue date: 05/02/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19323C812 List:
References
NUDOCS 8005190240
Download: ML19323C814 (7)


Text

.

O 8 005190h@

t VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH April YEAR 1980 SUBMITTED:

Y SUPEgNT - OPERATIONS APPROVED-

/

hfh N

STATION MANAGER

(

1 OPERATING DATA REIORT DOCKET?iO. 50-338 3-2-80 D A TE ~N K - PladISOR COMPLETED 3Y TELEPHONE T70 N -5151 OPERATING STATUS N*

1. Unit Name:

Mnrth ann' i April l969

2. Reporting Period:

2775

3. f 'W Therrnal Power AWt):

^

947

^' '

4. Nameplate Rating (Gross MWe):

907

5. Desgn Electrical Rating (Net MWe).

928

6. Maximum Dependable Capacity (Gross MWe):

898 7~ Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Thmugh 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Whach Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A This Month YrAo-Date Cumulative

11. Hours In Reporting Period 714 7cm 1A Ann
12. Number Of Hours Reactor Was Critical 641.3 2333.2 12.498.4
13. Reactor Reserve Shutdown Hours 49 41.9 190.2 633.7 2,176.4 12,229.6
14. Hours Generator On-Line 0

0 0

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 7n1 non 5.410.269' 31 640,lR')

l

17. Gross Electrical Energy Generated (MWH) 533 304 1.695.812 10.042.161
18. Net Electrical Energy Geneuted (MWH).

505,742 1,593,776 9.447.222 f

19. Unit Service Factor

__. '48.

75.O 73.1 88.

75.0 73.3

20. Unit Availability Facto, 78.3 61.1 63.1
21. Unit Capacity Factor (Using MDC Ne')

77.6 60.5 62.4

22. Unit Capacity Factor (Using DER Net)

II 7 R2 4?

l

23. Unit Forced Ouhge Rate l
24. Shutdowns Scheduled Over Next 6 Mor.ths (Type. Date,and Duration of Each):

May 16 throuch May 26.198C; Routina Maintonantn fUA

25. If Shur Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)

AVERAGE DAILY UNI"." POWER LEVEL DOCKET NO.

50-338 I

UNIT May 2, 1980 DATE ll. R. Madison COMPLETED BY 703-894-5151 TELEPHONE MONTH April 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 829 828 g

37 2

830 828 18 802 820 3

39 825 4

20 0

828 5

21 0

828 6

22 146 824 i

7 23 5

400 823 8

24 9

799 822 25 825 821 to 26 825 821 27 825 81 9 12 28 13 824 823 29 822 824 14 30 825 15 31' 822 16 INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the rieares! whole rnegawart.

(9/77)

A 50-338 I)OCKET NO.

f UNIT SilU11) OWNS AND POWER REI)UC110NS UNil' N AM E North Anna !

D A I E._3.-E-80 COMrtE1EI) HY G Nottfor_

l '-

REPORT hf 0NTil April 1980 intrinONE 03-894-5151 w.

5

~

I.lcentee h

\\

Cause & Currective

.h E 3

gj g

fg$h 5

Event y

Acilon su No.

Date g dij g Repent #

in t>

Prevent Recurrence c3 ::.,

a:

g a

i 80-12 800403 F

81.0 H*

3 LER/R080-37 SF Valvex High steam flow and low steam pressure safety injection with reactor trig. While attempting to perform a 3 stroke test on "A" I

main steam line trip valve the valve went fully closed.

Reset d

all MSTV's to proper degree of l;

stroke.

Will refrain from perfor-mance of thisitest at power.

i 80-13 800408 F

4.3 G*

3 NA

'NA NA Turbine trip caused reactor trip.

1 Electrical liydraulic control syster f

reservoir Lo-Lo level alarm

!'l actuation.. Limit switch was inad-vertantly operated by turbine p

operator while attempting to deter-mina raisse fnr Ili loval alarm 0 g or g g remigdeg to ver g. instruments rat l

J p

a an a ustmen i-F: Forced Reason:

Method:

Exhi511 G - Inst ructions l

S: Scheduled A Equipment Falture(Emplain),

I Manud for rseparatinn of Data B Maintenance of Test 2 Mr.oalScram.

Entry Shws fm !leensee G

C. Refueling

.I,'sutomatic Scram.

Eve'nt Repost (i.ER)l'ile (NUREG.

D-Reguistory Restrlethm 4-Othes (Explain) 01611 12 Operator Training & ticense Examinalkm 1

!I F.Adndnistrative 5

G-Operational lis tor (Explain)

Exhible 1. Same Source i

19/77)

II Othes (Explain) f a

f

  • See attached sheet.

]

Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH April UNIT NAME North Anna 1 YEAR 1980 DATE 5-8-80 COMPLETED BY 703-894-5151 ext. aus 80-12 (H) 4-3-80 Time: 2312 the performance test scheduled Operations Department to perform a 3 stroke test on the three main steam trip valves located in the main steam safeguards building.

The valve is automatically supposed to close down only by 3 to verify operability each 92 days, however, it traveled past this point and closed completely.

High steam flow resulted in remaining 2 lines with accompaning low pressure causing safety injection & reactor trip. The 3 MSTV's were inspected and their 0

3 limit reset.

The test is now no longer required to be performed while at power.

80-13 (G) 4-8-80 Time: 1147.. turbine' trip / reactor trip.

Operator in turbine building was investigating the cause of a High level alarm in the.EHC 1

reservoir. The actual level was normal.

He attempted to cycle the alarm switch to see if it was sticking but he was on the Lo-Lo alarm switch.

Upon Lo-Lo alarm both EHC pumps tripped lock-out causing low EHC pressure signal to trip the turbine.

)

I c

l l

OPERATING DATA REPORT 50-339 DOCKET NO.

DATE 5/2/80 i

l COMPLETED BY M R Madison t

TELEPHONE (700 904-5151 i

OPERATING STATUS North Anna Unit 2 Not*5

~

~

1. Unic Name:

Aoril 1980 North Anna 2 License NPF-7

2. Reporting Period:

issued for fuel loading and 139

3. Licensed Thermal Power (MW ):

low power testiTig.On'4 4. Nameplate Rating (Gross MWs):

g47 80.

907

5. Design Electrical Racing (Ne' MWe):

928

6. Maximum Dependable Cape ity (Gross MWe):

898 l

7. Maximum Dependabie Capt sity (Net MWe):

l

8. If Changes Occur in C speci:y Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:

l N/A N/A

9. Power Level To Wluch Restricted,if Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any:

This Month Yr. to-Date Cumulative Criticality not achieved

11. Hours tn Reporting Period
12. Number Of Hours Reactor Was Critical 0

0 0

0 0

0

13. Rescror Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours n

n n

10. C-oss Thermal Energy Generated (MWH) 0 0

0 0

0 0

17. Gross Electrical Energy Generated (MWH) 0 0

0

18. Net Electric:d Energy Generated (MWH) fl/A N/A fl/A
19. Unit Service Factor N/A N/A N/A l
20. Unit Availability Facto, N/A N/A N/A
21. Unit Capacity Factor (Using MDC Net)

N/A N/A N/A

22. Unit Capacity Factor (Usir.g DER Net)
23. Unit Forced Outage Race N/A N/A N/A.
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

N/A N/A

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status iPrior to Commercial Operationi:

Forecast Achieved INITIAL CRITICALITY 6 1R R0 6-19-80 INITIAL ELECTRICITY.

COMMERCIAL OPERATION 7-21-80 (9/77)

AVERAGE DAILY UNIT POWER LEVEL 50-339 DOLMT NO.

NA2 g3,.3 5-2-80 DATE ll. R. Madison COMPLETED BY (703)894-5151 TELEPHONE MONTH April 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 0

1 17 0

0 18

~

0 19 4

0 0

20 0

5 21 0

6 0

0 22 0

0 f

7 23 0

0 8

24 0

25 10 0

0 26 11 0

0.

27 12 0

0 to 0

0 13 29 0

0 14 30 15 0

31 16 0

INSTRUCTIONS On tids format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

7 1,

DOCKET NO. _50-339 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME -fiA2 f-DATE 5-2-80 COMPLETED BY W. R Madison REPORT MONT11 April 1980

(/03)894-51bT TELEPil0NE l-

"i gt 3 = =a Licensee g*,

e e.

c Cause & Currective

.2 _e E

.g.s

)

No.

Date g

gg g

.555 Event

?

8. " '

Action to

$6 5

j di j Report #

r$ 0 Present Recurrence 6

)

Unit in startt p statu~

Critical ty has not been ach ieved.

h I

2 3

4 F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for I.ieensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction 4.Other (Explain) 0161)

E Operator Training & l.icense ExatnHalion F Administrative 5

G-Operational Error (Explain)

Exhibit 1 Same Soaree (9/77)

Il Other (Explain) 4 A