05000346/LER-1980-035-03, /03L-0:on 800410,while Attempting to Switch from Decay Heat Removal Train 1 to Train 2,cooler 2 Outlet Valve Would Not Open.Caused by Malfunctioning of Valve Operator Radial Arm.Radial Arm Was Readjusted

From kanterella
(Redirected from ML19323B483)
Jump to navigation Jump to search
/03L-0:on 800410,while Attempting to Switch from Decay Heat Removal Train 1 to Train 2,cooler 2 Outlet Valve Would Not Open.Caused by Malfunctioning of Valve Operator Radial Arm.Radial Arm Was Readjusted
ML19323B483
Person / Time
Site: Davis Besse 
Issue date: 05/07/1980
From: Makatura L
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19323B481 List:
References
LER-80-035-03L, LER-80-35-3L, NUDOCS 8005120429
Download: ML19323B483 (2)


LER-1980-035, /03L-0:on 800410,while Attempting to Switch from Decay Heat Removal Train 1 to Train 2,cooler 2 Outlet Valve Would Not Open.Caused by Malfunctioning of Valve Operator Radial Arm.Radial Arm Was Readjusted
Event date:
Report date:
3461980035R03 - NRC Website

text

fJ;tC F oRM XG S'"

LICENSEE EVENT REPORT 8005120%

CONTROL DLOCK: l l

l l

l l

(PLE ASE PRINT oR TYPE ALL REQUIREO INFORMATION) l

]@

lolil l0 lH jD lB lS l1 l@l0 ]O l010 l010'l0 l0 l0 l0 l0 j@l 4l Il 1l 1l 1l@l 23 26 uCLNSE TYPE JO b1 C A T to LICEN5E NUVsE*4 3

8 9 L.OENME CODE 14 15 4 l6 Q0 l4 l1 l0 l8 l0l@l0l5l0l7[8 l0 l@

CC'4*T lojil 3{C"y l L l@l 0 l 5 l 0 l-l0 l 3 l 74 75 REPORT DATE 63 R

g C3 bJ EVENT OATE 60 61 COCKET NUYdEH EVENT DESCRIPTION AND PROBABLE CONSEGJENCES h1129 hours while attempt 7

8 l

19 l 2 l l(NP-33-80-43) on 4/10/80 at let Valve DH14A would not open l j o j 3 l lcoval (DUR) Train #1 to DHR Train #2, DHR Cooler #2 Out Train #1 was returned to service and Train #2 was declared inoperable.

j Jo14llbeyond 20%.

the time.

Therefore, the station did not enter the actior]

j o l s ; lThe station was in Mode 5 at lo lc l l statement of Technical Specification 3.5.2 which requires both DHR trains to be o There was no danger to the health and safety of the public l ling in Modes 1, 2, and 3.

o 7 l

DHR Train #1 was operating properly.

1 o la i lor station personnel.

'O 7

8 9 E

CoOE SLBCG E COYPONENT CODE SLBC dE S

E l0l91 lS lF l@ l El@ lB l@ l V l A l L l V l0 l P l@ {@ ] @

16 19 20 7

8 9

10 11 12 13 REV8510N OCCURRENCE REPORT.

CODE TYPE NO.

SEQUENTI AL h gU' l

l l

l_l l

l3l5l y

l0 l3 l g

l_l l0 l REPORT NO.

,_ EVENT YE AR LER PO R

_ 28 22 23 24 26 21 23 29 30 31 32 R

AKEN A T O' O PLA T tET HOURS 22 S E ITT FOR B.

5 plt U A*.

FACTLPED lB l@l A l@

l Z I@

lZ l@

l0l0l0l l

l Y l@

lAl@

lFl1l3l6 g 33 34 35 36 3/

40 di 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 1: lo l lThe cause of the occurrence can be traced to the radial arm of the valve operat The arm works in a very narrow area and it moved slightly sideways where it made I l,;,jl age.

in its meunting bracket. This restricted its movement to only 20%. l l contact with a bolt

, 7 The valve was declared operable at l

g,,.,j lUnder W O 328-80, the radius arm was readjusted.

Toledo Edison is investigating need for further corrections.

l

0750 hours0.00868 days <br />0.208 hours <br />0.00124 weeks <br />2.85375e-4 months <br /> on 4/11/S0.

80

[,54, 7

8 9 DISCOVERY DESCRIPTIC?J ST S

% POWER oTHER STATUS IS OV Y l

l1 l5 I b@ l 0l 0 l 0 l@l NA l

l A lgl operator observation so a

45 4e i2 o

A!TiviTY CoTnni LOCATION OF RELEASE AELEASED OF RELEASE AMOUNT oF ACTIVITY l

LZ J @ LZJ@l N^

l I NA i e PEaSONNEt ExPOSSES OESCRiPTioN@

l NuoeER TvPE li l 71 1010101@LZj@l NA 2

,ERSONNEt iNJu' RIES DESCRIPTION @

l NUYBE R l

FTil 101010 l@l NA 7

8 9 11 12 LOSS OF OR DAVAGE To FACILITY l

TYPE C E SC RIP TIO N El Z l@l NA 80 7

8 9 10 NRC USE ONLY PUR L ICI TY ISSUED

DESCRIPTION

l lIlIIIIllIl!!

- 15 ca 63 nai bb! NA DVR 80-062 to LS*0

'H kOt"E*

PHONE:

NAME OF PREPARER R

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80-43

'l DATE OF EVENT: April 10, 1980 FACILITY: Davis-Besse Unit 1 Decay Heat Removal Cooler #2 outlet flow control valve IDENTIFICATION OF OCCURRENCE:

DH14A would not open beyond 20%

The unit was in Mode 5, with Power (MRT) = 0, and Conditions Prior to Occurrence:

Load (Gross MWE) = 0.

i On April 10, 1980 at 1129 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.295845e-4 months <br /> while attempting to Description of Occurrence:

switch to #2 Decay Heat Removal Train for maintenance on #1, DH14A would not open Technical Specification 3.5.2.c requires two independent emergency beyond 20%.

Being core cooling systems (ECCS) subsystem to be operabic in Modes 1, 2, and 3.

This event is being reported in Mode 5, the unit did not enter the action statement.

l l

to document a component failure.

i The improper operation of valve DH14A l

Designation of Apparent Cause of Occurrence:

failure.

The proximity of the radius ara can be attributed to a nochanical component to the bracket mounting bolts allows only marginal clearance. Any movement of the of the radius arm towards the mounting bracket causes binding and limits movement radius arm.

3 There was no danger to the health and safety of the public I

. Analysis of Occurrence:

or to station personnel.

The #1 Decay Heat Removal train was operable during this time.

Under Maintenance Work Order IC-328-80, the radius arm on the d

Corrective Action

valve shaf t was moved away from the mounting bracket, thus providing clearance and allowing the valve to stroke fully. After meeting stroke time acceptance criteria required by Surveillance Test ST 5051.01, the valve was declared operable and returned I

to service on April 11, 1980 at 0750 hours0.00868 days <br />0.208 hours <br />0.00124 weeks <br />2.85375e-4 months <br />.

Toledo Edison is investigating further 4

corrective action that may be required on this or other similar valves.

There have been no previously reported failures of this type valve Failure Data:

l operator.

6 1

LER #80-035 i

i i