ML19323B120
| ML19323B120 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/20/1980 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reec C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19323B121 | List: |
| References | |
| NUDOCS 8005090464 | |
| Download: ML19323B120 (2) | |
See also: IR 05000373/1980008
Text
/
.8 0 o s u o u 4(,9'
,,
I
'o
UNITED STATES
8",,
NUCLEAR REGULATORY COMMISSION
k
n
$
.E
REGION lli
IlC
j
o,,
[
799 ROOSEVELT ROAD
% . . . +
d
GLEN ELLVN. ILLINolS 60137
M 2 0 280
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
P.O. Box 767
Chicago, IL 6000
This refers to the inspection conducted by Dr. M. J. Oestmann of this
office on January 30-31, February 1, 4, and 7,1980, of activities at
the LaSalle County Nuclear Station, Units 1 and 2, authorized by NRC
Construction Permits No. CPPR-99 and No. CPPR-100 and to the discussion
of our findings with Mr. R. H. Holyoak and Mr. C. McDonough and other
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspecti a consisted of
a selective examination of procedures and representative ecords, obser-
i
vations, and interviews with personnel.
Certain other activities, set forth in the enclosed Appendix A to this
letter, appear to be a deviation from commitments which you have made
in previous correspondence with the Commission.
Please advise us in
writing within twenty days of the corrective action you have taken or
plan to take, showing the estimated date of completion with regard to
this deviation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
,
Public Document Room, except as follows.
If the enclosures contain in-
formation that you or your contractors believe to be prcprietary, you
i
must apply in writing to this office, within twenty days of your receipt
of this letter, to withhold such information from public disclosure.
The application must include a full statement of the reasons for which
the information is considered proprietary, and should be prepared so
that proprietary information identified in the application is contained
in an enclosure to the application.
l
'
e
.
.
~
Commonwealth Edison Company
-2-
MAR 2 0 E60
We will gladly discuss any questions you have concerning this
inspection.
e
-
Sincerely,
(
"- ~b
o
A. B. Davis, Chief
Fuel Facility and
Materials Safety Branch
Enclosures:
1.
Appendix A, Notice
of Deviation
2.
IE Inspection Reports
No. 50-373/80-08;
and No. 50-374/S0-04
cc w/ encl:
Mr. D. L. Peoples, Director
Of Nuclear Licensing
Mr. L. J. Burke, Site
Project Superintendent
Mr. T. E. Quaka, Quality
Assurance Supervisor
Mr. R. H. Holyoak, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
i
l
l