ML19323B120

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/80-08 & 50-374/80-04 on 800130-31,0201,04 & 07 & Notice of Deviation
ML19323B120
Person / Time
Site: LaSalle  
Issue date: 03/20/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reec C
COMMONWEALTH EDISON CO.
Shared Package
ML19323B121 List:
References
NUDOCS 8005090464
Download: ML19323B120 (2)


See also: IR 05000373/1980008

Text

/

.8 0 o s u o u 4(,9'

,,

I

'o

UNITED STATES

8",,

NUCLEAR REGULATORY COMMISSION

k

n

$

.E

REGION lli

IlC

j

o,,

[

799 ROOSEVELT ROAD

% . . . +

d

GLEN ELLVN. ILLINolS 60137

M 2 0 280

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

P.O. Box 767

Chicago, IL 6000

This refers to the inspection conducted by Dr. M. J. Oestmann of this

office on January 30-31, February 1, 4, and 7,1980, of activities at

the LaSalle County Nuclear Station, Units 1 and 2, authorized by NRC

Construction Permits No. CPPR-99 and No. CPPR-100 and to the discussion

of our findings with Mr. R. H. Holyoak and Mr. C. McDonough and other

members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspecti a consisted of

a selective examination of procedures and representative ecords, obser-

i

vations, and interviews with personnel.

Certain other activities, set forth in the enclosed Appendix A to this

letter, appear to be a deviation from commitments which you have made

in previous correspondence with the Commission.

Please advise us in

writing within twenty days of the corrective action you have taken or

plan to take, showing the estimated date of completion with regard to

this deviation.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

,

Public Document Room, except as follows.

If the enclosures contain in-

formation that you or your contractors believe to be prcprietary, you

i

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained

in an enclosure to the application.

l

'

e

.

.

~

Commonwealth Edison Company

-2-

MAR 2 0 E60

We will gladly discuss any questions you have concerning this

inspection.

e

-

Sincerely,

(

"- ~b

o

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosures:

1.

Appendix A, Notice

of Deviation

2.

IE Inspection Reports

No. 50-373/80-08;

and No. 50-374/S0-04

cc w/ encl:

Mr. D. L. Peoples, Director

Of Nuclear Licensing

Mr. L. J. Burke, Site

Project Superintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

i

l

l